951 resultados para Building simulation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

"The model of adolescent depression underlying the Resourceful Adolescent Project (RAP) suggests that adolescent depression and suicide result from a combination of some or all of three interrelating factors: (a) deficits in adolescent psychological wellbeing and coping resources; (b) escalating or chronic family conflict; and (c) depressive adolescent thoughts, feelings and behaviour. This overview of the activities of RAP outlines the need for the project, the benefits of early intervention in preventing adolescent depression, and the empirical and theoretical bases of the programs used in the project. The programs for adolescents and for their parents, their efficacy and the future directions of RAP are also discussed." -- from Libraries Australia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

China has experienced an extraordinary level of economic development since the 1990s, following excessive competition between different regions. This has resulted in many resource and environmental problems. Land resources, for example, are either abused or wasted in many regions. The strategy of development priority zoning (DPZ), proposed by the Chinese National 11th Five-Year Plan, provides an opportunity to solve these problems by coordinating regional development and protection. In line with the rational utilization of land, it is proposed that the DPZ strategy should be integrated with regional land use policy. As there has been little research to date on this issue, this paper introduces a system dynamic (SD) model for assessing land use change in China led by the DPZ strategy. Land use is characterized by the prioritization of land development, land utilization, land harness and land protection (D-U-H-P). By using the Delphi method, a corresponding suitable prioritization of D-U-H-P for the four types of DPZ, including optimized development zones (ODZ), key development zones (KDZ), restricted development zones (RDZ), and forbidden development zones (FDZ) are identified. Suichang County is used as a case study in which to conduct the simulation of land use change under the RDZ strategy. The findings enable a conceptualization to be made of DPZ-led land use change and the identification of further implications for land use planning generally. The SD model also provides a potential tool for local government to combine DPZ strategy at the national level with land use planning at the local level.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: The construction industry is well known for its high accident rate and many practitioners consider a preventative approach to be the most important means of bringing about improvements. This paper addresses previous research and the weaknesses of existing preventative approaches and a new application is described and illustrated involving the use of a multi-dimensional simulation tool - Construction Virtual Prototyping (CVP). Methodology: A literature review was conducted to investigate previous studies of hazard identification and safety management and to develop the new approach. Due to weaknesses in current practice, the research study explored the use of computer simulation techniques to create virtual environments where users can explore and identify construction hazards. Specifically, virtual prototyping technology was deployed to develop typical construction scenarios in which unsafe or hazardous incidents occur. In a case study, the users’ performance was evaluated their responses to incidents within the virtual environment and the effectiveness of the computer simulation system established though interviews with the safety project management team. Findings: The opinions and suggestions provided by the interviewees led to the initial conclusion that the simulation tool was useful in assisting the safety management team’s hazard identification process during the early design stage. Originality: The research introduces an innovative method to support the management teams’ reviews of construction site safety. The system utilises three-dimensional modelling and four-dimensional simulation of worker behaviour, a configuration that has previously not been employed in construction simulations. An illustration of the method’s use is also provided, together with a consideration of its strengths and weaknesses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction is undoubtedly the most dangerous industry in Hong Kong, being responsible for 76 percent of all fatal accidents in industry in the region – around twenty times more than any other industry. In this paper, it is argued that while this rate can be largely reduced by improved production practices in isolation from the project’s physical design, there is some scope for the design team to contribute to site safety. A new safety assessment method, the Virtual Safety Assessment System (VSAS), is described which offers assistance. This involves individual construction workers being presented with 3D virtual risky scenarios of their project and a range of possible actions for selection. The method provides an analysis of results, including an assessment of the correctness or otherwise of the user’s selections, contributing to an iterative process of retraining and testing until a satisfactory level of knowledge and skill is achieved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The future vehicle navigation for safety applications requires seamless positioning at the accuracy of sub-meter or better. However, standalone Global Positioning System (GPS) or Differential GPS (DGPS) suffer from solution outages while being used in restricted areas such as high-rise urban areas and tunnels due to the blockages of satellite signals. Smoothed DGPS can provide sub-meter positioning accuracy, but not the seamless requirement. A disadvantage of the traditional navigation aids such as Dead Reckoning and Inertial Measurement Unit onboard vehicles are either not accurate enough due to error accumulation or too expensive to be acceptable by the mass market vehicle users. One of the alternative technologies is to use the wireless infrastructure installed in roadside to locate vehicles in regions where the Global Navigation Satellite Systems (GNSS) signals are not available (for example: inside tunnels, urban canyons and large indoor car parks). The examples of roadside infrastructure which can be potentially used for positioning purposes could include Wireless Local Area Network (WLAN)/Wireless Personal Area Network (WPAN) based positioning systems, Ultra-wide band (UWB) based positioning systems, Dedicated Short Range Communication (DSRC) devices, Locata’s positioning technology, and accurate road surface height information over selected road segments such as tunnels. This research reviews and compares the possible wireless technologies that could possibly be installed along roadside for positioning purposes. Models and algorithms of integrating different positioning technologies are also presented. Various simulation schemes are designed to examine the performance benefits of united GNSS and roadside infrastructure for vehicle positioning. The results from these experimental studies have shown a number of useful findings. It is clear that in the open road environment where sufficient satellite signals can be obtained, the roadside wireless measurements contribute very little to the improvement of positioning accuracy at the sub-meter level, especially in the dual constellation cases. In the restricted outdoor environments where only a few GPS satellites, such as those with 45 elevations, can be received, the roadside distance measurements can help improve both positioning accuracy and availability to the sub-meter level. When the vehicle is travelling in tunnels with known heights of tunnel surfaces and roadside distance measurements, the sub-meter horizontal positioning accuracy is also achievable. Overall, simulation results have demonstrated that roadside infrastructure indeed has the potential to provide sub-meter vehicle position solutions for certain road safety applications if the properly deployed roadside measurements are obtainable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

How can a holistic approach to library and information science education encompassing vocational and university sectors that meets the future information workforce requirements be achieved? This paper will outline a twelve month national project that considered this very question. Funded by the Australian Learning and Teaching Council (ALTC).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ninth release of the Toolbox, represents over fifteen years of development and a substantial level of maturity. This version captures a large number of changes and extensions generated over the last two years which support my new book “Robotics, Vision & Control”. The Toolbox has always provided many functions that are useful for the study and simulation of classical arm-type robotics, for example such things as kinematics, dynamics, and trajectory generation. The Toolbox is based on a very general method of representing the kinematics and dynamics of serial-link manipulators. These parameters are encapsulated in MATLAB ® objects - robot objects can be created by the user for any serial-link manipulator and a number of examples are provided for well know robots such as the Puma 560 and the Stanford arm amongst others. The Toolbox also provides functions for manipulating and converting between datatypes such as vectors, homogeneous transformations and unit-quaternions which are necessary to represent 3-dimensional position and orientation. This ninth release of the Toolbox has been significantly extended to support mobile robots. For ground robots the Toolbox includes standard path planning algorithms (bug, distance transform, D*, PRM), kinodynamic planning (RRT), localization (EKF, particle filter), map building (EKF) and simultaneous localization and mapping (EKF), and a Simulink model a of non-holonomic vehicle. The Toolbox also including a detailed Simulink model for a quadcopter flying robot.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite an increased focus on proactive policing in recent years, criminal investigation is still perhaps the most important task of any law enforcement agency. As a result, the skills required to carry out a successful investigation or to be an ‘effective detective’ have been subjected to much attention and debate (Smith and Flanagan, 2000; Dean, 2000; Fahsing and Gottschalk, 2008:652). Stelfox (2008:303) states that “The service’s capacity to carry out investigations comprises almost entirely the expertise of investigators.” In this respect, Dean (2000) highlighted the need to profile criminal investigators in order to promote further understanding of the cognitive approaches they take to the process of criminal investigation. As a result of his research, Dean (2000) produced a theoretical framework of criminal investigation, which included four disparate cognitive or ‘thinking styles’. These styles were the ‘Method’, ‘Challenge’, ‘Skill’ and ‘Risk’. While the Method and Challenge styles deal with adherence to Standard Operating Procedures (SOPs) and the internal ‘drive’ that keeps an investigator going, the Skill and Risk styles both tap on the concept of creativity in policing. It is these two latter styles that provide the focus for this paper. This paper presents a brief discussion on Dean’s (2000) Skill and Risk styles before giving an overview of the broader literature on creativity in policing. The potential benefits of a creative approach as well as some hurdles which need to be overcome when proposing the integration of creativity within the policing sector are then discussed. Finally, the paper concludes by proposing further research into Dean’s (2000) skill and risk styles and also by stressing the need for significant changes to the structure and approach of the traditional policing organisation before creativity in policing is given the status it deserves.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There have been numerous calls over the years for the development of an accounting standard for not-for-profit entities (NFPEs). Probably the most commonly quoted in this regard is that from the Industry Commission Report No. 45 in 1995 which contained the following recommendation: The Commonwealth government should provide funds to the Australian Accounting Standards Board and the Public Sector Accounting Standards Board to develop within two years suitable accounting standards for Community Social Welfare Organisations. This recommendation was made over 5-years ago. Why has no action been taken towards its implementation?...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Information communication and technology (ICT) systems are almost ubiquitous in the modern world. It is hard to identify any industry, or for that matter any part of society, that is not in some way dependent on these systems and their continued secure operation. Therefore the security of information infrastructures, both on an organisational and societal level, is of critical importance. Information security risk assessment is an essential part of ensuring that these systems are appropriately protected and positioned to deal with a rapidly changing threat environment. The complexity of these systems and their inter-dependencies however, introduces a similar complexity to the information security risk assessment task. This complexity suggests that information security risk assessment cannot, optimally, be undertaken manually. Information security risk assessment for individual components of the information infrastructure can be aided by the use of a software tool, a type of simulation, which concentrates on modelling failure rather than normal operational simulation. Avoiding the modelling of the operational system will once again reduce the level of complexity of the assessment task. The use of such a tool provides the opportunity to reuse information in many different ways by developing a repository of relevant information to aid in both risk assessment and management and governance and compliance activities. Widespread use of such a tool allows the opportunity for the risk models developed for individual information infrastructure components to be connected in order to develop a model of information security exposures across the entire information infrastructure. In this thesis conceptual and practical aspects of risk and its underlying epistemology are analysed to produce a model suitable for application to information security risk assessment. Based on this work prototype software has been developed to explore these concepts for information security risk assessment. Initial work has been carried out to investigate the use of this software for information security compliance and governance activities. Finally, an initial concept for extending the use of this approach across an information infrastructure is presented.

Relevância:

20.00% 20.00%

Publicador: