885 resultados para Contract prices


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This case book contains the essential sections of the most significant cases in Australian contract law. Ready access to this collection of cases enables students to experience the law through the judges’ own words, and to develop the skills of interpreting and analysing cases in order to refine their understanding of the law. Excerpts from important statutes and writings are also included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The significance of the proposed name of a building to buyers of units off the plan has received recent attention in Queensland and the ACT with differing results. In Gough v South Sky Investments Pty Ltd the Queensland Court of Appeal concluded that the name of the building was not an essential term of the contract and rejected a claim by a number of buyers to terminate their contracts because of the change of name from Oracle to Peppers. In contrast, Rares J in the Federal Court decision of Madison Constructions Pty Ltd v Empire Building Group (ACT) Pty Ltd considered that the name of the building in a proposed development could potentially form the basis of misleading conduct about the association of the seller with a particular development corporation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aftermath of the Queensland floods of January 2011 continues to be played out in the courts. The effect of the floods on such a large scale has awakened the use of some statutory provisions that have not previously been litigated .Section 64 of the Property Law Act 1974 (Qld) is such a section. A version of this provision appears as s 34 of the Sale of Land Act 1982 (Vic). Broadly speaking, these sections permit a buyer of a dwelling house which has been damaged or destroyed between contract and completion to rescind the contract and recover their deposit provided that the rescission notice is given prior to "the date of completion or possession". The Court of Appeal decision of Dunworth v Mirvac Queensland Pty Ltd [2011] QCA 200 appears to be the first litigation upon the application of the section since it came into force in 1975.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Feedback, both formative and summative, enables students to reflect on their understandings and to restructure their thinking to develop their capabilities. It can also encourage positive motivation and help boost self-esteem. Online multiple choice questions can be an efficient and effective means of providing timely formative feedback. At the same time, locating learning in a narrative environment can facilitate engaging and effective learning experiences. Narratives can help learners to navigate through information and support cognitive and imaginative engagement. This article will discuss The 00 Files, an online suite of modules containing multiple choice questions situated in the narrative of a fictional law firm. It notes student responses to the program and discusses lessons that may be learnt from its development which may be of assistance to academics considering the development of similar programs for their courses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes an empirical study to test the proposition that all construction contract bidders are homogeneous ie. they can be treated as behaving collectively in an identical (statistical) manner. Examination of previous analyses of bidding data reveals a flaw in the method of standardising bids across different size contracts and a new procedure is proposed which involves the estimation of a contract datum. Three independent sets of bidding data were then subjected to this procedure and estimates of the necessary distributional parameters obtained. These were then tested against the bidder homogeneity assumption resulting in the conclusion that the assumption may be appropriate for a three parameter log-normal shape, but not for scale and location.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a unified view of the relationship between (1) quantity and (2) price generating mechanisms in estimating individual prime construction costs/prices. A brief review of quantity generating techniques is provided with particular emphasis on experientially based assumptive approaches and this is compared with the level of pricing data available for the quantities generated in terms of reliability of the ensuing prime cost estimates. It is argued that there is a tradeoff between the reliability of quantity items and reliability of rates. Thus it is shown that the level of quantity generation is optimised by maximising the joint reliability function of the quantity items and their associated rates. Some thoughts on how this joint reliability function can be evaluated and quantified follow. The application of these ideas is described within the overall strategy of the estimator's decision - "Which estimating technique shall I use for a given level of contract information? - and a case is made for the computer generation of estimates by several methods, with an indication of the reliability of each estimate, the ultimate choice of estimate being left to the estimator concerned. Finally, the potential for the development of automatic estimating systems within this framework is examined.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Teachers of construction economics and estimating have for a long time recognised that there is more to construction pricing than detailed calculation of costs (to the contractor). We always get to the point where we have to say "of course, experience or familiarity of the market is very important and this needs judgement, intuition, etc". Quite how important is the matter in construction pricing is not known and we tend to trivialise its effect. If judgement of the market has a minimal effect, little harm would be done, but if it is really important then some quite serious consequences arise which go well beyond the teaching environment. Major areas of concern for the quantity surveyor are in cost modelling and cost planning - neither of which pay any significant attention to the market effect. There are currently two schools of thought about the market effect issue. The first school is prepared to ignore possible effects until more is known. This may be called the pragmatic school. The second school exists solely to criticise the first school. We will call this the antagonistic school. Neither the pragmatic nor the antagonistic schools seem to be particularly keen to resolve the issue one way or the other. The founder and leader of the antagonistic school is Brian Fine whose paper in 1974 is still the basic text on the subject, and in which he coined the term 'socially acceptable' price to describe what we now recognise as the market effect. Mr Fine's argument was then, and is since, that the uncertainty surrounding the contractors' costing and cost estimating process is such that the uncertainty surrounding the contractors' cost that it logically leads to a market-orientated pricing approach. Very little factual evidence, however, seems to be available to support these arguments in any conclusive manner. A further, and more important point for the pragmatic school, is that, even if the market effect is as important as Mr Fine believes, there are no indications of how it can be measured, evaluated or predicted. Since 1974 evidence has been accumulating which tends to reinforce the antagonists' view. A review of the literature covering both contractors' and designers' estimates found many references to the use of value judgements in construction pricing (Ashworth & Skitmore, 1985), which supports the antagonistic view in implying the existence of uncertainty overload. The most convincing evidence emerged quite by accident in some research we recently completed with practicing quantity surveyors in estimating accuracy (Skitmore, 1985). In addition to demonstrating that individual quantity surveyors and certain types of buildings had significant effect on estimating accuracy, one surprise result was that only a very small amount of information was used by the most expert surveyors for relatively very accurate estimates. Only the type and size of building, it seemed, was really relevant in determining accuracy. More detailed information about the buildings' specification, and even a sight to the drawings, did not significantly improve their accuracy level. This seemed to offer clear evidence that the constructional aspects of the project were largely irrelevant and that the expert surveyors were somehow tuning in to the market price of the building. The obvious next step is to feed our expert surveyors with more relevant 'market' information in order to assess its effect. The problem with this is that our experts do not seem able to verbalise their requirements in this respect - a common occurrence in research of this nature. The lack of research into the nature of market effects on prices also means the literature provides little of benefit. Hence the need for this study. It was felt that a clearer picture of the nature of construction markets would be obtained in an environment where free enterprise was a truly ideological force. For this reason, the United States of America was chosen for the next stage of our investigations. Several people were interviewed in an informal and unstructured manner to elicit their views on the action of market forces on construction prices. Although a small number of people were involved, they were thought to be reasonably representative of knowledge in construction pricing. They were also very well able to articulate their views. Our initial reaction to the interviews was that our USA subjects held very close views to those held in the UK. However, detailed analysis revealed the existence of remarkably clear and consistent insights that would not have been obtained in the UK. Further evidence was also obtained from literature relating to the subject and some of the interviewees very kindly expanded on their views in later postal correspondence. We have now analysed all the evidence received and, although a great deal is of an anecdotal nature, we feel that our findings enable at least the basic nature of the subject to be understood and that the factors and their interrelationships can now be examined more formally in relation to construction price levels. I must express my gratitude to the Royal Institution of Chartered Surveyors' Educational Trust and the University of Salford's Department of Civil Engineering for collectively funding this study. My sincere thanks also go to our American participants who freely gave their time and valuable knowledge to us in our enquiries. Finally, I must record my thanks to Tim and Anne for their remarkable ability to produce an intelligible typescript from my unintelligible writing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reports of immoral marketing practices i n the construction industry attract political, media and public but not much academic interest. This paper adopts a behavioural perspective and proposes a model for applying marketing ethics concepts and methods in the study of collusion in the construction contract market. An extensive multidisciplinary review of existing literature identified a lack of adequate conceptualisation of the mechanisms and decision making factors of collusive tendering. The process of developing the model is detailed in this paper. The objectives and methodology of the research project that tested the model are also outlined. The paper concludes with a brief note on the contributions and application of the proposed model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sweden’s protest against the Vietnam War was given tangible form in 1969 through the decision to give economic aid to the Government of North Vietnam. The main outcome was an integrated pulp and paper mill in the Vinh Phu Province north-west of Hanoi. Known as Bai Bang after its location, the mill became the most costly, one of the longest lasting and the most controversial project in the history of Swedish development cooperation. In 1996 Bai Bang produced at its full capacity. Today the mill is exclusively managed and staffed by the Vietnamese and there are plans for future expansion. At the same time a substantial amount of money has been spent to reach these achievements. Looking back at the cumbersome history of the project the results are against many’s expectations. To learn more about the conditions for sustainable development Sida commissioned two studies of the Bai Bang project. Together they touch upon several important issues in development cooperation over a period of almost 30 years: the change of aid paradigms over time, the role of foreign policy in development cooperation, cultural obstacles, recipient responsibility versus donor led development etc. The two studies were commissioned by Sida’s Department for Evaluation and Internal Audit which is an independent department reporting directly to Sida’s Board of Directors. One study assesses the financial and economic viability of the pulp and paper mill and the broader development impact of the project in Vietnam. It has been carried out by the Centre for International Economics, an Australian private economic research agency. The other study analyses the decision-making processes that created and shaped the project over a period of two decades, and reflects on lessons from the project for development cooperation in general. This study has been carried out by the Chr. Michelsen Institute, a Norweigan independent research institution.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction contracts often provide that the decision of an independent certifier is final and binding. The effect of a contractual term like this has been debated in the courts over time. This paper considers the binding nature of certificates in the context of traditional construction contract arrangements and also considers the implications for more complex contracts like those entered into to facilitate public private partnerships. This article considers the response of the courts and the drafting implications and argues that a different focus would be advantageous.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aims of this project is to develop demand side response model which assists electricity consumers who are exposed to the market price through aggregator to manage the air-conditioning peak electricity demand. The main contribution of this research is to show how consumers can optimise the energy cost caused by the air-conditioning load considering the electricity market price and network overload. The model is tested with selected characteristics of the room, Queensland electricity market data from Australian Energy Market Operator and data from the Bureau of Statistics on temperatures in Brisbane, during weekdays on hot days from 2011 - 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The occurrence of extreme movements in the spot price of electricity represents a significant source of risk to retailers. A range of approaches have been considered with respect to modelling electricity prices; these models, however, have relied on time-series approaches, which typically use restrictive decay schemes placing greater weight on more recent observations. This study develops an alternative, semi-parametric method for forecasting, which uses state-dependent weights derived from a kernel function. The forecasts that are obtained using this method are accurate and therefore potentially useful to electricity retailers in terms of risk management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction contracts often provide that decisions under the contract will be made by a certifier. This paper reviews the liability issues when a certifier makes a mistake. We do that in light of recent pronouncements by the High Court of Australia and the New South Wales Court of Appeal on negligence. We look at this question in the context of traditional construction contract arrangements and also consider the implications for Public Private Partnerships and the typical contract arrangements entered into to facilitate these transactions.