840 resultados para operational reliability
Resumo:
The sugar cane crop is one of the main products in Brazil and according to several authors can generate, besides the industrialized stalks, an amount of crop residues from the order of 15 to 30 % in weight of the aerial part of the plants, depending on the field conditions. The sugar cane area in Brazil is around 5.5×106 hectares, with an amount of 400.106 tons of stalks, with stalks yield of 72 tons.ha-1. This study took place in a sugar cane plot (Latitude 22°46'S, Longitude 47°23'W and 600m of altitude) with 3% of slope, located in São Paulo State. The sugar cane variety was SP 80-1816, in its forth cut, 11 months old and with a planted row spacing of 1.40 m. By other side, several sugar mills are bringing the crop residue to their patio to produce energy with the bagasse. One choice is to bring the crop residue at the same moment with the stalks, avoiding the next operation of baling it. The objective of this study was to analyze some operational parameters of two different sugar cane harvesters under the same field conditions, which was divided in four treatments: T1 = CAMECO CHT2500B operating normally; T2 = CAMECO CHT2500B operating without the cleaning system; T3 = CASE 7700 operating normally; T4 = CASE 7700 operating without the cleaning system. The results obtained were: Table presented CEB = Gross effective capacity; CEL = Net effective capacity. The conclusion is that under normal operation the CASE harvester worked better then CAMECO in the parameters CEL stalks and Manipulation efficiency. And without the cleaning system operating CASE also worked better in the parameters of CEB raw material, CEB stalks, CEL raw material and CEL stalks.
Resumo:
Regulatory authorities in many countries, in order to maintain an acceptable balance between appropriate customer service qualities and costs, are introducing a performance-based regulation. These regulations impose penalties, and in some cases rewards, which introduce a component of financial risk to an electric power utility due to the uncertainty associated with preserving a specific level of system reliability. In Brazil, for instance, one of the reliability indices receiving special attention by the utilities is the Maximum Continuous Interruption Duration per customer (MCID). This paper describes a chronological Monte Carlo simulation approach to evaluate probability distributions of reliability indices, including the MCID, and the corresponding penalties. In order to get the desired efficiency, modern computational techniques are used for modeling (UML -Unified Modeling Language) as well as for programming (Object- Oriented Programming). Case studies on a simple distribution network and on real Brazilian distribution systems are presented and discussed. © Copyright KTH 2006.
Resumo:
This paper explains why the reliability assessment of energy limited systems requires more detailed models for primary generating resources availability, internal and external generating dispatch and customer demand than the ones commonly used for large power systems and presents a methodology based on the full sequential Montecarlo simulation technique with AC power flow for their long term reliability assessment which can properly include these detailed models. By means of a real example, it is shown how the simplified modeling traditionally used for large power systems leads to pessimistic predictions if it is applied to an energy limited system and also that it cannot predict all the load point adequacy problems. © 2006 IEEE.
Resumo:
The Nailed Box Beam structural efficiency is directly dependent of the flange-web joint behavior, which determines the partial composition of the section, as the displacement between elements reduces the effective rigidity of the section and changes the stress distribution and the total displacement of the section. This work discusses the use of Nailed Plywood Box Beams in small span timber bridges, focusing on the reliability of the beam element. It is presented the results of tests carried out in 21 full scale Nailed Plywood Box Beams. The analysis of maximum load tests results shows that it presents a normal distribution, permitting the characteristic values calculation as the normal distribution theory specifies. The reliability of those elements was analyzed focusing on a timber bridge design, to estimate the failure probability in function of the load level.
Resumo:
Includes bibliography
Resumo:
This paper presents a methodology to solve the transmission network expansion planning problem (TNEP) considering reliability and uncertainty in the demand. The proposed methodology provides an optimal expansion plan that allows the power system to operate adequately with an acceptable level of reliability and in an enviroment with uncertainness. The reliability criterion limits the expected value of the reliability index (LOLE - Loss Of Load Expectation) of the expanded system. The reliability is evaluated for the transmission system using an analytical technique based in enumeration. The mathematical model is solved, in a efficient way, using a specialized genetic algorithm of Chu-Beasley modified. Detailed results from an illustrative example are presented and discussed. © 2009 IEEE.
Resumo:
In an evermore competitive environment, power distribution companies need to continuously monitor and improve the reliability indices of their systems. The network reconfiguration (NR) of a distribution system is a technique that well adapts to this new deregulated environment for it allows improvement of system reliability indices without the onus involved in procuring new equipment. This paper presents a reliability-based NR methodology that uses metaheuristic techniques to search for the optimal network configuration. Three metaheuristics, i.e. Tabu Search, Evolution Strategy, and Differential Evolution, are tested using a Brazilian distribution network and the results are discussed. © 2009 IEEE.
Resumo:
Background: Neuropsychiatric symptoms (NPS) affect almost all patients with dementia and are a major focus of study and treatment. Accurate assessment of NPS through valid, sensitive and reliable measures is crucial. Although current NPS measures have many strengths, they also have some limitations (e.g. acquisition of data is limited to informants or caregivers as respondents, limited depth of items specific to moderate dementia). Therefore, we developed a revised version of the NPI, known as the NPI-C. The NPI-C includes expanded domains and items, and a clinician-rating methodology. This study evaluated the reliability and convergent validity of the NPI-C at ten international sites (seven languages). Methods: Face validity for 78 new items was obtained through a Delphi panel. A total of 128 dyads (caregivers/patients) from three severity categories of dementia (mild = 58, moderate = 49, severe = 21) were interviewed separately by two trained raters using two rating methods: the original NPI interview and a clinician-rated method. Rater 1 also administered four additional, established measures: the Apathy Evaluation Scale, the Brief Psychiatric Rating Scale, the Cohen-Mansfield Agitation Index, and the Cornell Scale for Depression in Dementia. Intraclass correlations were used to determine inter-rater reliability. Pearson correlations between the four relevant NPI-C domains and their corresponding outside measures were used for convergent validity. Results: Inter-rater reliability was strong for most items. Convergent validity was moderate (apathy and agitation) to strong (hallucinations and delusions; agitation and aberrant vocalization; and depression) for clinician ratings in NPI-C domains. Conclusion: Overall, the NPI-C shows promise as a versatile tool which can accurately measure NPS and which uses a uniform scale system to facilitate data comparisons across studies. Copyright © 2010 International Psychogeriatric Association.
Resumo:
As the number of simulation experiments increases, the necessity for validation and verification of these models demands special attention on the part of the simulation practitioners. By analyzing the current scientific literature, it is observed that the operational validation description presented in many papers does not agree on the importance designated to this process and about its applied techniques, subjective or objective. With the expectation of orienting professionals, researchers and students in simulation, this article aims to elaborate a practical guide through the compilation of statistical techniques in the operational validation of discrete simulation models. Finally, the guide's applicability was evaluated by using two study objects, which represent two manufacturing cells, one from the automobile industry and the other from a Brazilian tech company. For each application, the guide identified distinct steps, due to the different aspects that characterize the analyzed distributions. © 2011 Brazilian Operations Research Society.
Resumo:
Includes bibliography
Resumo:
The system reliability depends on the reliability of its components itself. Therefore, it is necessary a methodology capable of inferring the state of functionality of these components to establish reliable indices of quality. Allocation models for maintenance and protective devices, among others, have been used in order to improve the quality and availability of services on electric power distribution systems. This paper proposes a methodology for assessing the reliability of distribution system components in an integrated way, using probabilistic models and fuzzy inference systems to infer about the operation probability of each component. © 2012 IEEE.
Resumo:
The growing demand for steels with tighter compositional specifications led the Companhia Siderúrgica Nacional (CSN) to develop more efficient processes. To solve this problem this paper aims to identify the operational variables more impacting in the desulfurization process, specifically in torpedo car, as well as its causes and solutions. Then select and test, with laboratorial and industrial tests, desulfurizing agents based of CaC 2, CaO, CaCO3, and Mg to assess the cost per quantity of product desulfurized. The mixture with best results was not that one with highest content of CaC2. It is believed that this mixture showed better efficiency because of the increased agitation of the bath, produced by the releasing of gas from compound CaCO3 present in this mixture. Copyright © 2013 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Resumo:
Background: Several studies seek biological markers that give diagnostic and degree of tumor development. The aim of this study was to validate the determination of plasma DNA using nanotechnology (Nanovue™-NV) in samples of 80 patients with prostate cancer. Methods. Blood samples of 80 patients of the Urology Ambulatory of Faculdade de Medicina do ABC with prostate cancer confirmed by anatomical-pathology criteria were analyzed. DNA extraction was performed using a GFX TM kit (Amersham Pharmacia Biotech, Inc, USA) following the adapted protocol. Plasma was subjected to centrifugation. Results: There was a big difference between the first and the second value obtained by NanoVue Only two samples had no differences between duplicates. Maximum difference between duplicates was 38 μg/mL. Average variation between 51 samples was 10.29 μg/mL, although 21 samples had differences above this average. No correlation was observed between pDNA obtained by traditional spectrophotometry and by nanotechnology. Conclusion: Determination of plasma DNA by nanotechnology was not reproducible. © 2013 Moreno et al; licensee BioMed Central Ltd.
Resumo:
Objectives: This study evaluated the reliability and failure modes of implants with a microthreaded or smooth design at the crestal region, restored with screwed or cemented crowns. The postulated null hypothesis was that the presence of microthreads in the implant cervical region would not result in different reliability and strength to failure than smooth design, regardless of fixation method, when subjected to step-stress accelerated life-testing (SSALT) in water. Materials and methods: Eighty four dental implants (3.3 × 10 mm) were divided into four groups (n = 21) according to implant macrogeometric design at the crestal region and crown fixation method: Microthreads Screwed (MS); Smooth Screwed (SS); Microthreads Cemented (MC), and Smooth Cemented (SC). The abutments were torqued to the implants and standardized maxillary central incisor metallic crowns were cemented (MC, SC) or screwed (MS, SS) and subjected to SSALT in water. The probability of failure versus cycles (90% two-sided confidence intervals) was calculated and plotted using a power law relationship for damage accumulation. Reliability for a mission of 50,000 cycles at 150 N (90% 2-sided confidence intervals) was calculated. Differences between final failure loads during fatigue for each group were assessed by Kruskal-Wallis along with Benferroni's post hoc tests. Polarized-light and scanning electron microscopes were used for failure analyses. Results: The Beta (β) value (confidence interval range) derived from use level probability Weibull calculation of 1.30 (0.76-2.22), 1.17 (0.70-1.96), 1.12 (0.71-1.76), and 0.52 (0.30-0.89) for groups MC, SC, MS, and SS respectively, indicated that fatigue was an accelerating factor for all groups, except for SS. The calculated reliability was higher for SC (99%) compared to MC (87%). No difference was observed between screwed restorations (MS - 29%, SS - 43%). Failure involved abutment screw fracture for all groups. The cemented groups (MC, SC) presented more abutment and implant fractures. Significantly higher load to fracture values were observed for SC and MC relative to MS and SS (P < 0.001). Conclusion: Since reliability and strength to failure was higher for SC than for MC, our postulated null hypothesis was rejected. © 2012 John Wiley & Sons A/S.
Resumo:
Objective: Biological and mechanical implant-abutment connection complications and failures are still present in clinical practice, frequently compromising oral function. The purpose of this study was to evaluate the reliability and failure modes of anterior single-unit restorations in internal conical interface (ICI) implants using step-stress accelerated life testing (SSALT). Materials and methods: Forty-two ICI implants were distributed in two groups (n = 21 each): group AT-OsseoSpeed™ TX (Astra Tech, Waltham, MA, USA); group SV-Duocon System Line, Morse Taper (Signo Vinces Ltda., Campo Largo, PR, Brazil). The corresponding abutments were screwed to the implants and standardized maxillary central incisor metal crowns were cemented and subjected to SSALT in water. Use-level probability Weibull curves and reliability for a mission of 50,000 cycles at 200 N were calculated. Differences between groups were assessed by Kruskal-Wallis along with Bonferroni's post-hoc tests. Polarized-light and scanning electron microscopes were used for failure analyses. Results: The Beta (β) value derived from use level probability Weibull calculation was 1.62 (1.01-2.58) for group AT and 2.56 (1.76-3.74) for group SV, indicating that fatigue was an accelerating factor for failure of both groups. The reliability for group AT was 0.95 and for group SV was 0.88. Kruskal-Wallis along with Bonferroni's post-hoc tests showed no significant difference between the groups tested (P > 0.27). In all specimens of both groups, the chief failure mode was abutment fracture at the conical joint region and screw fracture at neck's region. Conclusions: Reliability was not different between investigated ICI connections supporting maxillary incisor crowns. Failure modes were similar. © 2012 John Wiley & Sons A/S.