955 resultados para Education, Cooperative


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents the method and results of a survey of 27 of the 33 Australian universities teaching engineering education in late 2007, undertaken by The Natural Edge Project (hosted by Griffith University and the Australian National University) and supported by the National Framework for Energy Efficiency. This survey aimed to ascertain the extent of energy efficiency (EE) education, and to identify preferred methods to assist in increasing the extent to which EE education is embedded in engineering curriculum. In this paper the context for the survey is supported by a summary of the key results from a variety of surveys undertaken over the last decade internationally. The paper concludes that EE education across universities and engineering disciplines in Australia is currently highly variable and ad hoc. Based on the results of the survey, this paper highlights a number of preferred options to support educators to embed sustainability within engineering programs, and future opportunities for monitoring EE, within the context of engineering education for sustainable development (EESD).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project management in the construction industry involves coordination of many tasks and individuals, affected by complexity and uncertainty, which increases the need for efficient cooperation. Procurement is crucial since it sets the basis for cooperation between clients and contractors. This is true whether the project is local, regional or global in scope. Traditionally, procurement procedures are competitive, resulting in conflicts, adversarial relationships and less desirable project results. The purpose of this paper is to propose and empirically test an alternative procurement model based on cooperative procurement procedures that facilitates cooperation between clients and contractors in construction projects. The model is based on four multi-item constructs – incentive-based compensation, limited bidding options, partner selection and cooperation. Based on a sample of 87 client organisations, the model was empirically tested and exhibited strong support, including content, nomological, convergent and discriminant validity, as well as reliability. Our findings indicate that partner selection based on task related attributes mediates the relationship between two important pre-selection processes (incentive-based compensation and limited bid invitation) and preferred outcome of cooperation. The contribution of the paper is identifying valid and reliable measurement constructs and confirming a unique sequential order for achieving cooperation. Moreover, the findings are applicable for many types of construction projects because of the similarities in the construction industry worldwide.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study is motivated by the need to look continually for ways to improve Griffith University's learning assistance services so that they meet the changed needs of stakeholders and are at the same time cost-effective and efficient. This study uses the conceptual tools of cultural-historical activity theory and expansive visibilisation to investigaate the developmenet and transformation of learning assistance services at Griffith University, one of Australia's largest mult-campus universities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In cloud computing, resource allocation and scheduling of multiple composite web services is an important and challenging problem. This is especially so in a hybrid cloud where there may be some low-cost resources available from private clouds and some high-cost resources from public clouds. Meeting this challenge involves two classical computational problems: one is assigning resources to each of the tasks in the composite web services; the other is scheduling the allocated resources when each resource may be used by multiple tasks at different points of time. In addition, Quality-of-Service (QoS) issues, such as execution time and running costs, must be considered in the resource allocation and scheduling problem. Here we present a Cooperative Coevolutionary Genetic Algorithm (CCGA) to solve the deadline-constrained resource allocation and scheduling problem for multiple composite web services. Experimental results show that our CCGA is both efficient and scalable.