1000 resultados para Kenilworth-Parkside Project.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In smaller countries where the key players in construction IT development tend to know each other personally and where public R&D funding is concentrated to a few channels, IT roadmaps and strategies would seem to have a better chance of influencing development than in the bigger industrial countries. In this paper Finland and the RATAS-project is presented as a historical case illustrating such impact. RATAS was initiated as a construction IT roadmap project in 1985, involving many of the key organisations and companies active in construction sector development. Several of the individuals who took an active part in the project have played an important role in later developments both in Finland and on the international scene. The central result of RATAS was the identification of what is nowadays called Building Information Modelling (BIM) technology as the central issue in getting IT into efficient use in the construction sector. BIM, which earlier was referred to as building product modelling, has been a key ingredient in many roadmaps since and the subject of international standardisation efforts such as STEP and IAI/IFCs. The RATAS project can in hindsight be seen as a forerunner with an impact which also transcended national borders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article reports on a cross-sectional case study of a large construction project in which Electronic document management (EDM) was used. Attitudes towards EDM from the perspective of individual end users were investigated. Responses from a survey were combined with data from system usage log files to obtain an overview of attitudes prevalent in different user segments of the total population of 334 users. The survey was followed by semi-structured interviews with representative users. A strong majority of users from all segments of the project group considered EDM as a valuable aid in their work processes, despite certain functional limitations of the system used and the complexity of the information mass. Based on the study a model describing the key factors affecting end user EDM adoption is proposed. The model draws on insight from earlier studies of EDM enabled projects and theoretical frameworks on technology acceptance and success of information systems, as well as the insights gained from the case study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite the central role of legitimacy in corporate social responsibility debate, little is known of subtle meaning-making processes through which social actors attempt to establish or de-establish legitimacy for socially contested corporate undertakings, and through which they, at the same time, struggle to define the proper social role and responsibility of corporations. We investigated these processes in the context of the intense socio-political conflict around the Finnish forest industry company Metsa¨-Botnia’s world-scale pulp mill in Uruguay. A critical discursive analysis of Finnish media texts highlights three types of struggle that characterized the media coverage: legalistic argumentation, truth fights, and political battles. Interestingly, this case illustrates how the corporate representatives — with the help of the national media — tend to frame the issue in legalistic terms, emphasize their expert knowledge in technical and environmental evaluations, and distance themselves from political disputes. We argue that similar tendencies are likely to characterize corporate social responsibility debates more generally.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The driving force behind this study is the gap between the reality of the firms engaged in project business and the available studies covering project management and business process development. Previous studies show that project-based organizations were ‘immature’ in terms of the project-management ‘maturity model’, as few firms were found to be optimizing processes. Even within those, very little attention was paid to combine inter-organizational and intra-organizational perspectives. In this study an effort is made to elaborate some thoughts and views on project management, which interrelate firms’ external and internal activities. In line with the integration, the dissertation uses an approach to the management of project-business interdependencies in the networks of actors, activities and resources. Firstly, the study develops an understanding for inter-organizational perspectives by exploring the complementarities of process activities in the basic development of project business. It presents a framework that is elaborated on the basis of the reciprocal interactions of activities within and outside the organization—thus providing a coherent basis for continuous business-process improvement. In addition, the study presents new tools that can be used to develop project-business processes in each of its functional areas. The research demonstrates how project-business activities can be optimized using the right resources at the right time with the right actors and the right actions. The selected five articles included in this dissertation explain the basic framework for the development of project business. Each paper covers various aspects of inter-organizational and intra-organizational perspectives for project management. The study develops a valuable and procedural model for business-process improvement using the Delphi method that can be used not only in academia but also as a guide for practitioners that takes them through a series of well-defined steps when making informed, consistent and efficient changes to their business processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite thirty years of research in interorganizational networks and project business within the industrial networks approach and relationship marketing, collective capability of networks of business and other interorganizational actors has not been explicitly conceptualized and studied within the above-named approaches. This is despite the fact that the two approaches maintain that networking is one of the core strategies for the long-term survival of market actors. Recently, many scholars within the above-named approaches have emphasized that the survival of market actors is based on the strength of their networks and that inter-firm competition is being replaced by inter-network competition. Furthermore, project business is characterized by the building of goal-oriented, temporary networks whose aims, structures, and procedures are clarified and that are governed by processes of interaction as well as recurrent contracts. This study develops frameworks for studying and analysing collective network capability, i.e. collective capability created for the network of firms. The concept is first justified and positioned within the industrial networks, project business, and relationship marketing schools. An eclectic source of conceptual input is based on four major approaches to interorganizational business relationships. The study uses qualitative research and analysis, and the case report analyses the empirical phenomenon using a large number of qualitative techniques: tables, diagrams, network models, matrices etc. The study shows the high level of uniqueness and complexity of international project business. While perceived psychic distance between the parties may be small due to previous project experiences and the benefit of existing relationships, a varied number of critical events develop due to the economic and local context of the recipient country as well as the coordination demands of the large number of involved actors. The study shows that the successful creation of collective network capability led to the success of the network for the studied project. The processes and structures for creating collective network capability are encapsulated in a model of governance factors for interorganizational networks. The theoretical and management implications are summarized in seven propositions. The core implication is that project business success in unique and complex environments is achieved by accessing the capabilities of a network of actors, and project management in such environments should be built on both contractual and cooperative procedures with local recipient country parties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Submergence of land is a major impact of large hydropower projects. Such projects are often also dogged by siltation, delays in construction and heavy debt burdens-factors that are not considered in the project planning exercise. A simple constrained optimization model for the benefit~ost analysis of large hydropower projects that considers these features is proposed. The model is then applied to two sites in India. Using the potential productivity of an energy plantation on the submergible land is suggested as a reasonable approach to estimating the opportunity cost of submergence. Optimum project dimensions are calculated for various scenarios. Results indicate that the inclusion of submergence cost may lead to a substanual reduction in net present value and hence in project viability. Parameters such as project lifespan, con$truction time, discount rate and external debt burden are also of significance. The designs proposed by the planners are found to be uneconomic, whIle even the optimal design may not be viable for more typical scenarios. The concept of energy opportunity cost is useful for preliminary screening; some projects may require more detailed calculations. The optimization approach helps identify significant trade-offs between energy generation and land availability.

Relevância:

20.00% 20.00%

Publicador: