924 resultados para Keywords: highway maintenance
Resumo:
Although physical activity is recommended in patients on maintenance hemodialysis (MHD), randomized controlled trials testing the effects of exercise in this population have given conflicting results. In general, aerobic exercises mostly failed to produce improvements in physical function, whereas resistance exercises, although less studied, appeared to be more promising. The use of sophisticated materials such as leg press and free weights may preclude widespread application of resistance training in patients on MHD. Simple and cheap elastic bands may thus be an attractive alternative. We tested the feasibility of a supervised intradialytic resistance band exercise training program, and its effects on physical function, in patients on MHD. A total of 11 unselected adult patients on MHD from our center, aged 70 ± 10.7 (mean ± standard deviation) years, including 8 men and 3 women, accepted to follow the program under the supervision of qualified physiotherapists. Thirty-six exercise sessions of moderate intensity (twice a week, mean duration 40 minutes each, during 4.5 to 6 months), mainly involving leg muscles against an elastic resistance, were performed. The exercise program was well tolerated and all patients completed it. Statistically significant improvements were observed in the following tests: Tinetti test, 23.9 ± 3.9 points before versus 25.7 ± 3.5 points after the program (P = .022); the Timed Up and Go test, 12.1 ± 6.6 versus 10 ± 5.8 seconds (P = .0156). Improvements in the 6-minute walk distance and in the one-leg balance tests just failed to reach statistical significance. In this single-center pilot study, an intradialytic resistance band exercise program was feasible, well tolerated, and showed encouraging results on physical function.
Resumo:
This final report summarizes the activities of the archaeological surveys contract for primary roads, secondary roads, and urban systems. The contract is negotiated annually between the Iowa Department of Transportation and the University of Iowa. The information contained is composed of summaries abstracted from completed cultural resource reports on file with the Department of Transportation, the Office of Historic Preservation, and the Office of the State Archaeologist.
Resumo:
This final report summarizes the activities of the archaeological surveys contract for primary roads, secondary roads, and urban systems. The contract is negotiated annually between the Iowa Department of Transportation and the University of Iowa. The information contained in this section of the report is composed of summaries abstracted from completed cultural resource reports on file with the Department of Transportation, the Office of Historic Preservation, and the Office of the State Archaeologist.
Resumo:
The Engineering Research Institute at Iowa State University studied the organization and procedures for highway planning by all levels of government and the coordination among various state agencies and local governments in Iowa. Study information was derived from interviews, questionnaires, and a review of the literature. Representatives from state transportation or highway organizations in all states responded to questionnaires. Additionally, selected upper and intermediate level personnel from highway organizations in seven other states were interviewed and a visit was made to one state transportation department. Within Iowa, employees were interviewed in the Highway Commission, Office for Planning and Programming, Development Commission, Commerce Commission, Conservation Commission, and Highway Patrol. Nearly 600 officials of local governments in Iowa contributed factual data and opinions through questionnaires and interviews. Private citizens and consultants also provided input to the investigation through their responses to questionnaires. Twelve recommendations to improve highway planning in Iowa were formulated as a result of this study.
Resumo:
It is the objective of this project to determine, via field tests, the long term effectiveness of several available systems as their ability to protect concrete surfaces against the intrusion of chloride ions. Early concepts of this project included utilizing personnel from several offices within the Highway Division of the Iowa Department of Transportation. Cooperation and coordination with regularly scheduled activities were considered imperative. A meeting for this purpose was held on April 16, 1980. This meeting was attended by the investigators, Mr. Bernard C. Brown, Office of Materials, Mr. Richard Merritt, District 6 Materials Engineer, Mr. John Saunders, District 6 Maintenance Engineer, and Mr. James Phinney, Resident Maintenance Engineer.
Resumo:
Joint Publications from Iowa Engineering Experiment Station - Bulletin No. 190 and Iowa Highway Research Board - Bulletin No. 19. This bulletin is a report on the development of bituminous paving mixtures containing various local materials and asphaltic binders. The laboratory investigations described in this bulletin were performed as part of Iowa Highway Research Board project HR-20, "Treating Loess, Fine Sands, and Limestone Dusts With Liquid Binders." This project was awarded to the Iowa Engineering Experiment Station of Iowa State University in 1952, and continued to June, 1958.
Resumo:
Joint Publications from Iowa Engineering Experiment Station - Bulletin No. 188 and Iowa Highway Research Board - Bulletin No. 17. In the design of highway bridges, the 'static live load is multiplied by a factor to compensate for the dynamic effect of moving vehicles. This factor, commonly referred to as an impact factor, is intended to provide for the dynamic response of the bridge to moving loads and suddenly applied forces. Many investigators have published research which contradicts the current impact formula 1,4,17. Some investigators feel that the problem of impact deals not only with the increase in over-all static live load but that it is an integral part of a dynamic load distribution problem. The current expanded highway program with the large number of bridge structures required emphasizes the need for investigating some of the dynamic behavior problems which have been generally ignored by highway engineers. These problems generally result from the inability of a designer to predict the dynamic response of a bridge structure. Many different investigations have been made of particular portions of the overall dynamic problem. The results of these varied investigations are inevitably followed by a number of unanswered questions. Ironically, many of the unanswered questions are those which are of immediate concern in the design of highway bridges, and this emphasizes the need for additional research on the problem of impact.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pinconnected high-truss single-lane bridge, was selected for a testing program which included ultimate load tests. The purpose of the ultimate load tests, which are summarized in this report, was to relate design and rating procedures presently used in bridge design to the field behavior of this type of truss bridge. The ultimate load tests consisted of ultimate load testing of one span of the bridge, of two I-shaped floorbeams, and of two panels of the timber deck. The theoretical capacity of each of these components is compared with the results from the field tests.
Resumo:
This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.
Resumo:
This report is the final product of a two-year study that began October 1, 2013. In addition to the funding provided for this study by the Iowa Highway Research Board and the Iowa Department of Transportation (TR-669), the project was also funded by the U.S. Army Corps of Engineers and the U.S. Geological Survey. The report was published as an online report on January 4, 2016. The report is available online at http://dx.doi.org/10.3133/ofr20151214 . The main body of the report provides a description of the statistics presented for the streamgages and an explanation of the streamgage summaries, also included is a discussion of the USGS streamgage network in Iowa. Individual streamgage summaries are available as links listed in table 1, or all 184 streamgage summaries are available in a zipped file named “Streamgage Summaries.”
Resumo:
Currently there are no guidelines within the Manual on Uniform Traffic Control Devices (MUTCD) on construction phasing and maintenance of traffic (MOT) for retrofit construction and maintenance projects involving innovative geometric designs. The research presented in this report addressed this gap in existing knowledge by investigating the state of the practice of construction phasing and MOT for several types of innovative geometric designs including the roundabout, single point urban interchange (SPUI), diverging diamond interchange (DDI), restricted-crossing left turn (RCUT), median U-turn (MUT), and displaced left turn (DLT). This report provides guidelines for transportation practitioners in developing construction phasing and MOT plans for innovative geometric designs. This report includes MOT Phasing Diagrams to assist in the development of MOT strategies for innovative designs. The MOT Phasing Diagrams were developed through a review of literature, survey, interviews with practitioners, and review of plans from innovative geometric design projects. These diagrams are provided as a tool to assist in improving work zone safety and mobility through construction of projects with innovative geometric designs. The aforementioned synthesis of existing knowledge documented existing practices for these types of designs.
Resumo:
In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment concentration in streams may be conducted a number of ways. As part of a project funded by the Iowa Department of Transportation, several testing methods were explored to determine the most affordable, appropriate methods for data collection both in the field and in the lab. The primary purpose of the research was to determine the exchangeability of the acrylic transparency tube for water clarity analysis as compared to the turbidimeter.
Resumo:
This booklet is a compilation of notes taken during motor grader operators workshops held at some 20 different locations throughout Iowa during the last two years. It is also the advice of 16 experienced motor grader operators and maintenance foremen (from 14 different counties around Iowa), who serve as instructors and assistant instructors at the "MoGo" workshops. The instructors have all said that they learn as much from the operators who attend the workshops as they impart. Motor grader operators from throughout Iowa have shown us new, innovative and better ways of maintaining gravel roads. This booklet is an attempt to pass on some of these "tips" that we have gathered from Iowa operators. It will need to be revised, corrected, and added to based on the advice we get from you, the operators who do the work here in Iowa.
Resumo:
The major objective of this project is to evaluate image analysis for characterizing air voids in Portland cement contract (PCC) and asphalt concrete (AC) and aggregate gradation in asphalt concrete. Phase 1 of this project has concentrated on evaluation and refinement of sample preparation techniques, evaluation of methods and instruments for conducting image analysis, and finally, analysis and comparison of a select portion of samples. Preliminary results suggest a strong correlation between the results obtained from the linear traverse method and image analysis methods for determining percent air voids in concrete. Preliminary work with asphalt samples has shown that damage caused by a high vacuum of the conventional scanning electron microscope (SEM) may too disruptive. Alternative solutions have been explored, including confocal microscopy and low vacuum electron microscopy. Additionally, a conventional high vacuum SEM operating at a marginal operating vacuum may suffice.
Resumo:
Provision of left turn lanes is a major problem which lacks an objective approach. Various techniques and procedures in use have been reviewed. Traffic characteristics at typical Iowa intersections have been measured. A rational approach for inclusion of a left turn lane has been developed, based on relating the benefits to the road user to the cost of providing the added turing lane. An analysis of field data gathered under this project indicates that the use of theoretical distribution to describe vehicle headways is not applicable to rural Iowa two lane roads. As an alternate approach the mass of field data gathered were examined using multiple regression techniques to yield equations for predicting stops and delays. The benefit-cost ratio technique is recommended as the criterion for decision making.