882 resultados para Ethical-political project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

SCAPE is an interactive simulation that allows teachers and students to experiment with sustainable urban design. The project is based on the Kelvin Grove Urban Village, Brisbane. Groups of students role play as political, retail, elderly, student, council and builder characters to negotiate on game decisions around land use, density, housing types and transport in order to design a sustainable urban community. As they do so, the 3D simulation reacts in real time to illustrate what the village would look like as well as provide statistical information about the community they are creating. SCAPE brings together education, urban professional and technology expertise, helping it achieve educational outcomes, reflect real-world scenarios and include sophisticated logic and decision making processes and effects.---------- The research methodology was primarily practice led underpinned by action research methods resulting in innovative approaches and techniques in adapting digital games and simulation technologies to create dynamic and engaging experiences in pedagogical contexts. It also illustrates the possibilities for urban designers to engage a variety of communities in the processes, complexities and possibilities of urban development and sustainability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The dream of a cosmopolitical utopia has been around for thousands of years. Yet the promise of being locally situated and at the same time globally connected and mobile has never seemed more possible than it is today. The question remains as to whether it is positive and realistic for us to have multiple loyalties. Can we sustain community and solidarity with our neighbours while we look beyond our nation? And if we can't - or won't – consider distant strangers as part of our own world, are there increasingly dire consequences? This book reconnects classical sociological theory and contemporary ideas on mobility, otherness, material assemblages, consumption and surveillance to render the idea of a global cosmopolitan utopia amenable to sociological investigation. The book takes a realistic approach to the development of cosmopolitical arrangements. It embraces the imaginative impulses the cosmopolitan dream provides, but takes into account the political, ethical and cultural dimensions of such cosmopolitan developments. In revisiting the relevance of classical sociological approaches in the context of contemporary theoretical challenges, the distinctive approach this book takes to understanding cosmopolitanism will be of use to scholars and students alike.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In October 2008, the Australian Learning and Teaching Council (ALTC) released the final report for the commissioned project ePortfolio use by university students in Australia: Informing excellence in policy and practice. The Australian ePortfolio Project represented the first attempt to examine the breadth and depth of ePortfolio practice in the Australian higher education sector. The research activities included surveys of stakeholder groups in learning and teaching, academic management and human resource management, with respondents representing all Australian universities; a series of focus groups and semi-structured interviews which sought to explore key issues in greater depth; and surveys designed to capture students’ pre-course expectations and their post-course experiences of ePortfolio learning. Further qualitative data was collected through interviews with ‘mature users’ of ePortfolios. Project findings revealed that, while there was a high level of interest in the use of ePortfolios in terms of the potential to help students become reflective learners who were conscious of their personal and professional strengths and weaknesses, the state of play in Australian universities was very fragmented. The project investigation identified four individual, yet interrelated, contexts where strategies may be employed to support and foster effective ePortfolio practice in higher education: government policy, technical standards, academic policy, and learning and teaching. Four scenarios for the future were also presented with the goal of stimulating discussion about opportunities for stakeholder engagement. It is argued that the effective use of ePortfolios requires open dialogue and collaboration between the different stakeholders across this range of contexts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article uses critical discourse analysis to analyse material shifts in the political economy of communications. It examines texts of major corporations to describe four key changes in political economy: (1) the separation of ownership from control; (2) the separation of business from industry; (3) the separation of accountability from responsibility; and (4) the subjugation of ‘going concerns’ by overriding concerns. The authors argue that this amounts to a political economic shift from traditional concepts of ‘capitalism’ to a new ‘corporatism’ in which the relationships between public and private, state and individual interests have become redefined and obscured through new discourse strategies. They conclude that the present financial and regulatory ‘crisis’ cannot be adequately resolved without a new analytic framework for examining the relationships between corporation, discourse and political economy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A study of Australian nurses on their use of information technology in the workplace was undertaken by the Australian Nursing Federation (ANF) in 2007. This study of over 4000 nurses highlighted that nurses recognise benefits to adopting more information technology in the workplace although there are significant barriers to their use. It also identified gross deficits in the capacity of the nursing workforce to engage in the digital processing of information. Following the release of the study last year, the ANF commenced work on a number of key recommendations from the report in order to overcome identified barriers and provide opportunities for nurses to better utilise information technology and information management systems. One of these recommendations was to seek research funding to develop national information technology and information management competency standards for nurses. This project has now received Federal Government funding to undertake this development. This project is being developed in collaboration with the ANF and the Queensland University of Technology. This paper will discuss the methodology, development and publication of the Australian Nursing Informatics Competency Standards Project which is currently underway and due for completion in May 2009. The Australian Nursing Informatics Competencies will be presented at the conference.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many studies in the area of project management and social networks have identified the significance of project knowledge transfer within and between projects. However, only few studies have examined the intra- and inter-projects knowledge transfer activities. Knowledge in projects can be transferred via face-to-face interactions on the one hand, and via IT-based tools on the other. Although companies have allocated many resources to the IT tools, it has been found that they are not always effectively utilised, and people prefer to look for knowledge using social face-to-face interactions. This paper explores how to effectively leverage two alternative knowledge transfer techniques, face-to-face and IT-based tools to facilitate knowledge transfer and enhance knowledge creation for intra- and inter-project knowledge transfer. The paper extends the previous research on the relationships between and within teams by examining the project’s external and internal knowledge networks concurrently. Social network qualitative analysis, using a case study within a small-medium enterprise, was used to examine the knowledge transfer activities within and between projects, and to investigate knowledge transfer techniques. This paper demonstrates the significance of overlapping employees working simultaneously on two or more projects and their impact on facilitating knowledge transfer between projects within a small/medium organisation. This research is also crucial to gaining better understanding of different knowledge transfer techniques used for intra- and inter-project knowledge exchange. The research provides recommendations on how to achieve better knowledge transfer within and between projects in order to fully utilise a project’s knowledge and achieve better project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aims: To describe a local data linkage project to match hospital data with the Australian Institute of Health and Welfare (AIHW) National Death Index (NDI) to assess longterm outcomes of intensive care unit patients. Methods: Data were obtained from hospital intensive care and cardiac surgery databases on all patients aged 18 years and over admitted to either of two intensive care units at a tertiary-referral hospital between 1 January 1994 and 31 December 2005. Date of death was obtained from the AIHW NDI by probabilistic software matching, in addition to manual checking through hospital databases and other sources. Survival was calculated from time of ICU admission, with a censoring date of 14 February 2007. Data for patients with multiple hospital admissions requiring intensive care were analysed only from the first admission. Summary and descriptive statistics were used for preliminary data analysis. Kaplan-Meier survival analysis was used to analyse factors determining long-term survival. Results: During the study period, 21 415 unique patients had 22 552 hospital admissions that included an ICU admission; 19 058 surgical procedures were performed with a total of 20 092 ICU admissions. There were 4936 deaths. Median follow-up was 6.2 years, totalling 134 203 patient years. The casemix was predominantly cardiac surgery (80%), followed by cardiac medical (6%), and other medical (4%). The unadjusted survival at 1, 5 and 10 years was 97%, 84% and 70%, respectively. The 1-year survival ranged from 97% for cardiac surgery to 36% for cardiac arrest. An APACHE II score was available for 16 877 patients. In those discharged alive from hospital, the 1, 5 and 10-year survival varied with discharge location. Conclusions: ICU-based linkage projects are feasible to determine long-term outcomes of ICU patients

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper builds on work I presented at the PESA conference in 2007, which moved through both aesthetic and ethical theory to generate a new theory of creative integrity around the issues of autonomy, agency and authenticity. This preliminary theorizing had its origins in my undergraduate ethics classroom where I was confronted with advertising students who resisted the idea of being taught ethics, along with all the philosophical ethical theories traditionally used to do this.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Hirst and Patching's second edition of Journalism Ethics: Arguments and Cases provides a fully updated exploration of the theory and practice of ethics in journalism. The authors situate modern ethical dilemmas in their social and historical context, which encourages students to think critically about ethics across the study and practice of journalism. Using a unique political economy approach, the text provides students with a theoretical and philosophical understanding of the major ethical dilemmas in journalism today. It commences with a newly recast discussion of theoretical frameworks, which explains the complex concepts of ethics in clear and comprehensive terms. It then examines the 'fault lines' in modern journalism, such as the constant conflict between the public service role of the media, and a journalist's commercial imperative to make a profit. All chapters have been updated with new examples, and many new cases demonstrating the book's theoretical underpinnings have been drawn from 'yesterday's headlines'. These familiar cases encourage student engagement and classroom discussion, and archived cases will still be available to students on an Online Resource Centre. Expanded coverage of the 'War on Terror', issues of deception within journalism, and infotainment and digital technology is included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.