856 resultados para e-procurement


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The paper examines how European retailers are using private standards for food safety and,quality as risk management and competitive tools and the strategic responses of leading Kenyan and other developing country supplier/exporters to such standards. Despite measures to harmonize a 'single market', the European fresh produce market is very diverse in terms of consumer preferences, structural dynamics and attention to and enforcement of food safety and other standards. Leading Kenyan fresh produce suppliers have re-positioned themselves at the high end, including 'high care', segments of the market - precisely those that are most demanding in terms of quality assurance and food safety systems. An array of factors have influenced this strategic positioning, including relatively high international freight costs, the emergence of more effective competition in mainstream product lines, relatively low labor costs for produce preparation, and strong market relationships with selected retail chains. To succeed in this demanding market segment, the industry has had to invest substantially in improved production and procurement systems, upgraded pack house facilities, and quality assurance/food safety management systems. (C) 2005 Elsevier Ltd. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The overall significance of the construction and building services sector internationally cannot be overemphasised. In the UK, the industry currently accounts for 10% gross domestic product (GDP) and employs 2 million people, which is more than 1 in 14 of the total workforce. However, regardless of its output (approximately £65 billion annually) there has been a steady decline in the number of trade entrants into the construction and building services sector. Consequently, the available ‘pool of labour’ is inadequately resourced; productivity is low; the existing labour force is overstressed; there is an increase in site deaths; and a long-term labour shortage is envisaged. Today, the evidence seems to suggest that multiskilling is a tentative redress for ameliorating the skills crisis in the construction and building sectors. A 43-year time-series of data on 23 manpower attributes was evaluated as part of this investigation. The developed linear regression models show that the concept of multiskilling obeys the ‘law of diminishing returns'. That is, a weak relation was found between construction output and a three or more combination of manpower attributes. An optimisation model is prescribed for traditional trades.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to investigate the concepts of intelligent buildings (IBs), and the opportunities offered by the application of computer-aided facilities management (CAFM) systems. Design/methodology/approach – In this paper definitions of IBs are investigated, particularly definitions that are embracing open standards for effective operational change, using a questionnaire survey. The survey further investigated the extension of CAFM to IBs concepts and the opportunities that such integrated systems will provide to facilities management (FM) professionals. Findings – The results showed variation in the understanding of the concept of IBs and the application of CAFM. The survey showed that 46 per cent of respondents use a CAFM system with a majority agreeing on the potential of CAFM in delivery of effective facilities. Research limitations/implications – The questionnaire survey results are limited to the views of the respondents within the context of FM in the UK. Practical implications – Following on the many definitions of an IB does not necessarily lead to technologies of equipment that conform to an open standard. This open standard and documentation of systems produced by vendors is the key to integrating CAFM with other building management systems (BMS) and further harnessing the application of CAFM for IBs. Originality/value – The paper gives experience-based suggestions for both demand and supply sides of the service procurement to gain the feasible benefits and avoid the currently hindering obstacles, as the paper provides insight to the current and future tools for the mobile aspects of FM. The findings are relevant for service providers and operators as well.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report addresses the extent that managerial practices can be shared between the aerospace and construction sectors. Current recipes for learning from other industries tend to be oversimplistic and often fail to recognise the embedded and contextual nature of managerial knowledge. Knowledge sharing between business sectors is best understood as an essential source of innovation. The process of comparison challenges assumptions and better equips managers to cope with future change. Comparisons between the aerospace and construction sectors are especially useful because they are so different. The two sectors differ hugely in terms of their institutional context, structure and technological intensity. The aerospace sector has experienced extensive consolidation and is dominated by a small number of global companies. Aerospace companies operate within complex networks of global interdependency such that collaborative working is a commercial imperative. In contrast, the construction sector remains highly fragmented and is characterised by a continued reliance on small firms. The vast majority of construction firms compete within localised markets that are too often characterised by opportunistic behaviour. Comparing construction to aerospace highlights the unique characteristics of both sectors and helps explain how managerial practices are mediated by context. Detailed comparisons between the two sectors are made in a range of areas and guidance is provided for the implementation of knowledge sharing strategies within and across organisations. The commonly accepted notion of ‘best practice’ is exposed as a myth. Indeed, universal models of best practice can be detrimental to performance by deflecting from the need to adapt continuously to changing circumstances. Competitiveness in the construction sector too often rests on efficiency in managing contracts, with a particular emphasis on the allocation of risk. Innovation in construction tends to be problem-driven and is rarely shared from project to project. In aerospace, the dominant model of competitiveness means that firms have little choice other than to invest in continuous innovation, despite difficult trading conditions. Research and development (R&D) expenditure in aerospace continues to rise as a percentage of turnovers. A sustained capacity for innovation within the aerospace sector depends crucially upon stability and continuity of work. In the construction sector, the emergence of the ‘hollowed-out’ firm has undermined the industry’s capacity for innovation. Integrated procurement contexts such as prime contracting in construction potentially provide a more supportive climate for an innovation-based model of competitiveness. However, investment in new ways of working depends upon a shift in thinking not only amongst construction contractors, but also amongst the industry’s major clients.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Clients and contractors need to be aware of the project’s legal environment because the viability of a procurement strategy can be vitiated by legal rules. This is particularly true regarding Performance-Based Contracting (PBC) whose viability may be threatened by rules of property law: while the PBC concept does not require that the contractor transfers the ownership in the building materials used to the client, the rules of property law often lead to an automatic transfer of ownership. But does the legal environment really render PBC unfeasible? In particular, is PBC unfeasible because contractors lose their materials as assets? These questions need to be answered with respect to the applicable property law. As a case study, English property law has been chosen. Under English law, the rule which governs the automatic transfer of ownership is called quicquid plantatur solo, solo credit (whatever is fixed to the soil belongs to the soil). An analysis of this rule reveals that not all materials which are affixed to land become part of the land. This fate only occurs in relation to materials which have been affixed with the intention of permanently improving the land. Five fictitious PBC cases have been considered in terms of the legal status of the materials involved, and several subsequent legal questions have been addressed. The results suggest that English law does actually threaten the feasibility of PBC in some cases. However, it is also shown that the law provides means to circumvent the unwanted results which flow from the rules of property law. In particular, contractors who are interested in keeping their materials as assets can insist on agreeing a property right in the client’s land, i.e. a contractor’s lien. Therefore, the outcome is that English property law does not render the implementation of the PBC concept unfeasible. At a broader level, the results contribute to the theoretical framework of PBC as an increasingly used procurement strategy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

FIDIC has over the years produced standard forms of contracts for the international procurement of projects. A source of continuing criticism of its Red Book concerns the duality in the traditional role of the engineer as the employer's agent and as an independent third party holding the balance fairly between the employer and the contractor. In response to this and other criticisms FIDIC produced a replacement for it in 1999. The role of the engineer under the new Red Book is critically examined in the light of relevant case law, expert commentaries and feedback from two multidisciplinary workshops with international participation. The examination identified three major changes: (1) a duty to act impartially has been replaced by a duty to make fair determination of certain matters; (2) it is open to parties to allow greater control of the engineer by the employer by stating in the appropriate part of the contract powers the engineer must not exercise without the employer's approval; (3) there is provision for a Dispute Adjudication Board (DAB) to which disputes may be referred. Although the duality has not been eliminated completely, the contract is structured flexibly enough to support those who wish to contract on the basis of the engineer acting solely as the agent of the employer.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Current literature offers little understanding about how procurement methods are enacted in practice. Developments in procurement are often viewed as the result of responding to recommendations from particular constituents within the sector. The research seeks to remove itself from such deterministic leaning, counselling instead that procurement should not be viewed in static terms, but dynamically manifesting over time within a complex web of interconnections between various actors, their situated context and the broader industrial structure. Attention is given to how a client and construction firm engaged in a collusive interaction to realise an innovative procurement method that derived its legitimacy from a backcloth of initiatives promoted by various commentators. A case study of a medium-size regional contractor demonstrates how the first partnering arrangement was enacted within the UK affordable housing maintenance sector in the UK. The case study finds that the enactment of new procurement methods strongly relies on iterative learning between clients and contractors. It is further suggested that construction firms need to initiate new procurement in order to remain competitive within the sector. The findings point towards a pro-active initiative by the contractor and client to enact a ‘procurement first’. Encouragement may be drawn from this example by other contractors seeking to offer more than simply responsive procurement solutions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

From a construction perspective, Public-Private Partnership projects (PPPs) are often credited as providing real incentives for the actors involved as well as a business environment that is conducive to innovation and improved practices. The validity of four common rhetorical arguments used to promote the PPP procurement route is explored: collaborative working, design freedom, long-term commitment and risk transfer. Particular interest is given to the extent to which espoused intentions correlate with experienced realities in allowing actors involved in the design and construction phases to be presented with, and able to exploit, opportunities for technological innovation. It is argued that there is reason to be cautious in fully accepting the purported benefits of the PPP framework and that the arguments often presented need to be revised. Alternative interpretations are provided.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to propose a process model for knowledge transfer in using theories relating knowledge communication and knowledge translation. Design/methodology/approach – Most of what is put forward in this paper is based on a research project titled “Procurement for innovation and knowledge transfer (ProFIK)”. The project is funded by a UK government research council – The Engineering and Physical Sciences Research Council (EPSRC). The discussions are mainly grounded on a thorough review of literature accomplished as part of the research project. Findings – The process model developed in this paper has built upon the theory of knowledge transfer and the theory of communication. Knowledge transfer, per se, is not a mere transfer of knowledge. It involves different stages of knowledge transformation. Depending on the context of knowledge transfer, it can also be influenced by many factors; some positive and some negative. The developed model of knowledge transfer attempts to encapsulate all these issues in order to create a holistic framework. Originality/value of paper – An attempt has been made in the paper to combine some of the significant theories or findings relating to knowledge transfer together, making the paper an original and valuable one.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Innovation is notoriously difficult to define and is invariably intertwined with issues of knowledge creation, continuous improvement and organisational change. An extensive literature classifies numerous types of innovation and militates against any simplistic attempt at definition. It is widely accepted that innovation is at least partly dependent upon the surrounding environment. Industry recipes and institutionally embedded practices shape the environment within which innovation occurs. Recent research directions have addressed the diffusion of innovation and its dependence upon social and institutional structures. In this respect, it is highly pertinent to compare the way that innovation is interpreted and enacted in different industrial sectors. The comparison between UK aerospace and construction is especially revealing because the two sectors are so different and therefore constitute radically different climates for innovation. Empirical research is reported based on semi-structured interviews with practitioners from both sectors. Interpretations of innovation are found to differ dramatically between aerospace and construction. Within the context of an ongoing struggle to define innovation, both industries are striving to become more innovative. The aerospace sector is found to emphasise technical innovation whereas the construction sector emphasises process innovation. An overriding cultural bias in Western economies towards technological innovation results in the common perception that aerospace is much more innovative than construction. The experienced realities of practitioners in the two sectors are much more complex.