875 resultados para Graphic design Project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The role of individuals in the innovation process is highlighted as system integrator and/or champion in literature, however, little is known about championing role of a project manager. Our contention is that the role of the project manager (PM) is essentially of a champion to enable innovation and achieve desired project performance in construction project environment. Hypothesizing that championing behaviour is determined by a number of individual and situational factors, which in turn effects on level of innovation and project performance, we used correlation and regression analysis to test the hypotheses. A survey was carried out with project managers and project team members in 32 building and civil engineering projects in Singapore to test the hypothesized relationships. The results corroborate the importance of championing behaviour to fostering innovation and achieve better project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

QUT Linking Karumba Project This exhibition showcases the work of 3rd -4th year undergraduate landscape architecture, architecture, Industrial Design, Environmental Engineering, Civil Engineering students in response to issues of sustainability in the Gulf of Carpentaria town of Karumba. It presented the final, polished set of work to the Karumba and Carpentaria Shire community, following revisions in line with feedback from the 2008 exhibition. 16 students and four staff set off on a 2488km journey to undertake the first half of the Carpentaria Project: a fortnight-long strategic planning project entitled Linking Karumba to encourage social, economic, environmental and cultural linkages across the town. Karumba, along with the nearby town of Normanton, is one of Queensland’s most remote settlements. Its economy is based on fishing, tourism, and mining. It has two centres, 2.5km apart by river, or 9km by road. This physical disconnect was identified by Carpentaria Shire Council (CSC) and the Karumba Progress Association (KPA) as a source of socio-cultural disconnection, which formed the basis of our project brief. Student designs were highly responsive to the character of Karumba’s culture and environment, indicating remarkable levels of immersion, and attracting $830 000 in Qld. state government funding for implementation. The Exhibition Four groups of four students produced four strategic planning and design options toward this future: Make the Switch: Alice Anonuevo, Michael Marriott, Carla Priestley & Grant Harvey Realigning the Systems: Claudia Bergs, Rebecca Stephens, Anna Coulson & Lois Kerrigan Diversification of Experience: Rebecca North, Kyle Bush, Debra Sullivan & Jenna Green The River is the Main Street: Ashley Nicholson, Monica Kuiken, Dean Bowen & Bill Schild

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The socio-cultural purpose of the university has been de-emphasised in recent decades, however, various community engagement projects that have been undertaken by design schools in higher education institutions are bringing this back into focus. Through the design skills of academic staff and students, a number of projects have been identified and undertaken in partnership with communities as well as the public and private sectors. The 2008 ‘Linking Karumba’ project, among others, shows that academy-based design and education professionals can contribute to social development through making good design accessible to disadvantaged communities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

QUT Learning and Teaching Unit QUT Grants Workshops 2. Undertaking a Successful Project The purpose of this workshop was to assist QUT grant recipients to make connections, identify synergies and build a sense of scholarly community with each other; leverage grants outwards and possibly upwards; share factors that should be considered to undertake a successful project. Presenter: Shannon Satherley. "Initial Planning = Flexibility, Sanity & Success (or at least honourable failure) 1. Top & Tail 2. Divide and Delineate 3. Communicate Clearly & Consistently"

Relevância:

30.00% 30.00%

Publicador:

Resumo:

QUT Alumni and Development Office, Engagement and Partnerships Seminar 'Managing Partnerships' As part of a week of engagement/partnership activities, this seminar outlined the engagement practices of 'Sustainable Futures by Design' and the BAC partnership. Presenters of two QUT Engagement Innovation projects discussed how emphasis on how the project benefited their work and the university generally, especially through the partnership, including through enhanced teaching and research. They outlined the principles and practices of good partnership management. Presenters: Shannon Satherley & Les Dawes: Community Engagement: Creating Sustainable Futures by Design Ashantha Goonetilleke & Bernard Murchison: QUT - BAC Partnership Satherley & Dawes: 'Developing and Maintaining the Partnerships: giving and receiving; expecting the unexpected; administration; enjoying the rewards.'C

Relevância:

30.00% 30.00%

Publicador:

Resumo:

QUT Learning and Teaching Unit Seminar Making a Real Difference: Learning and Teaching Grants Showcase This event recognised and shared teaching innovations, including those from faculty learning and teaching grants. The Showcase featured four ALTC Grant project leaders (Helen Partridge, Sylvia Edwards, Robyn Nash and Mary Ryan) who had recently completed or were about to complete their grants. Each QUT faculty nominated two 2010 faculty teaching and learning grant recipients to showcase grant outcomes via a poster. Poster: Shannon Satherley & Abbe Winter Changing Relationships: Engaging Students and Staff in the Design Studio 'In the design studio learning environment, traditional student and staff expectations are of close contact teaching and learning. However, in recent years increasing class sizes have meant students experiencing reduced personal staff attention, and increasingly feeling “anonymous” and correspondingly disengaged, to the detriment of quality learning (Carbone 1998: 8; Biggs 2003). Concurrently, there has been a necessary increase in teaching by sessional (casual) teaching staff at QUT, with varied levels of experience and assurance. While teachers primarily regard engagement as “cognitive and conative,” for students it is emotional: “... an essential need to feel that they were engaged with the context of their learning and that it was meaningful in some way” (Solomonides and Martin 2008: 18). As a response to these conditions, the Changing Relationships action-research project was run within a QUT School of Design studio unit in 2009 and 2010, based on the premise that engaged teaching can encourage emotionally engaged learning. The project inverted the structure of the traditional QUT studio unit, empowering both students and sessional staff with a sense of increased autonomy: literally changing the relationships within the studio learning environment.'

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Parametric and generative modelling methods are ways in which computer models are made more flexible, and of formalising domain-specific knowledge. At present, no open standard exists for the interchange of parametric and generative information. The Industry Foundation Classes (IFC) which are an open standard for interoperability in building information models is presented as the base for an open standard in parametric modelling. The advantage of allowing parametric and generative representations are that the early design process can allow for more iteration and changes can be implemented quicker than with traditional models. This paper begins with a formal definition of what constitutes to be parametric and generative modelling methods and then proceeds to describe an open standard in which the interchange of components could be implemented. As an illustrative example of generative design, Frazer’s ‘Reptiles’ project from 1968 is reinterpreted.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background WSUD implementation in the Gold Coast City Council area commenced more than a decade ago. As a result, Council is expected to be in possession of WSUD assets valued at over tens of million dollars. The Gold Coast City Council is responsible for the maintenance and long-term management of these WSUD assets. Any shortcoming in implementation of best WSUD practices can potentially result in substantial liabilities and ineffective expenditure for the Council in addition to reduced efficiencies and outcomes. This highlights the importance of periodic auditing of WSUD implementation. Project scope The overall study entailed the following tasks: * A state-of-the-art literature review of the conceptual hydraulic and water quality treatment principles, current state of knowledge in relation to industry standards, best practice and identification of knowledge gaps in relation to maintenance and management practices and potential barriers to the implementation of WSUD. * Council stakeholder interviews to understand current practical issues in relation to the implementation of WSUD and the process of WSUD application from development application approval to asset management. * Field auditing of selected WSUD systems for condition assessment and identification of possible strengths and weaknesses in implementation. * Review of the Land Development Guidelines in order to identify any gaps and to propose recommendations for improvement. Conclusions Given below is a consolidated summary of the findings of the study undertaken. State-of-the-art literature review Though the conceptual framework for WSUD implementation is well established, the underlying theoretical knowledge underpinning the treatment processes and maintenance regimes and life cycle costing are still not well understood. Essentially, these are the recurring themes in the literature, namely, the inadequate understanding of treatment processes and lack of guidance to ensure specificity of maintenance regimes and life cycle costing of WSUDs. The fundamental barriers to successful WSUD implementation are: * Lack of knowledge transfer – This essentially relates to the lack of appropriate dissemination of research outcomes and the common absence of protocols for knowledge transfer within the same organisation. * Cultural barriers – These relate to social and institutional factors, including institutional inertia and the lack of clear understanding of the benefits. * Fragmented responsibilities – This results from poor administrative integration within local councils in relation to WSUDs. * Technical barriers – These relate to lack of knowledge on operational and maintenance practices which is compounded by model limitations and the lack of long-term quantitative performance evaluation data. * Lack of engineering standards – Despite the availability of numerous guidelines which are non-enforceable and can sometimes be confusing, there is a need for stringent engineering standards. The knowledge gaps in relation to WSUDs are only closing very slowly. Some of the common knowledge gaps identified in recent publications have been recognised almost a decade ago. The key knowledge gaps identified in the published literature are: * lack of knowledge on operational and maintenance practices; * lack of reliable methodology for identifying life cycle issues including costs; * lack of technical knowledge on system performance; * lack of guidance on retrofitting in existing developments. Based on the review of barriers to WSUD implementation and current knowledge gaps, the following were identified as core areas for further investigation: * performance evaluation of WSUD devices to enhance model development and to assess their viability in the context of environmental, economic and social drivers; establishing realistic life cycle costs to strengthen maintenance and asset management practices; * development of guidelines specific to retrofitting in view of the unique challenges posed by existing urban precincts together with guidance to ensure site specificity; establishment of a process for knowledge translation for enhancing currently available best practice guidelines; * identification of drivers and overcoming of barriers in the areas of institutional fragmentation, knowledge gaps and awareness of WSUD practices. GCCC stakeholder interviews Fourteen staff members involved in WSUD systems management in the Gold Coast City Council, representing four Directorates were interviewed using a standard questionnaire. The primary issues identified by the stakeholders were: * standardisation of WSUD terminology; * clear protocols for safeguarding devices during the construction phase; * engagement of all council stakeholders in the WSUD process from the initial phase; * limitations in the Land Development Guidelines; * ensuring public safety through design; * system siting to avoid conflicts with environmental and public use of open space; * provision of adequate access for maintenance; * integration of social and ecosystem issues to ensure long-term viability of systems in relation to both, vandalism and visual recreation; * lack of performance monitoring and inadequacy of the maintenance budget; * lack of technical training for staff involved in WSUD design approvals and maintenance; incentives for developers for acting responsibly in stormwater management. Field auditing of WSUD systems A representative cross section of WSUD systems in the Gold Coast were audited in the field. The following strengths and weaknesses in WSUD implementation were noted: * The implementation of WSUD systems in the field is not consistent. * The concerns raised by the stakeholders during the interviews in relation to WSUD implementation was validated from the observations from the field auditing, particularly in relation to the following: * safeguarding of devices during the construction phase * public safety * accessibility for maintenance * lack of performance monitoring by Council to assess system performance * inadequate maintenance of existing systems to suit site specific requirements. * A treatment train approach is not being consistently adopted. * Most of the systems audited have satisfactorily catered for public safety. Accessibility for maintenance has been satisfactorily catered for in most of the systems that were audited. * Systems are being commissioned prior to construction activities being substantially completed. * The hydraulic design of most systems appears to be satisfactory. * The design intent of the systems is not always clear. Review of Land Development Guidelines The Land Development Guidelines (TDG) was extensively reviewed and the following primary issues were noted in relation to WSUD implementation: * the LDG appears to have been prepared primarily to provide guidance to developers. It is not clear to what extent the guidelines are applicable to Council staff involved in WSUD maintenance and management; * Section 13 is very voluminous and appears to be a compilation of a series of individual documents resulting in difficulties in locating specific information, a lack of integration and duplication of information; * the LDG has been developed with a primary focus on new urban precinct development and the retrofitting of systems in existing developments has not been specifically discussed; * WSUDs are discussed in two different sections in the LDG and it is not clear which section takes precedence as there are inconsistencies between the two sections; there is inconsistent terminology being used; * there is a need for consolidation of information provided in different sections in the LDG; * there are inconsistencies in the design criteria provided; * there is a need for regular updating of the LDG to ensure that the information provided encompasses the state-of-the-art; * there is limited guidance provided for the preparation of maintenance plans and life cycle costing to assist developers in asset handover and to assist Council staff in assessment. * Based on these observations, eleven recommendations have been provided which are discussed below. Additionally, the stakeholder provided the following specific comments during the interviews in relation to the LDG: * lack of flexibility to cover the different stages of the life cycle of the systems; * no differentiation in projects undertaken by developers and Council; * inadequate information with regards to safety issues such as maximum standing water depth, fencing and safety barriers and public access; * lack of detailed design criteria in relation to Crime Prevention through Environmental Design, safety, amenity, environment, surrounding uses and impacts on surroundings; * inadequate information regarding maintenance requirements specific to the assessment and compliance phases; * recommendations for plantings are based primarily on landscape requirements rather than pollutant uptake capability. Recommendations With regards to the Land Development Guidelines, the following specific recommendations are provided: 1. the relevant sections and their extent of applicability to Council should be clearly identified; 2. integration of the different subsections within Section 13 and re-formatting the document for easy reference; 3. the maintenance guidelines provided in Section 13 should be translated to a maintenance manual for guidance of Council staff; 4. should consider extending the Guidelines to specifically encompass retrofitting of WSUD systems to existing urban precincts; 5. Section 3 needs to be revised to be made consistent with Section 13, to ensure priority for WSUD practices in urban precincts and to move away from conventional stormwater drainage design such as kerb and channelling; 6. it would also be good to specify as to which Section takes predominance in relation to stormwater drainage. It is expected that Section 13 would take predominance over the other sections in the LDG; 7. terminology needs to be made consistent to avoid confusion among developers and Council staff. Water Sensitive Urban Design is the term commonly used in Australia for stormwater quality treatment, rather than Stormwater Quality Improvement Devices. This once again underlines the need for ensuring consistency between Section 3 and Section 13; 8. it would also be good if there is a glossary of commonly used terms in relation to WSUD for use by all stakeholders and which should also be reflected in the LDG; 9. consolidation of all WSUD information into one section should be considered together with appropriate indicators in other LDG Sections regarding the availability of WSUD information. Ensuring consistency in the information provided is implied; 10. Section 13 should be updated at regular intervals to ensure the incorporation of the latest in research outcomes and incorporating criteria and guidance based on the state-of-the-art knowledge. The updating could be undertaken, say, in five year cycles. This would help to overcome the current lack of knowledge transfer; 11. the Council should consider commissioning specialised studies to extend the current knowledge base in relation to WSUD maintenance and life cycle costing. Additionally, Recommendation 10 is also applicable in this instance. The following additional recommendations are made based on the state-of-the-art literature review, stakeholder interviews and field auditing of WSUD systems: 1. Performance monitoring of existing systems to assess improvements to water quality, identify modifications and enhancements to improve performance; 2. Appropriate and monitored maintenance during different phases of development of built assets over time is needed to investigate the most appropriate time/phase of development to commission the final WSUD asset. 3. Undertake focussed investigations in the areas of WSUD maintenance and asset management in order to establish more realistic life cycle costs of systems and maintenance schedules; 4. the engagement of all relevant Council stakeholders from the initial stage of concept planning through to asset handover, and ongoing monitoring. This close engagement of internal stakeholders will assist in building a greater understanding of responsibilities and contribute to overcoming constraints imposed by fragmented responsibilities; 5. the undertaking of a public education program to inform the community of the benefits and ecosystem functions of WSUD systems; 6. technical training to impart state-of-the-art knowledge to staff involved in the approval of designs and maintenance and management of WSUD projects; 7. during the construction phase, it is important to ensure that appropriate measures to safeguard WSUD devices are implemented; 8. risks associated with potential public access to open water zones should be minimised with the application of appropriate safety measures; 9. system siting should ensure that potential conflicts are avoided with respect to public and ecosystem needs; 10. integration of social and ecosystem issues to ensure long-term viability of systems; provide incentives to developers who are proactive and responsible in the area of stormwater management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The design-build (DB) delivery system is an effective means of delivering a green construction project and selecting an appropriate contractor is critical to project success. Moreover, the delivery of green buildings requires specific design, construction and operation and maintenance considerations not generally encountered in the procurement of conventional buildings. Specifying clear sustainability requirements to potential contractors is particularly important in achieving sustainable project goals. However, many client/owners either do not explicitly specify sustainability requirements or do so in a prescriptive manner during the project procurement process. This paper investigates the current state-of-the-art procurement process used in specifying the sustainability requirements of the public sector in the USA construction market by means of a robust content analysis of 40 design-build requests for proposals (RFPs). The results of the content analysis indicate that the sustainability requirement is one of the most important dimensions in the best-value evaluation of DB contractors. Client/owners predominantly specify the LEED certification levels (e.g. LEED Certified, Silver, Gold, and Platinum) for a particular facility, and include the sustainability requirements as selection criteria (with specific importance weightings) for contractor evolution. Additionally, larger size projects tend to allocate higher importance weightings to sustainability requirements.This study provides public DB client/owners with a number of practical implications for selecting appropriate design-builders for sustainable DB projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper examines the role of actors in a participatory project, a case study of the glass-bead traditional craft industry in rural Indonesia. The project aimed to unite and empower rural craftspeople with regard to their unique potential. The problems of empowering rural craftspeople were complicated, due to the interrelated aspect of rural community life, cultural and educational backgrounds, as well as the local political situation. However, through a comprehensive understanding of the community prior to the project and by maintaining the communication, craftspeople were engaged actively in the project by promoting the craft industry to local buyers. The researcher, other facilitators and the community leader gave supportive roles at the middle and the end stage of the project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research is part of a major project with a stimulus that rose from the need to manage a large number of ageing bridges in low traffic volume roads (LTVR) in Australia. The project investigated, designed and consequently constructed, involved replacing an ageing super-structure of a 10m span bridge with a disused Flat-bed Rail Wagon (FRW). This research, therefore, is developed on the premises that the FRW can be adopted as the main structural system for the bridges in LTVR network. The main focus of this research is to present two alternate deck wearing systems (DWS) as part of the design of the FRW as road bridge deck conforming to AS5100 (2004). The bare FRW structural components were first examined for their adequacy (ultimate and serviceability) in resisting the critical loads specified in AS5100(2004). Two options of DWSs were evaluated and their effects on the FRW examined. The first option involved usage of timber DWS; the idea of this option was to use all the primary and secondary members of the FRW in load sharing and to provide additional members where weaknesses in the original members arose. The second option involved usage of reinforced concrete DWS with only the primary members of the FRW sharing the AS5100 (2004) loading. This option inherently minimised the risk associated with any uncertainty of the secondary members to their structural adequacy. This thesis reports the design phases of both options with conclusions of the selection of the ideal option for better structural performance, ease of construction and cost. The comparison carried out here focuses on the distribution of the traffic load by the FRW as a superstructure. Advantages and disadvantages highlighting cost comparisons and ease of constructability of the two systems are also included.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study aims to redefine spaces of learning to places of learning through the direct engagement of local communities as a way to examine and learn from real world issues in the city. This paper exemplifies Smart City Learning, where the key goal is to promote the generation and exchange of urban design ideas for the future development of South Bank, in Brisbane, Australia, informing the creation of new design policies responding to the needs of local citizens. Specific to this project was the implementation of urban informatics techniques and approaches to promote innovative engagement strategies. Architecture and Urban Design students were encouraged to review and appropriate real-time, ubiquitous technology, social media, and mobile devices that were used by urban residents to augment and mediate the physical and digital layers of urban infrastructures. Our study’s experience found that urban informatics provide an innovative opportunity to enrich students’ place of learning within the city.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM) Sundarbans Project’ (CRISP) to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB) funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The production of fashion garments has negative environmental and social impacts that can potentially be reduced through decisions made in the design process. This research explores to what extent Australian mass-market fashion designers consider environmental sustainability within product design. The study presents three case studies from different market levels, assembled through interviews with designers, along with an analysis of the Australian mass-market fashion industry. The project provides insights into the workings of the fashion design process within mid and high volume companies, and identifies opportunities and barriers for consideration of sustainability.