908 resultados para Security-critical software
Resumo:
The recent trends of chip architectures with higher number of heterogeneous cores, and non-uniform memory/non-coherent caches, brings renewed attention to the use of Software Transactional Memory (STM) as a fundamental building block for developing parallel applications. Nevertheless, although STM promises to ease concurrent and parallel software development, it relies on the possibility of aborting conflicting transactions to maintain data consistency, which impacts on the responsiveness and timing guarantees required by embedded real-time systems. In these systems, contention delays must be (efficiently) limited so that the response times of tasks executing transactions are upper-bounded and task sets can be feasibly scheduled. In this paper we assess the use of STM in the development of embedded real-time software, defending that the amount of contention can be reduced if read-only transactions access recent consistent data snapshots, progressing in a wait-free manner. We show how the required number of versions of a shared object can be calculated for a set of tasks. We also outline an algorithm to manage conflicts between update transactions that prevents starvation.
Resumo:
The foreseen evolution of chip architectures to higher number of, heterogeneous, cores, with non-uniform memory and non-coherent caches, brings renewed attention to the use of Software Transactional Memory (STM) as an alternative to lock-based synchronisation. However, STM relies on the possibility of aborting conflicting transactions to maintain data consistency, which impacts on the responsiveness and timing guarantees required by real-time systems. In these systems, contention delays must be (efficiently) limited so that the response times of tasks executing transactions are upperbounded and task sets can be feasibly scheduled. In this paper we defend the role of the transaction contention manager to reduce the number of transaction retries and to help the real-time scheduler assuring schedulability. For such purpose, the contention management policy should be aware of on-line scheduling information.
Resumo:
The aim of the TeleRisk Project on labour relations and professional risks within the context of teleworking in Portugal – supported by IDICT – Institute for Development and Inspection of Working Conditions (Ministry of Labour), is to study the practices and forms of teleworking in the manufacturing sectors in Portugal. The project chose also the software industry as a reference sector, even though it does not intend to exclude from the study any other sector of activity or the so-called “hybrid” forms of work. However, the latter must have some of the characteristics of telework. The project thus takes into account the so-called “traditional” sectors of activity, namely textile and machinery and metal engineering (machinery and equipment), not usually associated to this type of work. However, telework could include, in the so-called “traditional” sectors, other variations that are not found in technologically based sectors. One of the evaluation methods for the dynamics associated to telework consisted in carrying out surveys by means of questionnaires, aimed at employers in the sectors analysed. This paper presents some of the results of those surveys. It is important to mention that, being a preliminary analysis, it means that it does not pretend to have exhausted all the issues in the survey, but has meant that it shows the bigger tendencies, in terms of teleworking practices, of the Portuguese industry.
Resumo:
Flexible forms of work like project work are gaining importance in industry and services. Looking at the research on project work, the vast majority of present literature is on project management, but increasingly, problems concerning the quality of work and the efficiency of project teams become visible. The question now is how project work can be structured in order to simultaneously provide efficient and flexible work and healthy working conditions ensuring the development of human resources for a long time. Selected results of publicly funded research into project work will be presented based on case studies in 7 software development /IT consulting project teams (N=34). A set of different methods was applied: interviews with management/project managers, group interviews on work constraints, a monthly diary about well-being and critical incidences in the course of the project, and a final evaluation questionnaire on project outcomes focusing on economic and health aspects. Findings reveal that different types of projects exist with varying degree of team members’ autonomy and influence on work structuring. An effect of self-regulation on mental strain could not be found. The results emphasize, that contradicting requirements and insufficient organizational resources with respect to the work requirements lead to an increased work intensity or work obstruction. These contradicting requirements are identified as main drivers for generating stress. Finally, employees with high values on stress for more than 2 months have significantly higher exhaustion rates than those with only one month peaks. Structuring project work and taking into account the dynamics of project work, there is a need for an active role of the project team in contract negotiation or the detailed definition of work – this is not only a question of individual autonomy but of negotiation the range of option for work structuring. Therefore, along with the sequential definition of the (software) product, the working conditions need to be re-defined.
Resumo:
Consider a multihop network comprising Ethernet switches. The traffic is described with flows and each flow is characterized by its source node, its destination node, its route and parameters in the generalized multiframe model. Output queues on Ethernet switches are scheduled by static-priority scheduling and tasks executing on the processor in an Ethernet switch are scheduled by stride scheduling. We present schedulability analysis for this setting.
Resumo:
Gravity loads can affect a reinforced concrete structure's response to seismic actions, however, traditional procedures for testing the beam behaviour do not take this effect into consideration. An experimental campaign was carried out in order to assess the influence of the gravity load on RC beam connection to the column subjected to cyclic loading. The experiments included the imposition of a conventional quasi-static test protocol based on the imposition of a reverse cyclic displacement history and of an alternative cyclic test procedure starting from the gravity load effects. The test results are presented, compared and analysed in this paper. The imposition of a cyclic test procedure that included the gravity loads effects on the RC beam ends reproduces the demands on the beams' critical zones more realistically than the traditional procedure. The consideration of the vertical load effects in the test procedure led to an accumulation of negative (hogging) deformation. This phenomenon is sustained with the behaviour of a portal frame system under cyclic loads subject to a significant level of the vertical load, leading to the formation of unidirectional plastic hinges. In addition, the hysteretic behaviour of the RC beam ends tested was simulated numerically using the nonlinear structural analysis software - OpenSees. The beam-column model simulates the global element behaviour very well, as there is a reasonable approximation to the hysteretic loops obtained experimentally. (C) 2013 Elsevier Ltd. All rights reserved.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para a obtenção do grau de Mestre em Engenharia Informática.
Improving the IEEE 802.15.4 Slotted CSMA/CA MAC for time-critical events in wireless sensor networks
Resumo:
In beacon-enabled mode, IEEE 802.15.4 is ruled by the slotted CSMA/CA Medium Access Control (MAC) protocol. The standard slotted CSMA/CA mechanism does not provide any means of differentiated services to improve the quality of service for timecritical events (such as alarms, time slot reservation, PAN management messages etc.). In this paper, we present and discuss practical service differentiation mechanisms to improve the performance of slotted CSMA/CA for time-critical events, with only minor add-ons to the protocol. The contribution of our proposal is more practical than theoretical since our initial requirement is to leave the original algorithm of the slotted CSMA/CA unchanged, but rather tuning its parameters adequately according to the criticality of the messages. We present a simulation study based on an accurate model of the IEEE 802.15.4 MAC protocol, to evaluate the differentiated service strategies. Four scenarios with different settings of the slotted CSMA/CA parameters are defined. Each scenario is evaluated for FIFO and Priority Queuing. The impact of the hiddennode problem is also analyzed, and a solution to mitigate it is proposed.
Resumo:
(l) The Pacific basin (Pacific area) may be regarded as moving eastwards like a double zip fastener relative to the continents and their respective plates (Pangaea area): opening in the East and closing in the West. This movement is tracked by a continuous mountain belt, the collision ages of which increase westwards. (2) The relative movements between the Pacific area and the Pangaea area in the W-EfE-W direction are generated by tidal forces (principle of hypocycloid gearing), whereby the lower mantle and the Pacific basin or area (Pacific crust = roof of the lower mantle?) rotate somewhat faster eastwards around the Earth's spin axis relative to the upper mantle/crust system with the continents and their respective plates (Pangaea area) (differential rotation). (3) These relative West to East/East to West displacements produce a perpetually existing sequence of distinct styles of opening and closing oeean basins, exemplified by the present East to West arrangement of ocean basins around the globe (Oceanic or Wilson Cycle: Rift/Red Sea style; Atlantic style; Mediterranean/Caribbean style as eastwards propagating tongue of the Pacific basin; Pacific style; Collision/Himalayas style). This sequence of ocean styles, of which the Pacific ocean is a part, moves eastwards with the lower mantle relative to the continents and the upper-mantle/crust of the Pangaea area. (4) Similarly, the collisional mountain belt extending westwards from the equator to the West of the Pacific and representing a chronological sequence of collision zones (sequential collisions) in the wake of the passing of the Pacific basin double zip fastener, may also be described as recording the history of oceans and their continental margins in the form of successive Wilson Cycles. (5) Every 200 to 250 m.y. the Pacific basin double zip fastener, the sequence of ocean styles of the Wilson Cycle and the eastwards growing collisional mountain belt in their wake complete one lap around the Earth. Two East drift lappings of 400 to 500 m.y. produce a two-lap collisional mountain belt spiral around a supercontinent in one hemisphere (North or South Pangaea). The Earth's history is subdivided into alternating North Pangaea growth/South Pangaea breakup eras and South Pangaea growth/North Pangaea breakup eras. Older North and South Pangaeas and their collisional mountain belt spirals may be reconstructed by rotating back the continents and orogenic fragments of a broken spiral (e.g. South Pangaea, Gondwana) to their previous Pangaea growth era orientations. In the resulting collisional mountain belt spiral, pieced together from orogenic segments and fragments, the collision ages have to increase successively towards the West. (6) With its current western margin orientated in a West-East direction North America must have collided during the Late Cretaceous Laramide orogeny with the northern margin of South America (Caribbean Andes) at the equator to the West of the Late Mesozoic Pacific. During post-Laramide times it must have rotated clockwise into its present orientation. The eastern margin of North America has never been attached to the western margin of North Africa but only to the western margin of Europe. (7) Due to migration eastwards of the sequence of ocean styles of the Wilson Cycle, relative to a distinct plate tectonic setting of an ocean, a continent or continental margin, a future or later evolutionary style at the Earth's surface is always depicted in a setting simultaneously developed further to the West and a past or earlier style in a setting simultaneously occurring further to the East. In consequence, ahigh probability exists that up to the Early Tertiary, Greenland (the ArabiaofSouth America?) occupied a plate tectonic setting which is comparable to the current setting of Arabia (the Greenland of Africa?). The Late Cretaceous/Early Tertiary Eureka collision zone (Eureka orogeny) at the northern margin of the Greenland Plate and on some of the Canadian Arctic Islands is comparable with the Middle to Late Tertiary Taurus-Bitlis-Zagros collision zone at the northern margin of the Arabian Plate.
Resumo:
Dissertação apresentada para a obtenção do Grau de Doutor em Informática pela Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica
Resumo:
Adhesive bonding as a joining or repair method has a wide application in many industries. Repairs with bonded patches are often carried out to re-establish the stiffness at critical regions or spots of corrosion and/or fatigue cracks. Single and double-strap repairs (SS and DS, respectively) are a viable option for repairing. For the SS repairs, a patch is adhesively-bonded on one of the structure faces. SS repairs are easy to execute, but the load eccentricity leads to peel peak stresses at the overlap edges. DS repairs involve the use of two patches, one on each face of the structure. These are more efficient than SS repairs, due to the doubling of the bonding area and suppression of the transverse deflection of the adherends. Shear stresses also become more uniform as a result of smaller differential straining. The experimental and Finite Element (FE) study presented here for strength prediction and design optimization of bonded repairs includes SS and DS solutions with different values of overlap length (LO). The examined values of LO include 10, 20 and 30 mm. The failure strengths of the SS and DS repairs were compared with FE results by using the Abaqus® FE software. A Cohesive Zone Model (CZM) with a triangular shape in pure tensile and shear modes, including the mixed-mode possibility for crack growth, was used to simulate fracture of the adhesive layer. A good agreement was found between the experiments and the FE simulations on the failure modes, elastic stiffness and strength of the repairs, showing the effectiveness and applicability of the proposed FE technique in predicting strength of bonded repairs. Furthermore, some optimization principles were proposed to repair structures with adhesively-bonded patches that will allow repair designers to effectively design bonded repairs.
Resumo:
This paper presents a layered Smart Grid architecture enhancing security and reliability, having the ability to act in order to maintain and correct infrastructure components without affecting the client service. The architecture presented is based in the core of well design software engineering, standing upon standards developed over the years. The layered Smart Grid offers a base tool to ease new standards and energy policies implementation. The ZigBee technology implementation test methodology for the Smart Grid is presented, and provides field tests using ZigBee technology to control the new Smart Grid architecture approach. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia do Ambiente, Perfil de Engenharia Sanitária
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Informática