896 resultados para Infrastructure and Construction Projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Indian Journal of Gender Studies October 2012 vol. 19 no. 3 437-467

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Electrical activity is extremely broad and distinct, requiring by one hand, a deep knowledge on rules, regulations, materials, equipments, technical solutions and technologies and assistance in several areas, as electrical equipment, telecommunications, security and efficiency and rational use of energy, on the other hand, also requires other skills, depending on the specific projects to be implemented, being this knowledge a characteristic that belongs to the professionals with relevant experience, in terms of complexity and specific projects that were made.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O estágio desenvolvido na empresa de construção Manuel da Graça Peixito, incidiu sobre Direcção e Gestão de Obra na execução de um projecto de reconversão urbanística a aplicar na AUGI 42 localizada no Casal do Sapo em Sesimbra. As áreas urbanas de génese ilegal, denominadas de AUGI, surgiram no inicio da década de 60, como um fenómeno que surgiu de forma a colmatar a carência no parque habitacional das periferias das grandes áreas metropolitanas do território nacional. O ambiente urbano gerado pela existência das AUGI, muitas vezes de proporções de grande dimensão, evidencia inúmeras carências e problemas a níveis sociais, económicos, urbanísticos e legais. A gestão de obra é uma actividade essencial na execução da obra e no planeamento de todas as tarefas a realizar com o melhor tratamento económico e financeiro. A direcção de obra tem como principais funções a selecção de recursos humanos, escolha e montagem dos órgãos de apoio logístico, a aquisição atempada e negociação de materiais. O Gestor e Director de Obra é colocado num ciclo operacional de optimização de recursos e eficiências, em que as duas funções, gestão e direcção de obra, são complementares e a abordagem do contexto interactivo do controlo da obra, em termos da produção, da gestão económica e financeira, da gestão do tempo, do cumprimento das normas de saúde e segurança no trabalho e no assegurar da qualidade, são claramente identificadas, enquanto veículo indispensável do cumprimento do contrato de empreitada. O processo de reconversão urbanística aplicado na AUGI 42 teve como estrutura de proposta a seguinte base: primeiro na recolha de dados relativo à AUGI 42 e na definição de um planeamento do faseamento numa estratégia de execução da empreitada; segundo na constituição e caracterização da execução de variadas infra-estruturas (rede de drenagem de esgotos domésticos e pluviais, rede de abastecimento de águas, rede de telecomunicações, rede eléctrica, rede de gás, rede viária e arranjos de espaços exteriores). Este processo e consequente proposta surgem como um contributo fundamental na melhoria da qualidade de vida das populações, como também da funcionalidade do sistema urbano que compõe as AUGI.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the present paper we will consider strategies of innovation, risk and proactivity as entre/ intrapreneurship strategies. This study was done in a Portuguese and in a Polish region. In Portugal the region was Vale do Sousa, located in the northern Portugal. The Polish region was Lublin Voivodeship and it is situated in the south-eastern part of the country. The study focused on Industrial and Construction sectors. In order to get a valid sample, a group of 251 firms were analysed in Portugal, and 215 in Poland. However, the minimum sample size in Poland should be 323. Since this is a work in progress, we are aiming for this number of questionnaires. Each strategy was analysed individually for both regions and the results pointed to a lack of culture of entrepreneurship in firms’ management. Only Proactivity presented a positive result in firms’ management. Polish firms tend to be more innovative and more risk takers, while in proactivity Portuguese ones present a slightly higher result. Combining the strategy results, it was possible to identify that 61.2% of Portuguese firms present a low level of entrepreneurship, while 60% of Polish firms present a moderate level. Considering intrapreneurship good levels, while Portugal account for 5.2% this figure is 19.1% in Poland.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A expansão da área ocupada pelo Porto de Leixões (Matosinhos e Leça da Palmeira), sobre solos muito compressíveis, de origem fluvial e marinha, leva a que seja necessário recorrer à engenharia para encontrar soluções adequadas à utilização de obras dos fins em vista. Assim, na zona do porto são muitos os projectos de engenharia civil/geotécnica executados nestes solos. Como exemplo, podem citar-se a Consolidação do Terrapleno e Construção dos Caminhos de Rolamento do Terminal de Contentores TC4S, a Reabilitação de um troço com 110m, do Cais Sul e do Cais Nascente da Doca nº 4 e a Construção da Portaria Principal do Porto de Leixões, todos no vale fóssil do rio Leça. São vastos os métodos a usar para o melhoramento destes solos, a colocação de colunas de brita, com o objectivo de reforçar o solo, aumentando a sua capacidade de carga e funcionando como drenos verticais, para solucionar o problema das deformações excessivas durante e após o final da obra, uma alternativa consiste em induzir a aceleração da consolidação da camada de solo mole, o uso de pré-carregamento e drenos verticais são usuais. Quando o tempo de concretização da obra exige que o aterro seja utilizado de imediato, uma solução viável é a colocação de estacas, que transferem o peso do aterro, ou parte dele, para camadas mais competentes. Também se pode proceder à retirada do solo original e substituí-lo por outro de qualidade superior. A mais recente técnica de melhoria de solos por injecção - jet grouting - é utilizada em diversas situações, incluindo obras provisórias e definitivas. O presente trabalho visa descrever, em função dos diversos factores, o comportamento do solo face aos vários métodos utilizados e os objectivos pretendidos que serão abordados no enquadramento empírico do trabalho.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As obras subterrâneas têm actualmente maior relevância, sobretudo em meios urbanos e são, desde a fase de estudo até à sua execução, projectos tecnicamente complexos, exigentes e interessantes. O meio em que a obra subterrânea está inserida condiciona, quer na fase de estudo quer no desenvolvimento dos trabalhos, as opções técnicas e representa um desafio constante para todos os intervenientes. São poucos os técnicos que têm a oportunidade de acompanhar e apreender o conhecimento envolvido nestas obras, pelo que é importante que toda a experiência adquirida seja registada e se possível transmitida. Pela sua formação e vocação, os engenheiros geotécnicos desempenham um papel de destaque nestes empreendimentos, onde o conhecimento e a sensibilidade técnica, associados à experiência em trabalhos semelhantes, são factores determinantes para atingir os objectivos propostos. Com este trabalho pretende-se caracterizar, valorizar, analisar e concluir sobre as várias etapas desenvolvidas na construção do túnel de Seixo Alvo, enquadrado na Concessão do Douro Litoral. Realizou-se uma apreciação do estado da arte e apresenta-se o túnel do Seixo Alvo como caso de estudo, onde se evidencia a importância do estudo e observação da obra e do meio em que está inserida, caracteriza os métodos e processos construtivos implementados e propostos, analisa os incidentes ocorridos e valoriza os trabalhos executados. Por último conclui-se sobre as técnicas, os custos e os rendimentos obtidos.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O presente relatório é a última etapa para a obtenção do Grau de Mestre em Tecnologia e Gestão das Construções leccionado no Instituto Superior de Engenharia do Porto, (ISEP). O estágio decorreu em ambiente maioritariamente de obra na empresa Monte Adriano, Engenharia e Construção, SA, e o objectivo consistiu em dar apoio e acompanhar a Obra de Ampliação do Reservatório de Custóias, inserida na Empreita de concepção, projecto e construção das infraestruturas necessárias à execução do plano de investimentos da Indáqua Matosinhos, actividades estas, decorrentes da função de adjunta de direcção de obra. Para além da breve descrição da empresa que a estagiária integrou e da empreitada geral, foi feita uma enumeração das várias actividades desempenhadas na Obra e dos vários condicionalismos encontrados que por vezes levaram a alterações do projecto. Dá-se especial ênfase à parte da execução das fundações, quer pela heterogeneidade do solo e sua relevância no geral, quer pelo facto do tempo de execução da obra ser praticamente o tempo do estágio. A obra consiste na execução de três células em painéis pré-fabricados SOPLACAS (paredes e cobertura), sendo que, as lajes de soleira de duas das células apoiam em poços e a laje de soleira da outra célula apoia directamente no terreno e em poços. Anexa às células encontra-se a câmara de manobras, executada em estrutura de betão armado.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Este relatório de estágio aborda as principais tecnologias de construção utilizadas e as metodologias de gestão implementadas na empreitada de “Ampliação do Cais do Terminal XXI - Terminal de Contentores de Sines”. Com o objectivo de fazer enquadramento desta empreitada é apresentado ainda um levantamento das soluções estruturais e processos construtivos mais utilizados, com base nas obras mais relevantes de construção de cais acostáveis de navios em Portugal e em Cabo Verde, recentemente construídas ou ainda em construção. Relativamente à obra em estudo foram analisados em detalhe os processos construtivos, associados a cada uma das actividades, e sistemas de gestão implementados no âmbito do prazo, custos, qualidade, ambiente, segurança e saúde e ainda da exploração dos navios. São ainda descritos os principais conhecimentos adquiridos com o acompanhamento desta obra, decorrentes de dificuldades ocorridas e boas práticas implementadas. As principais fontes de informação, que serviram de base à elaboração deste relatório, foram os projectos, caderno de encargos e documentos gerados em obra, sendo alguns destes documentos de obra elaborados pelo próprio autor. Por fim regista-se a enorme utilidade que este relatório trouxe para o autor, que desta forma registou e sistematizou os conhecimentos adquiridos durante a obra, e espera-se que seja uma boa referência para os engenheiros civis em geral no planeamento e gestão de futuras obras portuárias.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The definition and programming of distributed applications has become a major research issue due to the increasing availability of (large scale) distributed platforms and the requirements posed by the economical globalization. However, such a task requires a huge effort due to the complexity of the distributed environments: large amount of users may communicate and share information across different authority domains; moreover, the “execution environment” or “computations” are dynamic since the number of users and the computational infrastructure change in time. Grid environments, in particular, promise to be an answer to deal with such complexity, by providing high performance execution support to large amount of users, and resource sharing across different organizations. Nevertheless, programming in Grid environments is still a difficult task. There is a lack of high level programming paradigms and support tools that may guide the application developer and allow reusability of state-of-the-art solutions. Specifically, the main goal of the work presented in this thesis is to contribute to the simplification of the development cycle of applications for Grid environments by bringing structure and flexibility to three stages of that cycle through a commonmodel. The stages are: the design phase, the execution phase, and the reconfiguration phase. The common model is based on the manipulation of patterns through pattern operators, and the division of both patterns and operators into two categories, namely structural and behavioural. Moreover, both structural and behavioural patterns are first class entities at each of the aforesaid stages. At the design phase, patterns can be manipulated like other first class entities such as components. This allows a more structured way to build applications by reusing and composing state-of-the-art patterns. At the execution phase, patterns are units of execution control: it is possible, for example, to start or stop and to resume the execution of a pattern as a single entity. At the reconfiguration phase, patterns can also be manipulated as single entities with the additional advantage that it is possible to perform a structural reconfiguration while keeping some of the behavioural constraints, and vice-versa. For example, it is possible to replace a behavioural pattern, which was applied to some structural pattern, with another behavioural pattern. In this thesis, besides the proposal of the methodology for distributed application development, as sketched above, a definition of a relevant set of pattern operators was made. The methodology and the expressivity of the pattern operators were assessed through the development of several representative distributed applications. To support this validation, a prototype was designed and implemented, encompassing some relevant patterns and a significant part of the patterns operators defined. This prototype was based in the Triana environment; Triana supports the development and deployment of distributed applications in the Grid through a dataflow-based programming model. Additionally, this thesis also presents the analysis of a mapping of some operators for execution control onto the Distributed Resource Management Application API (DRMAA). This assessment confirmed the suitability of the proposed model, as well as the generality and flexibility of the defined pattern operators

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Relatório de Estágio para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Edificações

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE To evaluate the resistance of Aedes aegypti to temephos Fersol 1G (temephos 1% w/w) associated with the adaptive disadvantage of insect populations in the absence of selection pressure. METHODS A diagnostic dose of 0.28 mg a.i./L and doses between 0.28 mg a.i./L and 1.40 mg a.i./L were used. Vector populations collected between 2007 and 2008 in the city of Campina Grande, state of Paraíba, were evaluated. To evaluate competition in the absence of selection pressure, insect populations with initial frequencies of 20.0%, 40.0%, 60.0%, and 80.0% resistant individuals were produced and subjected to the diagnostic dose for two months. Evaluation of the development of aquatic and adult stages allowed comparison of the life cycles in susceptible and resistant populations and construction of fertility life tables. RESULTS No mortality was observed in Ae. aegypti populations subjected to the diagnostic dose of 0.28 mg a.i./L. The decreased mortality observed in populations containing 20.0%, 40.0%, 60.0%, and 80.0% resistant insects indicates that temephos resistance is unstable in the absence of selection pressure. A comparison of the life cycles indicated differences in the duration and viability of the larval phase, but no differences were observed in embryo development, sex ratio, adult longevity, and number of eggs per female. CONCLUSIONS The fertility life table results indicated that some populations had reproductive disadvantages compared with the susceptible population in the absence of selection pressure, indicating the presence of a fitness cost in populations resistant to temephos.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A construction project is a group of discernible tasks or activities that are conduct-ed in a coordinated effort to accomplish one or more objectives. Construction projects re-quire varying levels of cost, time and other resources. To plan and schedule a construction project, activities must be defined sufficiently. The level of detail determines the number of activities contained within the project plan and schedule. So, finding feasible schedules which efficiently use scarce resources is a challenging task within project management. In this context, the well-known Resource Constrained Project Scheduling Problem (RCPSP) has been studied during the last decades. In the RCPSP the activities of a project have to be scheduled such that the makespan of the project is minimized. So, the technological precedence constraints have to be observed as well as limitations of the renewable resources required to accomplish the activities. Once started, an activity may not be interrupted. This problem has been extended to a more realistic model, the multi-mode resource con-strained project scheduling problem (MRCPSP), where each activity can be performed in one out of several modes. Each mode of an activity represents an alternative way of combining different levels of resource requirements with a related duration. Each renewable resource has a limited availability for the entire project such as manpower and machines. This paper presents a hybrid genetic algorithm for the multi-mode resource-constrained pro-ject scheduling problem, in which multiple execution modes are available for each of the ac-tivities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme. It is evaluated the quality of the schedules and presents detailed comparative computational re-sults for the MRCPSP, which reveal that this approach is a competitive algorithm.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The interest in the development of climbing robots has grown rapidly in the last years. Climbing robots are useful devices that can be adopted in a variety of applications, such as maintenance and inspection in the process and construction industries. These systems are mainly adopted in places where direct access by a human operator is very expensive, because of the need for scaffolding, or very dangerous, due to the presence of an hostile environment. The main motivations are to increase the operation efficiency, by eliminating the costly assembly of scaffolding, or to protect human health and safety in hazardous tasks. Several climbing robots have already been developed, and other are under development, for applications ranging from cleaning to inspection of difficult to reach constructions. A wall climbing robot should not only be light, but also have large payload, so that it may reduce excessive adhesion forces and carry instrumentations during navigation. These machines should be capable of travelling over different types of surfaces, with different inclinations, such as floors, walls, or ceilings, and to walk between such surfaces (Elliot et al. (2006); Sattar et al. (2002)). Furthermore, they should be able of adapting and reconfiguring for various environment conditions and to be self-contained. Up to now, considerable research was devoted to these machines and various types of experimental models were already proposed (according to Chen et al. (2006), over 200 prototypes aimed at such applications had been developed in the world by the year 2006). However, we have to notice that the application of climbing robots is still limited. Apart from a couple successful industrialized products, most are only prototypes and few of them can be found in common use due to unsatisfactory performance in on-site tests (regarding aspects such as their speed, cost and reliability). Chen et al. (2006) present the main design problems affecting the system performance of climbing robots and also suggest solutions to these problems. The major two issues in the design of wall climbing robots are their locomotion and adhesion methods. With respect to the locomotion type, four types are often considered: the crawler, the wheeled, the legged and the propulsion robots. Although the crawler type is able to move relatively faster, it is not adequate to be applied in rough environments. On the other hand, the legged type easily copes with obstacles found in the environment, whereas generally its speed is lower and requires complex control systems. Regarding the adhesion to the surface, the robots should be able to produce a secure gripping force using a light-weight mechanism. The adhesion method is generally classified into four groups: suction force, magnetic, gripping to the surface and thrust force type. Nevertheless, recently new methods for assuring the adhesion, based in biological findings, were proposed. The vacuum type principle is light and easy to control though it presents the problem of supplying compressed air. An alternative, with costs in terms of weight, is the adoption of a vacuum pump. The magnetic type principle implies heavy actuators and is used only for ferromagnetic surfaces. The thrust force type robots make use of the forces developed by thrusters to adhere to the surfaces, but are used in very restricted and specific applications. Bearing these facts in mind, this chapter presents a survey of different applications and technologies adopted for the implementation of climbing robots locomotion and adhesion to surfaces, focusing on the new technologies that are recently being developed to fulfill these objectives. The chapter is organized as follows. Section two presents several applications of climbing robots. Sections three and four present the main locomotion principles, and the main "conventional" technologies for adhering to surfaces, respectively. Section five describes recent biological inspired technologies for robot adhesion to surfaces. Section six introduces several new architectures for climbing robots. Finally, section seven outlines the main conclusions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE To evaluate the validity and reliability of an instrument that evaluates the structure of primary health care units for the treatment of tuberculosis.METHODS This cross-sectional study used simple random sampling and evaluated 1,037 health care professionals from five Brazilian municipalities (Natal, state of Rio Grande do Norte; Cabedelo, state of Paraíba; Foz do Iguaçu, state of Parana; Sao José do Rio Preto, state of Sao Paulo, and Uberaba, state of Minas Gerais) in 2011. Structural indicators were identified and validated, considering different methods of organization of the health care system in the municipalities of different population sizes. Each structure represented the organization of health care services and contained the resources available for the execution of health care services: physical resources (equipment, consumables, and facilities); human resources (number and qualification); and resources for maintenance of the existing infrastructure and technology (deemed as the organization of health care services). The statistical analyses used in the validation process included reliability analysis, exploratory factor analysis, and confirmatory factor analysis.RESULTS The validation process indicated the retention of five factors, with 85.9% of the total variance explained, internal consistency between 0.6460 and 0.7802, and quality of fit of the confirmatory factor analysis of 0.995 using the goodness-of-fit index. The retained factors comprised five structural indicators: professionals involved in the care of tuberculosis patients, training, access to recording instruments, availability of supplies, and coordination of health care services with other levels of care. Availability of supplies had the best performance and the lowest coefficient of variation among the services evaluated. The indicators of assessment of human resources and coordination with other levels of care had satisfactory performance, but the latter showed the highest coefficient of variation. The performance of the indicators “training” and “access to recording instruments” was inferior to that of other indicators.CONCLUSIONS The instrument showed feasibility of application and potential to assess the structure of primary health care units for the treatment of tuberculosis.