924 resultados para lightener evaluation system tyrosinaseTYR


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background The onsite treatment of sewage and effluent disposal is widely prevalent in rural and urban fringe areas due to the general unavailability of reticulated wastewater collection systems. Despite the low technology of the systems, failure is common and in many cases leading to adverse public health and environmental consequences. It is important therefore that careful consideration is given to the design and location of onsite sewage treatment systems. This requires an understanding of the factors that influence treatment performance. The use of subsurface absorption systems is the most common form of effluent disposal for onsite sewage treatment, particularly for septic tanks. Also, in the case of septic tanks, a subsurface disposal system is generally an integral component of the sewage treatment process. Site specific factors play a key role in the onsite treatment of sewage. The project The primary aims of the research project were: • to relate treatment performance of onsite sewage treatment systems to soil conditions at site; • to evaluate current research relating to onsite sewage treatment; and, • to identify key issues where currently there is a lack of relevant research. These tasks were undertaken with the objective of facilitating the development of performance based planning and management strategies for onsite sewage treatment. The primary focus of this research project has been on septic tanks. By implication, the investigation has been confined to subsurface soil absorption systems. The design and treatment processes taking place within the septic tank chamber itself did not form a part of the investigation. Five broad categories of soil types prevalent in the Brisbane region have been considered in this project. The number of systems investigated was based on the proportionate area of urban development within the Brisbane region located on each of the different soil types. In the initial phase of the investigation, the majority of the systems evaluated were septic tanks. However, a small number of aerobic wastewater treatment systems (AWTS) were also included. The primary aim was to compare the effluent quality of systems employing different generic treatment processes. It is important to note that the number of each different type of system investigated was relatively small. Consequently, this does not permit a statistical analysis to be undertaken of the results obtained for comparing different systems. This is an important issue considering the large number of soil physico-chemical parameters and landscape factors that can influence treatment performance and their wide variability. The report This report is the last in a series of three reports focussing on the performance evaluation of onsite treatment of sewage. The research project was initiated at the request of the Brisbane City Council. The project component discussed in the current report outlines the detailed soil investigations undertaken at a selected number of sites. In the initial field sampling, a number of soil chemical properties were assessed as indicators to investigate the extent of effluent flow and to help understand what soil factors renovate the applied effluent. The soil profile attributes, especially texture, structure and moisture regime were examined more in an engineering sense to determine the effect of movement of water into and through the soil. It is important to note that it is not only the physical characteristics, but also the chemical characteristics of the soil as well as landscape factors play a key role in the effluent renovation process. In order to understand the complex processes taking place in a subsurface effluent disposal area, influential parameters were identified using soil chemical concepts. Accordingly, the primary focus of this final phase of the research project was to identify linkages between various soil chemical parameters and landscape patterns and their contribution to the effluent renovation process. The research outcomes will contribute to the development of robust criteria for evaluating the performance of subsurface effluent disposal systems. The outcomes The key findings from the soil investigations undertaken are: • Effluent renovation is primarily undertaken by a combination of various soil physico-chemical parameters and landscape factors, thereby making the effluent renovation processes strongly site dependent. • Decisions regarding site suitability for effluent disposal should not be based purely in terms of the soil type. A number of other factors such as the site location in the catena, the drainage characteristics and other physical and chemical characteristics, also exert a strong influence on site suitability. • Sites, which are difficult to characterise in terms of suitability for effluent disposal, will require a detailed soil physical and chemical analysis to be undertaken to a minimum depth of at least 1.2 m. • The Ca:Mg ratio and Exchangeable Sodium Percentage are important parameters in soil suitability assessment. A Ca:Mg ratio of less than 0.5 would generally indicate a high ESP. This in turn would mean that Na and possibly Mg are the dominant exchangeable cations, leading to probable clay dispersion. • A Ca:Mg ratio greater than 0.5 would generally indicate a low ESP in the profile, which in turn indicates increased soil stability. • In higher clay percentage soils, low ESP can have a significant effect. • The presence of high exchangeable Na can be counteracted by the presence of swelling clays, and an exchange complex co-dominated by exchangeable Ca and exchangeable Mg. This aids absorption of cations at depth, thereby reducing the likelihood of dispersion. • Salt is continually added to the soil by the effluent and problems may arise if the added salts accumulate to a concentration that is harmful to the soil structure. Under such conditions, good drainage is essential in order to allow continuous movement of water and salt through the profile. Therefore, for a site to be sustainable, it would have a maximum application rate of effluent. This would be dependent on subsurface characteristics and the surface area available for effluent disposal. • The dosing regime for effluent disposal can play a significant role in the prevention of salt accumulation in the case of poorly draining sites. Though intermittent dosing was not considered satisfactory for the removal of the clogging mat layer, it has positive attributes in the context of removal of accumulated salts in the soil.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Systematic studies that evaluate the quality of decision-making processes are relatively rare. Using the literature on decision quality, this research develops a framework to assess the quality of decision-making processes for resolving boundary conflicts in the Philippines. The evaluation framework breaks down the decision-making process into three components (the decision procedure, the decision method, and the decision unit) and is applied to two ex-post (one resolved and one unresolved) and one ex-ante cases. The evaluation results from the resolved and the unresolved cases show that the choice of decision method plays a minor role in resolving boundary conflicts whereas the choice of decision procedure is more influential. In the end, a decision unit can choose a simple method to resolve the conflict. The ex-ante case presents a follow-up intended to resolve the unresolved case for a changing decision-making process in which the associated decision unit plans to apply the spatial multi criteria evaluation (SMCE) tool as a decision method. The evaluation results from the ex-ante case confirm that the SMCE has the potential to enhance the decision quality because: a) it provides high quality as a decision method in this changing process, and b) the weaknesses associated with the decision unit and the decision procedure of the unresolved case were found to be eliminated in this process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper illustrates a field research performed with a team of experts involved in the evaluation of Trippple, a system aimed at supporting the different phases of a tourist trip, in order to provide feedback and insights, both on the functionalities already implemented (that at the time of evaluation were available only as early and very unstable prototypes), and on the functionalities still to be implemented. We show how the involvement of professionals helped to focus on challenging aspects, instead of less important, cosmetic, issues and resulted profitable in terms of early feedback, issues spotted, and improvements suggested

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The IEEE Subcommittee on the Application of Probability Methods (APM) published the IEEE Reliability Test System (RTS) [1] in 1979. This system provides a consistent and generally acceptable set of data that can be used both in generation capacity and in composite system reliability evaluation [2,3]. The test system provides a basis for the comparison of results obtained by different people using different methods. Prior to its publication, there was no general agreement on either the system or the data that should be used to demonstrate or test various techniques developed to conduct reliability studies. Development of reliability assessment techniques and programs are very dependent on the intent behind the development as the experience of one power utility with their system may be quite different from that of another utility. The development and the utilization of a reliability program are, therefore, greatly influenced by the experience of a utlity and the intent of the system manager, planner and designer conducting the reliability studies. The IEEE-RTS has proved to be extremely valuable in highlighting and comparing the capabilities (or incapabilities) of programs used in reliability studies, the differences in the perception of various power utilities and the differences in the solution techniques. The IEEE-RTS contains a reasonably large power network which can be difficult to use for initial studies in an educational environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The IEEE Reliability Test System (RTS) developed by the Application of Probability Method Subcommittee has been used to compare and test a wide range of generating capacity and composite system evaluation techniques and subsequent digital computer programs. A basic reliability test system is presented which has evolved from the reliability education and research programs conducted by the Power System Research Group at the University of Saskatchewan. The basic system data necessary for adequacy evaluation at the generation and composite generation and transmission system levels are presented together with the fundamental data required to conduct reliability-cost/reliability-worth evaluation

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Capacity probability models of generating units are commonly used in many power system reliability studies, at hierarchical level one (HLI). Analytical modelling of a generating system with many units or generating units with many derated states in a system, can result in an extensive number of states in the capacity model. Limitations on available memory and computational time of present computer facilities can pose difficulties for assessment of such systems in many studies. A cluster procedure using the nearest centroid sorting method was used for IEEE-RTS load model. The application proved to be very effective in producing a highly similar model with substantially fewer states. This paper presents an extended application of the clustering method to include capacity probability representation. A series of sensitivity studies are illustrated using IEEE-RTS generating system and load models. The loss of load and energy expectations (LOLE, LOEE), are used as indicators to evaluate the application

Relevância:

30.00% 30.00%

Publicador:

Resumo:

On average, 560 fatal run-off-road crashes occur annually in Australia and 135 in New Zealand. In addition, there are more than 14,000 run-off-road crashes causing injuries each year across both countries. In rural areas, run-off-road casualty crashes constitute 50-60% of all casualty crashes. Their severity is particularly high with more than half of those involved sustaining fatal or serious injuries. This paper reviews the existing approach to roadside hazard risk assessment, selection of clear zones and hazard treatments. It proposes a modified approach to roadside safety evaluation and management. It is a methodology based on statistical modelling of run-off-road casualty crashes, and application of locally developed crash modification factors and severity indices. Clear zones, safety barriers and other roadside design/treatment options are evaluated with a view to minimise fatal and serious injuries – the key Safe System objective. The paper concludes with a practical demonstration of the proposed approach. The paper is based on findings from a four-year Austroads research project into improving roadside safety in the Safe System context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Increasing use of computerized systems in our daily lives creates new adversarial opportunities for which complex mechanisms are exploited to mend the rapid development of new attacks. Behavioral Biometrics appear as one of the promising response to these attacks. But it is a relatively new research area, specific frameworks for evaluation and development of behavioral biometrics solutions could not be found yet. In this paper we present a conception of a generic framework and runtime environment which will enable researchers to develop, evaluate and compare their behavioral biometrics solutions with repeatable experiments under the same conditions with the same data.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Computer worms represent a serious threat for modern communication infrastructures. These epidemics can cause great damage such as financial losses or interruption of critical services which support lives of citizens. These worms can spread with a speed which prevents instant human intervention. Therefore automatic detection and mitigation techniques need to be developed. However, if these techniques are not designed and intensively tested in realistic environments, they may cause even more harm as they heavily interfere with high volume communication flows. We present a simulation model which allows studies of worm spread and counter measures in large scale multi-AS topologies with millions of IP addresses.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We present a virtual test bed for network security evaluation in mid-scale telecommunication networks. Migration from simulation scenarios towards the test bed is supported and enables researchers to evaluate experiments in a more realistic environment. We provide a comprehensive interface to manage, run and evaluate experiments. On basis of a concrete example we show how the proposed test bed can be utilized.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The evolution of classic power grids to smart grids creates chances for most participants in the energy sector. Customers can save money by reducing energy consumption, energy providers can better predict energy demand and environment benefits since lower energy consumption implies lower energy production including a decrease of emissions from plants. But information and communication systems supporting smart grids can also be subject to classical or new network attacks. Attacks can result in serious damage such as harming privacy of customers, creating economical loss and even disturb the power supply/demand balance of large regions and countries. In this paper, we give an overview about the German smart measuring architecture, protocols and security. Afterwards, we present a simulation framework which enables researchers to analyze security aspects of smart measuring scenarios.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In 2005 the Australian Capital Territory (ACT) Office of the Director of Public Prosecutions (DPP) and the Australian Federal Police (AFP) produced a report, Responding to sexual assault: The challenge of change (DPP & AFP 2005), which made 105 recommendations for reforming the way sexual offence cases are handled by the ACT’s criminal justice system. The Sexual Assault Reform Program (SARP) is one key initiative developed in response to these recommendations. Managed by the ACT Justice and Community Safety Directorate (JACS), SARP’s main objective is to improve aspects of the criminal justice system relating to: processes and support for victims of sexual offences as they progress through the system; attrition in sexual offence matters in the criminal justice system; and coordination and collaboration among the agencies involved. In November 2007 the ACT Attorney-General announced $4 million of funding for several SARP reforms. This funding provided for additional victim support staff; a dedicated additional police officer, prosecutor and legal policy officer; and an upgrade of equipment for the Supreme Court and Magistrates Court, including improvements in technology to assist witnesses in giving evidence, and the establishment of an off-site facility to allow witnesses to give evidence from a location outside of the court. In addition, the reform agenda included a number of legislative amendments that changed how evidence can be given by victims of sexual and family violence offences, children and other vulnerable witnesses. The primary objectives of these legislative changes are to provide an unintimidating, safe environment for vulnerable witnesses (including sexual offence complainants) to give evidence and to obtain prompt statements from witnesses to improve the quality of evidence captured (DPP 2009: 13). The current evaluation The funding for SARP reforms also provided for a preliminary evaluation of the reforms; this report outlines findings from the evaluation. The evaluation sought to address whether the program has met its key objectives: better support for victims, lower attrition rates and improved coordination and collaboration among agencies involved in administering SARP. The evaluation was conducted in two stages and involved a mixed-methods approach. During stage 1 key indicators for the evaluation were developed with stakeholders. During stage 2 quantitative data were collected by stakeholders and provided to the AIC for analysis. Qualitative interviews were also conducted with service delivery providers, and with a small number (n=5) of victim/survivors of sexual offences whose cases had recently been resolved in the ACT criminal justice system. The current evaluation is preliminary in nature. As the SARP reforms will take time to become entrenched within the ACT’s criminal justice system, some of the impacts of the reforms may not yet be evident. Nonetheless, this evaluation provides an insight into how well the SARP reforms have been implemented to date, as well as key areas that could be addressed in the future. Key findings from the preliminary evaluation are outlined briefly below.