931 resultados para Uninterruptable Power Supply


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Major in Competition and Regulation

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Welland Power and Supply Canal Company Limited, established in 1893 and incorporated in 1894 with a capital stock of $500,000. The aim of the company was to harness the natural water supply of the Niagara and Welland Rivers. In 1898 the Canadian Electrical News published a report by Henry Symons, QC outlining the main project of the company. This project involves the construction of a canal from the Welland River to the brow of the mountain at Thorold, a distance of 8 miles; the construction at Thorold of a power house, and from Thorold to Lake Ontario, a raceway by which to carry water into the lake. The estimate for the machinery to generate 100,000 horse power is £125,000; for transmission line to Toronto at a voltage of 10,000….The total estimate therefore amounts to £2,452,162, or roughly speaking, $12,000,000. Source: Canadian Electrical News, August 1898, p. 172. In 1899 the company officers petitioned the federal government desiring a name change to the Niagara-Welland Power Company Limited. Officers of the company were Harry Symons, President; Charles A. Hesson, Vice-President; and M.R. O’Loughlin, James B. Sheehan, James S. Haydon, Frederick K. Foster, directors; John S. Campbell, secretary-treasurer. The company’s head offices were located in St. Catharines, with a New York (City) office on Broad Street. In 1905 and 1909 the company petitioned the federal government for additional time to construct its works, which was granted. The company had until May 16, 1915 to complete construction. John S. Campbell (1860-1950) was a graduate of the University of Toronto and Osgoode Hall. During his university years John began his military career first in "K" Company, Queens Own rifles and then later as Commanding Officer of the 19th Lincoln Regiment, from 1906 to 1910. Upon his return to St. Catharines John Campbell served as secretary in the St. Catharines Garrison Club, a social club for military men begun in 1899. After being called to the Bar, he became a partner in the firm of Campbell and McCarron and was appointed to the bench in 1916, serving until retirement in 1934. Judge Campbell served as an alderman for several terms and was the mayor of St. Catharines in 1908 and 1909. He also served as the first chairman of the St. Catharines Public Utilities in 1914. John S. Campbell was married to Elizabeth Oille, daughter of Jerome B. and Charlotte (St. John) Oille. The family home "Cruachan" was located at 32 Church St.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

John Butler (1728-1796) was originally from Connecticut but settled with his family in the Mohawk valley of New York around 1742. His father was a Captain in the British army and well acquainted with William Johnson (superintendent of Northern Indians). Butler impressed Johnson with his aptitude for Indian languages and diplomacy. He began to work with Johnson in 1755, and received several promotions in the department, until his apparent retirement in the early 1770s. At the onset of the Revolutionary War in 1775, Butler relocated to Canada to join the British forces, settling in Niagara. During the War, Butler was instrumental in maintaining the alliance with the Indians. After the War, Butler became prominent in local affairs in Niagara, but failed to secure any important offices when the province of Upper Canada was formed in 1792. In an effort to recoup some of the financial losses his family suffered during the War, Butler illegally attempted to supply trade goods to the Indian department with his son Andrew, his nephew Walter Butler Sheehan, and Samuel Street, a Niagara merchant.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Association of Major Power Consumers in Ontario (AMPCO) was founded as the Niagara Basic Power Users' Association in the early 1960s. It was a coalition of seven companies in the chemical, pulp and paper, and abrasives industries within the Niagara region. The Association was formed to address increasing electricity rates. In 1974, the name changed to the Association of Direct Customers of Ontario. This change reflected the expansion of the regional Association to a provincial one, which grew in response to Ontario Hydro’s proposed rate increases of over 30 per cent. In 1975, the Association adopted its current name. AMPCO continues to advocate for “electricity rates that are competitive, fair and efficient, and a reliable supply of electrical energy across Ontario.”

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La délégation du pouvoir de gestion aux administrateurs et aux gestionnaires, une caractéristique intrinsèque à la gestion efficace de grandes entreprises dans un contexte de capitalisme, confère une grande discrétion à l’équipe de direction. Cette discrétion, si elle n’est pas surveillée, peut mener à des comportements opportunistes envers la corporation, les actionnaires et les autres fournisseurs de capital qui n’ont pas de pouvoir de gestion. Les conflits entre ces deux classes d’agents peuvent émerger à la fois de décisions de gouvernance générale ou de transactions particulières (ie. offre publique d’achat). Dans les cas extrêmes, ces conflits peuvent mener à la faillite de la firme. Dans les cas plus typiques, ils mènent l’extraction de bénéfices privés pour les administrateurs et gestionnaires, l’expropriation des actionnaires, et des réductions de valeur pour la firme. Nous prenons le point de vue d’un petit actionnaire minoritaire pour explorer les méchanismes de gouvernance disponibles au Canada et aux États‐Unis. Après une synthèse dans la Partie 1 des théories sous‐jacentes à l’étude du pouvoir dans la corporation (séparation de la propriété et du contrôle et les conflits d’agence), nous concentrons notre analyse dans la Partie 2 sur les différents types de méchanismes (1) de gouvernance interne, (2) juridiques et (3) marchands, qui confèrent du pouvoir aux deux classes d’agents. Nous examinons comment les intérêts de ces deux classes peuvent être réalignés afin de prévenir et résoudre les conflits au sein de la firme. La Partie 3 explore un équilibre dynamique de pouvoir corporatif qui cherche à minimiser le potentiel d’opportunisme toute en préservant une quantité de discrétion suffisante pour la gestion efficace de la firme. Nous analysons des moyens pour renforcer les protections des actionnaires minoritaires et proposons un survol des pistes de réforme possibles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article examines the operational characteristics of supply-chain partnerships and identifies the relational attributes that cultivate knowledge transfer in such partnerships. A set of theoretical propositions are developed. A case study of a computer manufacturer's supply chain was conducted to examine their validity. The findings support the view that trust, commitment, interdependence, shared meaning, and balanced power facilitate knowledge transfer in supply-chain partnerships, and that knowledge transfer should be treated as a dynamic multistage process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Almost all the electricity currently produced in the UK is generated as part of a centralised power system designed around large fossil fuel or nuclear power stations. This power system is robust and reliable but the efficiency of power generation is low, resulting in large quantities of waste heat. The principal aim of this paper is to investigate an alternative concept: the energy production by small scale generators in close proximity to the energy users, integrated into microgrids. Microgrids—de-centralised electricity generation combined with on-site production of heat—bear the promise of substantial environmental benefits, brought about by a higher energy efficiency and by facilitating the integration of renewable sources such as photovoltaic arrays or wind turbines. By virtue of good match between generation and load, microgrids have a low impact on the electricity network, despite a potentially significant level of generation by intermittent energy sources. The paper discusses the technical and economic issues associated with this novel concept, giving an overview of the generator technologies, the current regulatory framework in the UK, and the barriers that have to be overcome if microgrids are to make a major contribution to the UK energy supply. The focus of this study is a microgrid of domestic users powered by small Combined Heat and Power generators and photovoltaics. Focusing on the energy balance between the generation and load, it is found that the optimum combination of the generators in the microgrid- consisting of around 1.4 kWp PV array per household and 45% household ownership of micro-CHP generators- will maintain energy balance on a yearly basis if supplemented by energy storage of 2.7 kWh per household. We find that there is no fundamental technological reason why microgrids cannot contribute an appreciable part of the UK energy demand. Indeed, an estimate of cost indicates that the microgrids considered in this study would supply electricity at a cost comparable with the present electricity supply if the current support mechanisms for photovoltaics were maintained. Combining photovoltaics and micro-CHP and a small battery requirement gives a microgrid that is independent of the national electricity network. In the short term, this has particular benefits for remote communities but more wide-ranging possibilities open up in the medium to long term. Microgrids could meet the need to replace current generation nuclear and coal fired power stations, greatly reducing the demand on the transmission and distribution network.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The early twentieth century constituted the heyday of the ‘breadwinner–homemaker’ household, characterized by a high degree of intra-household functional specialization between paid and domestic work according to age, gender, and marital status. This article examines the links between formal workforce participation and access to resources for individualized discretionary spending in British working-class households during the late 1930s, via an analysis of household leisure expenditures. Leisure spending is particularly salient to intra-household resource allocation, as it constitutes one of the most highly prioritized areas of individualized expenditure, especially for young, single people. Using a database compiled from surviving returns to the Ministry of Labour's national 1937/8 working-class expenditure survey, we examine leisure participation rates for over 600 households, using a detailed set of commercial leisure activities together with other relevant variables. We find that the employment status of family members other than the male breadwinner was a key factor influencing their access to commercial leisure. Our analysis thus supports the view that the breadwinner–homemaker household was characterized by strong power imbalances that concentrated resources—especially for individualized expenditures—in the hands of those family members who engaged in paid labour.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Thermal generation is a vital component of mature and reliable electricity markets. As the share of renewable electricity in such markets grows, so too do the challenges associated with its variability. Proposed solutions to these challenges typically focus on alternatives to primary generation, such as energy storage, demand side management, or increased interconnection. Less attention is given to the demands placed on conventional thermal generation or its potential for increased flexibility. However, for the foreseeable future, conventional plants will have to operate alongside new renewables and have an essential role in accommodating increasing supply-side variability. This paper explores the role that conventional generation has to play in managing variability through the sub-system case study of Northern Ireland, identifying the significance of specific plant characteristics for reliable system operation. Particular attention is given to the challenges of wind ramping and the need to avoid excessive wind curtailment. Potential for conflict is identified with the role for conventional plant in addressing these two challenges. Market specific strategies for using the existing fleet of generation to reduce the impact of renewable resource variability are proposed, and wider lessons from the approach taken are identified.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A technique to calculate the current waveform for both close-up and remote short-circuit faults on DC supplied railways and subways is presented. Exact DC short-circuit current calculation is best performed by sophisticated computer transient simulations. However, an accurate simplified calculation method based on second-order approximation which can be easily executed with the help of a calculator or a spreadsheet program is proposed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this study was to investigate electricity supply solutions for an educationalcenter that is being built in Chonyonyo Tanzania. Off-grid power generation solutions andfurther optimization possibilities were studied for the case.The study was done for Engineers Without Borders in Sweden. Who are working withMavuno Project on the educational center. The school is set to start operating in year 2015with 40 girl students in the beginning. The educational center will help to improve genderequality by offering high quality education in a safe environment for girls in rural area.It is important for the system to be economically and environmentally sustainable. Thearea has great potential for photovoltaic power generation. Thus PV was considered as theprimary power generation and a diesel generator as a reliable backup. The system sizeoptimization was done with HOMER. For the simulations HOMER required componentdata, weather data and load data. Common components were chose with standardproperties, the loads were based on load estimations from year 2011 and the weather datawas acquired from NASA database. The system size optimization result for this base casewas a system with 26 kW PW; 5.5 kW diesel generator, 15 kW converter and 112 T-105batteries. The initial cost of the system was 55 875 €, the total net present cost 92 121 €and the levelized cost of electricity 0.264 €/kWh.In addition three optimization possibilities were studied. First it was studied how thesystem should be designed and how it would affect the system size to have night loads(security lights) use DC and could the system then be extended in blocks. As a result it wasfound out that the system size could be decreased as the inverter losses would be avoided.Also the system extension in blocks was found to be possible. The second study was aboutinverter stacking where multiple inverters can work as one unit. This type of connectionallows only the required number of inverters to run while shutting down the excess ones.This would allow the converter-unit to run with higher efficiency and lower powerconsumption could be achieved. In future with higher loads the system could be easilyextendable by connecting more inverters either in parallel or series depending on what isneeded. Multiple inverters would also offer higher reliability than using one centralizedinverter. The third study examined how the choice of location for a centralized powergeneration affects the cable sizing for the system. As a result it was found that centralizedpower generation should be located close to high loads in order to avoid long runs of thickcables. Future loads should also be considered when choosing the location. For theeducational center the potential locations for centralized power generation were found outto be close to the school buildings and close to the dormitories.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Within Australia, very little attention has been given to the potential biodiversity benefits of power line easements, if ecologically sensitive management regimes are developed. This study examined the potential power line easements may have for the conservation of small mammals, and in particular the near threatened, Broad-toothed Rat Mastacomys fuscus, in Australia. Easement vegetation was found to support a diverse small mammal community, including M. fuscus if the vegetation was allowed to develop some structural complexity. M. fuscus was one of the first species to recolonize the easement habitat, provided that the areas had regenerated to a sufficient level. Results suggests; however, that the current management technique used, where the entire easement is managed at one time via mass slashing, on short rotation times, is most likely limiting M. fuscus to low abundances, and causing isolation of the current M. fuscus populations. To ensure that power line easements supply functional, usable habitat for small mammals and other species and to minimize their potential to fragment small mammal populations, it is recommended that current management techniques be reassessed. In an effort to develop more appropriate management regimes, it was recommended that rotation times be increased between management, that mass slashing of the easement at one time be reassessed, especially in naturally low growing areas and that rotational type slashing be implemented. Other techniques such as spot spraying, may be all that is needed within some areas to control emergent saplings. This study highlights that potential biodiversity values do exist for Australian power line easements, if some changes occur to the current management practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An operational transconductance amplifier (OTA) using dynamic threshold MOS (DTMOS) and hybrid compensation technique is presented in this paper. The proposed topology is based on a bulk and gate driven input differential pair. Two separate capacitors are employed for the OTA compensation where one of them is used in a signal path and the other one in a non-signal path. The circuit is designed in the 0.18μm CMOS TSMC technology. The proposed design technique shows remarkable enhancement in unity gain-bandwidth and also in DC gain compared to the bulk driven input differential pair OTAs. The Hspice simulation results show that the amplifier has a 92dB open-loop DC gain and a unity gain-bandwidth of 135kHz while operating at 0.4V supply voltage. The total power consumption is as low as 386nW which makes it suitable for low-power bio-medical and bio-implantable applications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A highly linear, low voltage, low power, low noise amplifier (LNA) using a novel nonlinearity cancellation technique is presented in this paper. Parallel Inductor (PI) matching is used to increase LNA gain by 3dB at the desired frequency. The linear LNA was designed and simulated in a TSMC 0.18μm CMOS process at 5GHz frequency. By employing the proposed technique, the IIP3 is improved by 12dB in contrast to the conventional folded cascode LNA, reaching −1dBm without having any significant effect on the other LNA parameters such as gain, NF and also power consumption. The proposed LNA also delivers a voltage gain (S21) of 12.25dB with a noise figure of 3.5dB, while consuming only 1.28mW of DC power with a low supply voltage of 0.6V.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper details a system dynamics model developed to simulate proposed changes to water governance through the integration of supply, demand and asset management processes. To effectively accomplish this, interconnected feedback loops in tariff structures, demand levels and financing capacity are included in the model design, representing the first comprehensive life-cycle modelling of potable water systems. A number of scenarios were applied to Australia's populated South-east Queensland region, demonstrating that introducing temporary drought pricing (i.e. progressive water prices set inverse with availability), in conjunction with supply augmentation through rain-independent sources, is capable of efficiently providing water security in the future. Modelling demonstrated that this alternative tariff structure reduced demand in scarcity periods thereby preserving supply, whilst revenues are maintained to build new water supply infrastructure. In addition to exploring alternative tariffs, the potential benefits of using adaptive pressure-retarded osmosis desalination plants for both potable water and power generation was explored. This operation of these plants for power production, when they would otherwise be idle, shows promise in reducing their net energy and carbon footprints. Stakeholders in industry, government and academia were engaged in model development and validation. The constructed model displays how water resource systems can be reorganised to cope with systemic change and uncertainty.