986 resultados para Airport construction contracts
Resumo:
Includes IDOT's Construction Memorandum No. 99-4 entitled: Contract changes, articles 104.02 and 109.04, effective March 1, 1999.
Resumo:
Official publication and invitation issued by the Dept. of Transportation, for bids on Federal-aid and State road and bridge work.
Resumo:
Mode of access: Internet.
Resumo:
"B-271489"--P. 1.
Resumo:
"An edited version of the report Professional liability and responsibility, prepared in collaboration with the Subcommittee on Professional Liability and Responsibility of American Institute of Architects-Engineers Joint Council Liaison Committee."
Resumo:
This article analyzes the role of expert witness testimony in the trials of social movement actors, discussing the trial of the "Kingsnorth Six" in Britain and the trials of activists currently mobilising against airport construction at Notre Dame des Landes in western France. Though the study of expert testimony has so far overwhelmingly concentrated on fact-finding and admissibility, the cases here reveal the importance of expert testimony not simply in terms of legal argument, but in "moral" or political terms, as it reflects and constitutes movement cognitive praxis. In the so-called climate change defence presented by the Kingsnorth Six, I argue that expert testimony attained a "negotiation of proximity," connecting different types of contributory expertise to link the scales and registers of climate science with those of everyday understanding and meaning. Expert testimony in the trials of activists in France, however, whilst ostensibly able to develop similar bridging narratives, has instead been used to construct resistance to the airport siting as already proximate, material, and embedded. To explain this, I argue that attention to the symbolic, as well as instrumental, functions of expert testimony reveals the crucial role that collective memory plays in the construction of both knowledge and grievance in these cases. Collective memory is both a constraint on and catalyst for mobilisation, defining the boundaries of the sayable. Testimony in trials both reflects and reproduces these elements and is a vital explanatory tool for understanding the narrativisation and communication of movement identities and objectives. © 2013 The Author. Law & Policy © 2013 The University of Denver/Colorado Seminary.
Resumo:
El presente trabajo de grado, tuvo como propósito identificar los riesgos presentes en la construcción de un proyecto de infraestructura vial y analizar cuál sería su impacto en la Tasa Interna de Retorno TIR, en caso de que estos se materialicen -- Para dar cumplimiento a estos objetivos se realizó el estudio de varios proyectos de infraestructura vial apoyado en visitas aprovechando las nuevas concesiones viales que surgen en el País como es el caso de las 4G o cuarta generación de concesiones viales, al igual que se utilizaron modelos de simulación, para representar los escenarios en los cuales los riesgos se puede presentar y afectar la inversión realizada, afectando los ingresos esperados a futuro
Resumo:
This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.
Resumo:
This book analyses the principles underlying the construction and application of a number of boilerplate and other clauses commonly included in commercial contracts. The first Part of the work deals with general principles of interpretation. It then considers clauses which allocate commercial risk; clauses relating to performance; clauses introducing new parties by way of assignment, novation or nomination; clauses such as guarantees and indemnities which create liabilities in third parties; and dispute resolution clauses including governing law. The authors highlight common issues surrounding the application of these clauses in practice and, where appropriate, make drafting recommendations based on their analysis of case law and the operation of relevant statutes. This is a very accessible resource for all commercial practitioners.
Resumo:
The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.
Resumo:
This paper discusses a model based on the agency theory to analyze the optimal transfer of construction risk in public works contracts. The base assumption is that of a contract between a principal (public authority) and an agent (firm), where the payment mechanism is linear and contains an incentive mechanism to enhance the effort of the agent to reduce construction costs. A theoretical model is proposed starting from a cost function with a random component and assuming that both the public authority and the firm are risk averse. The main outcome of the paper is that the optimal transfer of construction risk will be lower when the variance of errors in cost forecast, the risk aversion of the firm and the marginal cost of public funds are larger, while the optimal transfer of construction risk will grow when the variance of errors in cost monitoring and the risk aversion of the public authority are larger