980 resultados para Road construction
Resumo:
The International Road Assessment Program (iRAP) is a not-for-profit organisation that works in partnership with governments and non-government organisations in all parts of the world to make roads safe. The iRAP Malaysia pilot study on 3700km of road identified the potential to prevent 31,800 deaths and serious injuries over the next 20 years from proven engineering improvements. To help ensure the iRAP data and results are available to planners and engineers, iRAP, together with staff from the Centre for Accident Research and Road Safety – Queensland (CARRS-Q) and the Malaysian Institute of Road Safety Research (MIROS), developed a five-day iRAP training course that covers the background, theory and practical application of iRAP protocols, with a special focus on Malaysian case studies. Funding was provided by a competitive grant from the Australia-Malaysia Institute.
Resumo:
Visual recording devices such as video cameras, CCTVs, or webcams have been broadly used to facilitate work progress or safety monitoring on construction sites. Without human intervention, however, both real-time reasoning about captured scenes and interpretation of recorded images are challenging tasks. This article presents an exploratory method for automated object identification using standard video cameras on construction sites. The proposed method supports real-time detection and classification of mobile heavy equipment and workers. The background subtraction algorithm extracts motion pixels from an image sequence, the pixels are then grouped into regions to represent moving objects, and finally the regions are identified as a certain object using classifiers. For evaluating the method, the formulated computer-aided process was implemented on actual construction sites, and promising results were obtained. This article is expected to contribute to future applications of automated monitoring systems of work zone safety or productivity.
Resumo:
The current research aimed to profile off-road riders to identify specific sub-groups in relation to their risk-related behaviours and perceptions. A total of 235 adults from the Australian state of Queensland who had ridden a motorcycle or ATV off-road in the last 12 months were recruited. A cluster analysis was applied to the survey data. Two distinct clusters of riders were identified, which corresponded with the self-report of injury from an off-road riding crash in the prior 12 months. The injured cluster had a significantly higher mean risk propensity and use of safety equipment, though did not differ on self-reported risk taking. The injured cluster as a whole included a higher percentage of males, was younger, and rode more often for recreational or competitive purposes than the non-crash involved cluster. The results indicate that the crash cluster may be both more aware of the potential risks of riding and more willing to ride in a riskier manner.
Resumo:
Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.
Resumo:
Road deposited solids are a mix of pollutants originating from a range of anthropogenic sources common to urban land uses and soil inputs from surrounding areas. These particles accumulate potentially toxic pollutants thereby posing a threat to receiving waters. Reliable estimation of sources of particulate pollutants in build-up and quantification of particle composition is important for the development of best management practices for stormwater quality mitigation. The research study analysed build-up pollutants from sixteen different urban road surfaces and soil from four background locations. The road surfaces were selected from residential, industrial and commercial land uses from four suburbs in Gold Coast, Australia. Collected build-up samples were analysed for solids load, organic matter and mineralogy. The soil samples were analysed for mineralogy. Quantitative and qualitative analysis of mineralogical data, along with multivariate data analysis were employed to identify the relative source contributions to road deposited solids. The build-up load on road surfaces in different suburbs showed significant differences due to the nature of anthropogenic activities, road texture depth and antecedent dry period. Analysis revealed that build-up pollutants consists primarily of soil derived minerals (60%) and the remainder is composed of traffic generated pollutants and organic matter. Major mineral components detected were quartz and potential clay forming minerals such as albite, microline, chlorite and muscovite. An average of 40-50% of build-up pollutants by weight was made up of quartz. Comparison of the mineral component of build-up pollutants with background soil samples indicated that the minerals primarily originate from surrounding soils. About 2.2% of build-up pollutants were organic matter which originates largely from plant matter. Traffic related pollutants which are potentially toxic to the receiving water environment represented about 30% of the build-up pollutants at the study sites.
Resumo:
Public awareness of large infrastructure projects, many of which are delivered through networked arrangements is high for several reasons. These projects often involve significant public investment; they may involve multiple and conflicting stakeholders and can potentially have significant environmental impacts (Lim and Yang, 2008). To produce positive outcomes from infrastructure delivery it is imperative that stakeholder “buy in” be obtained particularly about decisions relating to the scale and location of infrastructure. Given the likelihood that stakeholders will have different levels of interest and investment in project outcomes, failure to manage this dynamic could potentially jeopardise project delivery by delaying or halting the construction of essential infrastructure. Consequently, stakeholder engagement has come to constitute a critical activity in infrastructure development delivered through networks. This paper draws on stakeholder theory and governance network theory and provides insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of road infrastructure. New knowledge about stakeholders has been obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory and the ladder of stakeholder management and engagement. By applying this model, the broad research question: “How do governance networks engage with stakeholders?” has been addressed. A multiple embedded case study design was selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurred in three governance networks delivering road infrastructure in Queensland. The outcomes of this research contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory is extended by showing how governance networks interact with stakeholders. From a practical perspective this research provides governance networks with an indication of how to more effectively undertake engagement with different types of stakeholders.
Resumo:
A basic understanding of the relationships between rainfall intensity, duration of rainfall and the amount of suspended particles in stormwater runoff generated from road surfaces has been gained mainly from past washoff experiments using rainfall simulators. Simulated rainfall was generally applied at constant intensities, whereas rainfall temporal patterns during actual storms are typically highly variable. This paper discusses a rationale for the application of the constant-intensity washoff concepts to actual storm event runoff. The rationale is tested using suspended particle load data collected at a road site located in Toowoomba, Australia. Agreement between the washoff concepts and measured data is most consistent for intermediate-duration storms (duration <5 h and >1 h). Particle loads resulting from these storm events increase linearly with average rainfall intensity. Above a threshold intensity, there is evidence to suggest a constant or plateau particle load is reached. The inclusion of a peak discharge factor (maximum 6 min rainfall intensity) enhances the ability to predict particle loads.
Resumo:
Community-based activism against proposed construction projects is growing. Many protests are poorly managed and escalate into long-term and sometimes acrimonious disputes which damage communities, firms and the construction industry as a whole. Using a thematic storytelling approach which draws on ethnographic method, within a single case study framework, new insights into the social forces that shape and sustain community-based protest against construction projects are provided. A conceptual model of protest movement continuity is presented which highlights the factors that sustain protest continuity over time. The model illustrates how social contagion leads to common community perceptions of development risk and opportunity, to a positive internalization of collective values and identity, to a strategic utilization of social capital and an awareness of the need to manage the emotional dynamics of protest through mechanisms such as symbolic artefacts.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
A significant reduction in carbon emissions is a global mission and the construction industry has an indispensable role to play as a major carbon dioxide (CO2) generator. Over the years, various building environmental assessment (BEA) models and concepts have been developed to promote environmentally responsible design and construction. However, limited attention has been placed on assessing and benchmarking the carbon emitted throughout the lifecycle of building facilities. This situation could undermine the construction industry’s potential to reduce its dependence on raw materials, recognise the negative impacts of producing new materials, and intensify the recycle and reuse process. In this paper, current BEA approaches adopted by the construction industry are first introduced. The focus of these models and concepts is then examined. Following a brief review of lifecycle analysis, the boundary in which a lifecycle carbon emission analysis should be set for a construction project is identified. The paper concludes by highlighting the potential barriers of applying lifecycle carbon emissions analysis in the construction industry. It is proposed that lifecycle carbon emission analysis can be integrated with existing BEA models to provide a more comprehensive and accurate evaluation on the cradle-to-grave environmental performance of a construction facility. In doing so, this can assist owners and clients to identify the optimum solution to maximise emissions reduction opportunities.
Resumo:
Project management in the construction industry involves coordination of many tasks and individuals, affected by complexity and uncertainty, which increases the need for efficient cooperation. Procurement is crucial since it sets the basis for cooperation between clients and contractors. This is true whether the project is local, regional or global in scope. Traditionally, procurement procedures are competitive, resulting in conflicts, adversarial relationships and less desirable project results. The purpose of this paper is to propose and empirically test an alternative procurement model based on cooperative procurement procedures that facilitates cooperation between clients and contractors in construction projects. The model is based on four multi-item constructs – incentive-based compensation, limited bidding options, partner selection and cooperation. Based on a sample of 87 client organisations, the model was empirically tested and exhibited strong support, including content, nomological, convergent and discriminant validity, as well as reliability. Our findings indicate that partner selection based on task related attributes mediates the relationship between two important pre-selection processes (incentive-based compensation and limited bid invitation) and preferred outcome of cooperation. The contribution of the paper is identifying valid and reliable measurement constructs and confirming a unique sequential order for achieving cooperation. Moreover, the findings are applicable for many types of construction projects because of the similarities in the construction industry worldwide.