Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This book is an empirical study of strategic management practices in the construction industry. It examines the dynamic capabilities paradigm within the context of the Indonesian construction industry. The characteristics of asset-capability combinations were found to be significant determinants of the competitive advantage of the Indonesian construction enterprises, and that such advantage sequentially contributes to organizational performance. In doing so, this study fills an important gap in the empirical literature and reinforces the dynamic capabilities framework’s recognition as a rigorous theory of strategic management. As the dynamic capabilities framework can work in the context of Indonesia, it suggests that the framework has potential applicability in other emerging and developing countries

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main aim of this paper is to outline a proposed program of research which will attempt to quantify the extent of the problem of alcohol and other drugs in the Australian construction industry, and furthermore, develop an appropriate industry-wide policy and cultural change management program and implementation plan to address the problem. This paper will also present preliminary results from the study. The study will use qualitative and quantitative methods (in the form of interviews and surveys, respectively) to evaluate the extent of the problem of alcohol and other drug use in this industry, to ascertain the feasibility of an industry-wide policy and cultural change management program, and to develop an appropriate implementation plan. The study will be undertaken in several construction organisations, at selected sites in South Australia, Victoria and Northern Territory. It is anticipated that approximately 500 employees from the participating organisations across Australia will take part in the study. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) will be used to measure the extent of alcohol use in the industry. Illicit drug use, ‘‘readiness to change’’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding workplace AOD impairment, will also be measured through a combination of interviews and surveys. Among the preliminary findings, for 51% (n=127) of respondents, score on the AUDIT indicated alcohol use at hazardous levels. Of the respondents who were using alcohol at hazardous levels, 76% reported (n97) that they do not have a problem with drinking and 54% (n=68) reported that it would be easy to ‘‘cut down’’ or stop drinking. Nearly half (49%) of all respondents (n=122) had used marijuana/cannabis at some time prior to being surveyed. The use of other illicit substances was much less frequently reported. Preliminary interview findings indicated a lack of adequate employee knowledge regarding the physical effects of alcohol and other drugs in the workplace. As for conclusions, the proposed study will address a major gap in the literature with regard to the extent of the problem of alcohol and other drug use in the construction industry in Australia. The study will also develop and implement a national, evidence-based workplace policy, with the aim of mitigating the deleterious effects of alcohol and other drugs in this industry.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Work in the Australian construction industry is fraught with risk and the potential for serious harm. The industry is consistently placed within the three most hazardous industries to work along with other industries such as mining and transport (National Occupational Health and Safety Commission, 2003). In the 2001 to 2002 period, construction work killed 39 people and injured 13,250 more. Hence, more effort is required to reduce the injury rate and maximise the value of the rehabilitation/back-to-work process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Contractors have to bid competitively for most of their work and at the same time deal with the risks and uncertainties connected with bid submission. This article examines the factors involved in tender pricing and how they interrelate. From this, a conceptual model of contractors’ pricing strategy is developed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Knowledge management (KM) provides a structured process to establish the link between knowledgebased assets within an organisation and its desired business objectives. Although KM issues are becoming increasingly important to the construction industry, there is currently no measurement tool for assessing the implementation of KM programmes. This paper reports on the development of such a tool which can be used as both a means of self-assessment and also for benchmarking purposes. Important practices needed for successful KM implementation were identified from the literature and via a self-administered survey targeting large and medium construction organisations in Hong Kong. Survey findings demonstrate the potential of the proposed self-assessment tool to measure the individual’s perception of the relative importance of KM antecedents and practices, also providing early insight of KM implementation by highlighting the negative gaps between what “is” and “should be” happening, thus identifying areas that need re alignment of KM strategies and tactics. The paper also suggests this tool could be further developed to help organisations to formulate and modify their KM programmes according to their own specific internal business environment, and the nature of their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

China’s national construction industry is now preparing to face the challenges, and to seize the opportunities, resulting from China’s entry to the World Trade Organisation (WTO). With the foreign direct investment (FDI) hitting a record high of around US$52.7 billion in 2002, China is believed to have now surpassed the USA as the world’s favorite destination for foreign investment. This fact, coupled with the huge potential for infrastructure development, indicates that the relatively large proportion of FDI flowing into the national construction industry will continue to increase in the foreseeable future. Positive aspects of FDI flowing will definitely help forging new industrial capabilities for China’s construction industry, thus helping it to achieve the ambitious strategic targets set by the Government for exporting construction goods and services. To shed some light on the position of the national industry in the global economy, this paper briefly presents the current international standing of China’s construction industry and qualitatively appraises potential positive influences of, and challenges associated with, FDI on the national industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Anecdotal evidence from the infrastructure and building sectors highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Currently, there is no clear evidence on the prevalence and risk of AOD use among Australian construction workers and there is limited evidential guidance regarding how to effectively address such an issue. Aims: The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A nationally consistent and collaborative approach across the workforce will be adopted. Methods: A national assessment of the use of AODs was conducted in participating organisations across three states. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) was used to measure alcohol use. Illicit drug use, ‘readiness to change’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding AOD was also measured through a combination of survey items and interviews. Through an educative approach and consultation with employers, employees, union groups and leaders in applied AOD research, this assessment was used to inform and support cultural change management of AOD use in the industry. Results: Results (n=494) indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol use. Other drug use was also identified as a major issue. Interview responses and input from all project partners is presented within a guiding principle framework for cultural change. Conclusions: Results support the need for evidence-based, comprehensive and tailored responses in the workplace. This paper will discuss the final results in the context of facilitating cultural change in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Australia is currently experiencing a resources boom and jobs in the male dominated fields of construction and engineering are at a premium. Employment in the construction industry, historically and today, is overwhelmingly male and, with an ageing population this predominately older male workforce will be retiring in greater numbers in the coming decade. Despite more that 25 years of anti- discrimination legislation and equal opportunity legislation these industries still employ few women in operational roles. This paper investigates the issue of the low representation of women in the construction industry. Our investigation involves the analysis of 95 organisation progress reports on the equal opportunity strategic programs in the construction industry. Findings indicate that this industry is not engaging with equal employment opportunity programs and further that equity outcomes for women in the industry are not evident.