985 resultados para project networks
Resumo:
A methodology to increase the probability of delivering power to any load point through the identification of new investments in distribution network components is proposed in this paper. The method minimizes the investment cost as well as the cost of energy not supplied in the network. A DC optimization model based on mixed integer non-linear programming is developed considering the Pareto front technique in order to identify the adequate investments in distribution networks components which allow increasing the probability of delivering power for any customer in the distribution system at the minimum possible cost for the system operator, while minimizing the energy not supplied cost. Thus, a multi-objective problem is formulated. To illustrate the application of the proposed methodology, the paper includes a case study which considers a 180 bus distribution network
Resumo:
The high penetration of distributed energy resources (DER) in distribution networks and the competitiveenvironment of electricity markets impose the use of new approaches in several domains. The networkcost allocation, traditionally used in transmission networks, should be adapted and used in the distribu-tion networks considering the specifications of the connected resources. The main goal is to develop afairer methodology trying to distribute the distribution network use costs to all players which are usingthe network in each period. In this paper, a model considering different type of costs (fixed, losses, andcongestion costs) is proposed comprising the use of a large set of DER, namely distributed generation(DG), demand response (DR) of direct load control type, energy storage systems (ESS), and electric vehi-cles with capability of discharging energy to the network, which is known as vehicle-to-grid (V2G). Theproposed model includes three distinct phases of operation. The first phase of the model consists in aneconomic dispatch based on an AC optimal power flow (AC-OPF); in the second phase Kirschen’s andBialek’s tracing algorithms are used and compared to evaluate the impact of each resource in the net-work. Finally, the MW-mile method is used in the third phase of the proposed model. A distributionnetwork of 33 buses with large penetration of DER is used to illustrate the application of the proposedmodel.
Resumo:
Most of distribution generation and smart grid research works are dedicated to the study of network operation parameters, reliability among others. However, many of this research works usually uses traditional test systems such as IEEE test systems. This work proposes a voltage magnitude study in presence of fault conditions considering the realistic specifications found in countries like Brazil. The methodology considers a hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzyprobabilistic models and a remedial action algorithm which is based on optimal power flow. To illustrate the application of the proposed method, the paper includes a case study that considers a real 12 bus sub-transmission network.
Resumo:
Most of distributed generation and smart grid research works are dedicated to network operation parameters studies, reliability, etc. However, many of these works normally uses traditional test systems, for instance, IEEE test systems. This paper proposes voltage magnitude and reliability studies in presence of fault conditions, considering realistic conditions found in countries like Brazil. The methodology considers a hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models and a remedial action algorithm which is based on optimal power flow. To illustrate the application of the proposed method, the paper includes a case study that considers a real 12-bus sub-transmission network.
Resumo:
O trabalho foi desenvolvido na empresa Masterprojetos – soluções integradas, através da elaboração e desenvolvimento do projeto de estabilidade de um edifício de cinco pisos, em que um deles se encontra enterrado. Este edifício incorpora um bloco de habitação multifamiliar e um bloco de habitação unifamiliar e comércio. Tanto o edifício como a empresa estão localizados no Peso da Régua. O trabalho pode-se dividir em duas partes: Numa primeira parte estão descritas as funções desempenhadas e contextualizada a metodologia de trabalho. Nesta parte está ainda descrita a ferramenta de trabalho Cypecad, a qual não houve oportunidade de aprender a usar durante o meu percurso académico e desenvolveu-se capacidades de maneira autodidata. São ainda referidos alguns softwares disponíveis no mercado, para o mesmo ramo de atividade. Numa segunda parte encontram-se descritos os pressupostos considerados no pré-dimensionamento do edifício assim como os elementos utilizados para a formulação do modelo de cálculo. Estão ainda feitas algumas verificações analíticas para a validação do modelo tido em conta para o dimensionamento. Estabeleceu-se também uma comparação entre as soluções obtidas através do software Cypecad e através do cálculo analítico para uma laje maciça. No final estão descritas as conclusões que foram obtidas, das quais se salientam a atenção que é necessário ter, quando se utiliza softwares de cálculo automático, quanto à introdução de dados e soluções que se obtêm , assim como a poupança de tempo que este tipo de ferramenta proporciona. É de referir também neste ponto as oportunidades que o estágio me proporcionou, como a visita de alguns locais de obras, as atividades de medição e orçamento de obra e acompanhamento de projetos de outras especialidades como redes prediais, térmica, acústica e ITED (infra-estruturas de Telecomunicações em Edifícios).
Resumo:
Poster presented at the Sixth Annual International Conference on Open Repositories (OR11) held on 6-11th June, Austin, Texas
Resumo:
O aumento da complexidade e das funcionalidades a fornecer pelos equipamentos de apoio à exploração de sistemas de redes de transporte criou um novo paradigma no qual vários intervenientes são chamados a fornecer módulos. Estes devem comunicar entre si de forma transparente, não devendo haver limitações colocadas pela tecnologia utilizada ou pelo facto de serem de fabricantes distintos. Este projeto de dissertação resulta de uma proposta da empresa EFACEC para a construção de um Simulador de um Sistema de Informação ao Público numa rede de transportes metro-ferroviária, que utilize como interface para comunicação com a plataforma de gestão EFARail a tecnologia de Web Services. Nesta dissertação faz-se um levantamento dos principais equipamentos utilizados em Sistemas de Informação ao Público e das funcionalidades disponibilizadas, assim como dastecnologias de Web Services que permitem responder aos requisitos e funcionalidades gerais do sistema. A aplicação desenvolvida permite a simulação duma rede de equipamentos visuais e sonoros de informação ao público que compõem uma linha metro-ferroviária. Desta forma é possível testar novos módulos sem necessidade de uma integração em ambiente real. Com isto pretende-se otimizar o processo de desenvolvimento, diminuindo os custos associados ao teste dos sub-sistemas que compõem a solução.
Resumo:
Paper presented at the 1st Winter School of PhD Programme on Technology Assessment on the December 6th and 7th, 2010, at the Universidade Nova de Lisboa campus of Caparica (Portugal). A final version was developed for the unit “Project III” of the same PhD programme on Technology Assessment at the Universidade Nova de Lisboa in 2010-11 under the supervision of Prof. António Brandão Moniz
Resumo:
The CDIO Initiative is an open innovative educational framework for engineering graduation degrees set in the context of Conceiving – Designing – Implementing – Operating real-world systems and products, which is embraced by a network of worldwide universities, the CDIO collaborators. A CDIO compliant engineering degree programme typically includes a capstone module on the final semester. Its purpose is to expose students to problems of a greater dimension and complexity than those faced throughout the degree programme as well as to put them in contact with the so-called real world, in opposition to the academic world. However, even in the CDIO context, there are barriers that separate engineering capstone students from the real world context of an engineering professional: (i) limited interaction with experts from diverse scientific areas; (ii) reduced cultural and scientific diversity within the teams; and (iii) lack of a project supportive framework to foster the complementary technical and non-technical skills required in an engineering professional. To address these shortcomings, we propose the adoption of the European Project Semester (EPS) framework, a one semester student centred international capstone programme offered by a group of European engineering schools (the EPS Providers) as part of their student exchange programme portfolio. The EPS package is organised around a central module – the EPS project – and a set of complementary supportive modules. Project proposals refer to open multidisciplinary real world problems and supervision becomes coaching. The students are organised in teams, grouping individuals from diverse academic backgrounds and nationalities, and each team is fully responsible for conducting its project. EPS complies with the CDIO directives on Design-Implement experiences and provides an integrated framework for undertaking capstone projects, which is focussed on multicultural and multidisciplinary teamwork, problem-solving, communication, creativity, leadership, entrepreneurship, ethical reasoning and global contextual analysis. As a result, we recommend the adoption of the EPS within CDIO capstone modules for the benefit of engineering students.
Resumo:
Dramatic narratives give emphasis to the process of storytelling of daily life. The script or story is constructed as a dialogue between actors. The words acquire a signification through a dynamic process of communication, where narratives are written not with a pencil but with the body, not written with the mind but with anima. In this paper we present a phenomenological analysis of an experience conducted in a middle grade school of Italy with the proposal to analyze how boys and girls see themselves and the opposite gender and how they perceive the equal opportunity between female and masculine roles.
Resumo:
As redes de terras são algo que atormenta muitas operadoras de telecomunicações. Quando o comum civil pensa que apenas existem antenas e que é importante a transmissão de dados porque naturalmente não lhes faz falta saber mais nada, as pessoas envolventes na construção de uma estação de telecomunicações têm preocupações não só com a parte de rádio e antenas, mas fundamentalmente com a parte de energia e de infra-estruturas. No desenvolvimento deste projecto, torna-se então importante perceber como as redes de terras são implementadas, como atingir valores satisfatórios para as operadoras, como realizar melhoria da rede de terras já existentes, implementar furos artesianos/valas e sobretudo como melhorar no futuro. Os materiais utilizados e o estudo prévio das condições do terreno onde a estação rádio-base é implementada nem sempre coincidem com os resultados desejados e que pensamos que seriam facilmente atingidos após implementação da torre. Neste projecto, vamos então acompanhar todos os processos, desde a legalização, construção, testes e finalmente a medição da resistência de terras final. Se os valores foram aceitáveis, óptimo para a operadora de telecomunicações e para a empresa responsável pela implementação. Caso os resultados estejam aquém das expectativas, é altura de selecionar os melhores e recorrendo a um conjunto de técnicas que garantam resultados e o menos dispêndio de dinheiro possível, vamos avançar para as melhorias. Os regimes de protecção das pessoas e da estação são bastante importantes. É importante também perceber as condições dos solos e saber simular com o programa ERICO que será fundamental para se efetuar uma comparação entre o teórico e o implementado praticamente. No fim, parte fulcral serão as medições finais, a relação preço-qualidade das melhorias implementadas, a análise dos resultados com argumentos válidos e o bom senso da operadora para aceitar ou rejeitar os trabalhos. Contrato é contrato, fazer mais e melhor é uma exigência constante.
Resumo:
Evidence indicates that exposure to high levels of noise adversely affects human health, and these effects are dependent upon various factors. In hospitals, there are many sources of noise, and high levels exert an impact on patients and staff, increasing both recovery time and stress, respectively. The goal of this pilot study was to develop, implement and evaluate the effectiveness of a training program (TP) on noise reduction in a Neonatal Intensive Care Units (NICU) by comparing the noise levels before and after the implementation of the program. A total of 79 health professionals participated in the study. The measurements of sound pressure levels took into account the layout of the unit and location of the main sources of noise. General results indicated that LAeq levels before implementation of the training program were often excessive, ranging from 48.7 ± 2.94 dBA to 71.7 ± 4.74 dBA, exceeding international guidelines. Similarly following implementation of the training program noise levels remained unchanged (54.5 ± 0.49 dBA to 63.9 ± 4.37 dBA), despite a decrease in some locations. There was no significant difference before and after the implementation of TP. However a significant difference was found for Lp, Cpeak, before and after training staff, suggesting greater care by healthcare professionals performing their tasks. Even recognizing that a TP is quite important to change behaviors, this needs to be considered in a broader context to effectively control noise in the NICU.
Resumo:
Dissertação apresentada como requisito parcial para obtenção do grau de Mestre em Estatística e Gestão de Informação