1000 resultados para 001 GAAS


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The interplay between Rashba, Dresselhaus, and Zeeman interactions in a quantum well submitted to an external magnetic field is studied by means of an accurate analytical solution of the Hamiltonian, including electron-electron interactions in a sum-rule approach. This solution allows us to discuss the influence of the spin-orbit coupling on some relevant quantities that have been measured in inelastic light scattering and electron-spin resonance experiments on quantum wells. In particular, we have evaluated the spin-orbit contribution to the spin splitting of the Landau levels and to the splitting of charge- and spin-density excitations. We also discuss how the spin-orbit effects change if the applied magnetic field is tilted with respect to the direction perpendicular to the quantum well.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PURPOSE: To compare clinical benefit response (CBR) and quality of life (QOL) in patients receiving gemcitabine (Gem) plus capecitabine (Cap) versus single-agent Gem for advanced/metastatic pancreatic cancer. PATIENTS AND METHODS: Patients were randomly assigned to receive GemCap (oral Cap 650 mg/m(2) twice daily on days 1 through 14 plus Gem 1,000 mg/m(2) in a 30-minute infusion on days 1 and 8 every 3 weeks) or Gem (1,000 mg/m(2) in a 30-minute infusion weekly for 7 weeks, followed by a 1-week break, and then weekly for 3 weeks every 4 weeks) for 24 weeks or until progression. CBR criteria and QOL indicators were assessed over this period. CBR was defined as improvement from baseline for >or= 4 consecutive weeks in pain (pain intensity or analgesic consumption) and Karnofsky performance status, stability in one but improvement in the other, or stability in pain and performance status but improvement in weight. RESULTS: Of 319 patients, 19% treated with GemCap and 20% treated with Gem experienced a CBR, with a median duration of 9.5 and 6.5 weeks, respectively (P < .02); 54% of patients treated with GemCap and 60% treated with Gem had no CBR (remaining patients were not assessable). There was no treatment difference in QOL (n = 311). QOL indicators were improving under chemotherapy (P < .05). These changes differed by the time to failure, with a worsening 1 to 2 months before treatment failure (all P < .05). CONCLUSION: There is no indication of a difference in CBR or QOL between GemCap and Gem. Regardless of their initial condition, some patients experience an improvement in QOL on chemotherapy, followed by a worsening before treatment failure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The oxidation of GaAs and AlxGa1−xAs targets by oxygen irradiation has been studied in detail. It was found that the oxidation process is characterized by the strong preferential oxidation of Al as compared to Ga, and of Ga as compared to As. This experimental observation, which has been accurately quantified by using x‐ray photoelectron spectroscopy, is connected to the different heats of formation of the corresponding oxides. The oxide grown by ion beam oxidation shows a strong depletion in As and relatively low oxidation of As as well. The depletion can be associated with the preferential sputtering of the As oxide in respect to other compounds whereas the low oxidation is due to the low heat of formation. In contrast Al is rapidly and fully oxidized, turning the outermost layer of the altered layer to a single Al2O3 overlayer, as observed by transmission electron microscopy. The radiation enhanced diffusion of oxygen and aluminum in the altered layer explains the large thickness of these altered layers and the formation of Al oxides on top of the layers. For the case of ion‐beam oxidation of GaAs a simulation program has been developed which describes adequately the various growth mechanisms experimentally observed

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Silver Creek is a warm water stream resource located in one of the most intensely cropped portions of Clayton County. The stream has been included on Iowa’s 303(d) list of impaired waters since 2002. Aquatic life, which should be present in Silver Creek, isn’t there. According to the Draft Total Maximum Daily Load (TMDL) for Silver Creek, the primary nonpoint pollution sources are soil erosion from agricultural land uses and direct deposition of ammonia by livestock with access to the stream. The Clayton Soil & Water Conservation District has begun efforts to remove Silver Creek from the impaired waters list. The District has promoted stream corridor and sinkhole protection, and the installation of buffer practices along Silver Creek and its tributaries. Conservation practices have been targeted to crop fields to reduce sediment delivery to the stream. A series of news articles, newsletters, and field days have been utilized to increase public understanding of water quality issues. Landowner interest has outweighed available cost share resources. Additional financial support will allow the project to build upon its early successes, to further address the identified impairments, and to respond to a long list of landowners that are interested in conservation work on their farms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Summit Lake Watershed Improvement Project is a watershed-based sediment control project designed to greatly reduce to nearly eliminate sedimentation of an existing lake that is being renovated for use as a water source in southern Iowa. Summit Lake is owned by the City of Creston and was once a water source lake until around 1984. The watershed improvements will include lakeshore stabilization and erosion control practices as a precursor for related improvements to the lake and overall 4,900-acre watershed. Best practices included in this phase are the implementation of riprap, a rain garden, grade stabilization structures, grassed waterways, terraces, basins, water use and access ordinances, education and outreach, water monitoring, and other stream bank improvements. These improvements, along with leveraged work to be done by strategic partners, will enable the lake to be used for local and regional water supplies by sustaining the lake for many years to come. Without the lake rehabilitation, the lake will likely be filled with sedimentation to the point that it will have no recreational value. Key partners are the City of Creston, IDNR, Southern Iowa Rural Water Association, Union County, the Union County NRCS office, Southwestern Community College, and the Summit Lake Association, which is a non-profit group of landowners working to protect the lake. The project will address WIRB targets: a) streambank stabilization, b) livestock runoff, c) agricultural runoff and drainage, d) stormwater runoff, and e) a section of inadequately sewered community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Twelve-Mile Lake is an 800-acre man-made lake in central Union County. The watershed has 13,964 land acres that are used by farmers for row crops and pasture. This lake is used as a water supply source for the City of Creston and the Southern Iowa Rural Water Association. In total approximately 40,000 people are affected by this project. Developed over 20 years ago, the lake and fishery was renovated and restocked and much of the shoreline was riprapped about six years ago. During its history, extensive watershed efforts have been ongoing. However, as farmland for cropland has become more valuable and demand has increased, hilly land once used for dairy farming, grazing, and CRP has been put into row crop production. Consequently, sediment loss has become an increasing issue for farmers, conservation professionals, and the Creston Waterworks Department, which owns the water treatment facility at the lake. In 2011, the Creston Water Board received a WIRB grant to implement a sedimentation structure at the north end of the main channel flowing into the lake. The WIRB funds were used for land acquisition, with the IDNR actually constructing the facility. This report depicts work performed as part of the WIRB project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Williamson Pond is a 26-acre publicly owned lake located about 2 miles east of the town of Williamson, in Lucas County. It has a watershed area of 1,499 acres. It has been managed since 1976 by the Lucas County Conservation Board (while still under state ownership) for fishing, boating, hunting, picnicking and other passive uses. Designated uses are Class AI, primary contact, and Class B (LW) aquatic life. Williamson Pond is on the 2004 EPA 303(d) List of Impaired Waters. A Total Maximum Daily Load (TMDL) for turbidity and nutrients at Williamson Pond was prepared by IDNR in 2005 and approved by EPA in 2006. The TMDL set reduction targets for both suspended sediment and phosphorus. The Williamson Pond Watershed Management Plan has provided the local work group and partners with information to develop and implement strategies to improve and protect water quality. These strategies are based on a three phase approach that will ultimately lead the removal of Williamson Pond from the Impaired Waters List. The goals identified in this proposal (Phase I) will reduce sediment and phosphorus delivery by 453 tons and 589 pounds annually. The Lucas County SWCD has and will continue to provide leadership on the Williamson Pond Project and has secured the partnerships necessary to address water quality problems and hired a part-time project coordinator to manage, implement, and oversee all activities pertaining to this proposal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project would target Norfolk Creek Subwatershed for land treatment practices. The Norfolk Creek Subwatershed is 14,035 acres located southwest of Waukon. The landscape is characterized by rugged karst topography and is marked with hundreds of sinkholes, providing direct drainage into the water table, affecting wells, springs, and community water sources. The surface groundwater runoff from this karst landscape eventually flows into the Yellow River. The potential point and non-point pollution sources are complicated and expensive to resolve. Extensive water quality monitoring has been completed on Norfolk Creek and has tested high in many parameters. We hope that with the upland treatment included in this grant request, terraces, grade stabilization structures, sediment control basins, and livestock manure management systems, these will improve. Continued water quality sampling will monitor this. This application has been reviewed and approved by the Allamakee County Soil and Water Conservation District Commissioners.