868 resultados para Cost Over run
Resumo:
This article observes a paradox in the recent history of the Special Broadcasting Service. It is argued that, in contrast to the Australian Broadcasting Corporation, the role and general direction of SBS were not extensively debated as part of the ‘culture wars’ that occurred during the years of the Howard government. While that made SBS a less fraught space during that period, it may now be a factor in the comparative lack of support being given by the Rudd Labor government to SBS in comparison with the ABC, as some of the ‘special’ status of SBS has been blunted by its drift towards more mainstream programming and a mixed economy of commercial advertising, as well as government funding.
Resumo:
Furniture and appliance related injuries in children under 5 years of age accounts for an estimated 180 emergency presentations annually in Queensland. Injuries occur when children push or pull items over, climb and fall off furniture, or climb and tip the item over. Children under 2 years of age tend to injure themselves by pulling items over onto themselves Children over 2 years of age are more likely to be injured after climbing the item and either falling off or tipping the item over onto themselves. Tip over injuries (where the item falls over and injures the child) in children under 5 years of age account for an estimated 115 emergency presentations annually in Queensland. The item most commonly associated with a tip over injury is a television (with or without the cabinet) Prevention requires better design and selection of furniture with inherent stability coupled with mechanisms to install or fix less stable items
Resumo:
A commonly held belief in the IS discipline is that rigour and relevance are contrary to each other and that addressing both is virtually impossible. It is also believed widely that the editorial practices of our premier conferences and journals over-emphasise rigour on the cost of relevance. However, while these two topics have been filled with numerous subjective discussions, more solid evidence into the true relationship between rigour and relevance and the impact of conference editors on this relationship is still outstanding. This paper contributes to this debate by deriving empirical evidence from a comprehensive and detailed analysis of the characteristics of the submissions and the reviewing practices of three recent IS conferences. It provides first insights into the actual relationship between rigour and relevance and into the role conference chairs play in balancing rigour and relevance. Besides the outcomes that the current set of evaluation criteria does not provide a straight forward proxy for relevance to practitioners, the paper offers two main contributions. First, empirical insights are provided that rigour and relevance do in fact not have to be mutually exclusive. Second, the editorial practices at conferences are skewed towards rigorous papers rather than relevant papers.
Resumo:
Purpose Increased physical activity in colorectal cancer patients is related to improved recurrence free and overall survival. Psychological distress after cancer may place patients at risk of reduced physical activity; but paradoxically also act as a motivator for positive lifestyle change. The relationship between psychological distress and physical activity after cancer over time has not been described. Methods A prospective survey of 1966 (57% response) colorectal cancer survivors assessed the psychological distress variables of anxiety, depression, somatisation, cancer threat appraisal as predictors of physical activity five, 12, 24 and 36 months post-diagnosis 978 respondents had valid data for all time points. Results Higher somatisation was associated with greater physical inactivity (Relative risk ratio (RRR) =1.12; 95% CI=[1.1, 1.2]) and insufficient physical activity (RRR=1.05; [0.90, 1.0]). Respondents with a more positive appraisal of their cancer were significantly (p=0.031) less likely to be inactive (RRR=0.95; [0.90, 1.0]) or insufficiently active (RRR=0.96). Fatigued and obese respondents and current smokers were more inactive. Respondents whose somatisation increased between two time periods were less likely to increase their physical activity over the same period (p<0.001). Respondents with higher anxiety at one time period were less likely to have increased their activity at the next assessment (p=0.004). There was no association between depression and physical activity. Conclusions Cancer survivors who experience somatisation and anxiety are at greater risk of physical inactivity. The lack of a clear relationship between higher psychological distress and increasing physical activity argues against distress as a motivator to exercise in these patients.
Resumo:
The ability to forecast machinery failure is vital to reducing maintenance costs, operation downtime and safety hazards. Recent advances in condition monitoring technologies have given rise to a number of prognostic models for forecasting machinery health based on condition data. Although these models have aided the advancement of the discipline, they have made only a limited contribution to developing an effective machinery health prognostic system. The literature review indicates that there is not yet a prognostic model that directly models and fully utilises suspended condition histories (which are very common in practice since organisations rarely allow their assets to run to failure); that effectively integrates population characteristics into prognostics for longer-range prediction in a probabilistic sense; which deduces the non-linear relationship between measured condition data and actual asset health; and which involves minimal assumptions and requirements. This work presents a novel approach to addressing the above-mentioned challenges. The proposed model consists of a feed-forward neural network, the training targets of which are asset survival probabilities estimated using a variation of the Kaplan-Meier estimator and a degradation-based failure probability density estimator. The adapted Kaplan-Meier estimator is able to model the actual survival status of individual failed units and estimate the survival probability of individual suspended units. The degradation-based failure probability density estimator, on the other hand, extracts population characteristics and computes conditional reliability from available condition histories instead of from reliability data. The estimated survival probability and the relevant condition histories are respectively presented as “training target” and “training input” to the neural network. The trained network is capable of estimating the future survival curve of a unit when a series of condition indices are inputted. Although the concept proposed may be applied to the prognosis of various machine components, rolling element bearings were chosen as the research object because rolling element bearing failure is one of the foremost causes of machinery breakdowns. Computer simulated and industry case study data were used to compare the prognostic performance of the proposed model and four control models, namely: two feed-forward neural networks with the same training function and structure as the proposed model, but neglected suspended histories; a time series prediction recurrent neural network; and a traditional Weibull distribution model. The results support the assertion that the proposed model performs better than the other four models and that it produces adaptive prediction outputs with useful representation of survival probabilities. This work presents a compelling concept for non-parametric data-driven prognosis, and for utilising available asset condition information more fully and accurately. It demonstrates that machinery health can indeed be forecasted. The proposed prognostic technique, together with ongoing advances in sensors and data-fusion techniques, and increasingly comprehensive databases of asset condition data, holds the promise for increased asset availability, maintenance cost effectiveness, operational safety and – ultimately – organisation competitiveness.
Resumo:
Technological and societal change, along with organisational and market change (driven by contracting-out and privatisation), are “creating a new generation of infrastructures” [1]. While inter-organisational contractual arrangements can improve maintenance efficiency through consistent and repeatable patterns of action - unanticipated difficulties in implementation can reduce the performance of these arrangements. When faced with unsatisfactory performance of contracting-out arrangements, government organisations may choose to adapt and change these arrangements over time, with the aim of improving performance. This paper enhances our understanding of ‘next generation infrastructures’ by examining adaptation of the organisational arrangements for the maintenance of these assets, in a case study spanning 20 years.
Resumo:
This article considers the distinctive ways in which the Special Broadcasting Service (SBS) has evolved over its history since 1980, and how it has managed competing claims to being a multicultural yet broad-appeal broadcaster, and a comprehensive yet low-cost media service. It draws attention to the challenges presented by a global rethinking of the nature of citizenship and its relationship to media, for which SBS is well placed as a leader, and the challenges of online media for traditional public service media models, where SBS has arguably been a laggard, particularly when compared with the Australian Broadcasting Corporation (ABC). It notes recent work that has been undertaken by the author with others into user-created content strategies at SBS and how its online news and current affairs services have been evolving in recent years.
Resumo:
In today's fiercely competitive products market, product warranty has started playing an important role. The warranty period offered by the manufacturer/dealer has been progressively increasing since the beginning of the 20th Century. Currently, a large number of products are being sold with long-term warranty policies in the form of extended warranty, warranty for used products, service contracts and lifetime warranty policies. Lifetime warranties are relatively a new concept. The modelling of failures during the warranty period and the costs for such policies are complex since the lifespan in these policies are not defined well and it is often difficult to tell about life measures for the longer period of coverage due to usage pattern/maintenance activities undertaken and uncertainties of costs over the period. This paper focuses on defining lifetime, developing lifetime warranty policies and models for predicting failures and estimating costs for lifetime warranty policies.
Resumo:
Background: Reducing rates of healthcare acquired infection has been identified by the Australian Commission on Safety and Quality in Health Care as a national priority. One of the goals is the prevention of central venous catheter-related bloodstream infection (CR-BSI). At least 3,500 cases of CR-BSI occur annually in Australian hospitals, resulting in unnecessary deaths and costs to the healthcare system between $25.7 and $95.3 million. Two approaches to preventing these infections have been proposed: use of antimicrobial catheters (A-CVCs); or a catheter care and management ‘bundle’. Given finite healthcare budgets, decisions about the optimal infection control policy require consideration of the effectiveness and value for money of each approach. Objectives: The aim of this research is to use a rational economic framework to inform efficient infection control policy relating to the prevention of CR-BSI in the intensive care unit. It addresses three questions relating to decision-making in this area: 1. Is additional investment in activities aimed at preventing CR-BSI an efficient use of healthcare resources? 2. What is the optimal infection control strategy from amongst the two major approaches that have been proposed to prevent CR-BSI? 3. What uncertainty is there in this decision and can a research agenda to improve decision-making in this area be identified? Methods: A decision analytic model-based economic evaluation was undertaken to identify an efficient approach to preventing CR-BSI in Queensland Health intensive care units. A Markov model was developed in conjunction with a panel of clinical experts which described the epidemiology and prognosis of CR-BSI. The model was parameterised using data systematically identified from the published literature and extracted from routine databases. The quality of data used in the model and its validity to clinical experts and sensitivity to modelling assumptions was assessed. Two separate economic evaluations were conducted. The first evaluation compared all commercially available A-CVCs alongside uncoated catheters to identify which was cost-effective for routine use. The uncertainty in this decision was estimated along with the value of collecting further information to inform the decision. The second evaluation compared the use of A-CVCs to a catheter care bundle. We were unable to estimate the cost of the bundle because it is unclear what the full resource requirements are for its implementation, and what the value of these would be in an Australian context. As such we undertook a threshold analysis to identify the cost and effectiveness thresholds at which a hypothetical bundle would dominate the use of A-CVCs under various clinical scenarios. Results: In the first evaluation of A-CVCs, the findings from the baseline analysis, in which uncertainty is not considered, show that the use of any of the four A-CVCs will result in health gains accompanied by cost-savings. The MR catheters dominate the baseline analysis generating 1.64 QALYs and cost-savings of $130,289 per 1.000 catheters. With uncertainty, and based on current information, the MR catheters remain the optimal decision and return the highest average net monetary benefits ($948 per catheter) relative to all other catheter types. This conclusion was robust to all scenarios tested, however, the probability of error in this conclusion is high, 62% in the baseline scenario. Using a value of $40,000 per QALY, the expected value of perfect information associated with this decision is $7.3 million. An analysis of the expected value of perfect information for individual parameters suggests that it may be worthwhile for future research to focus on providing better estimates of the mortality attributable to CR-BSI and the effectiveness of both SPC and CH/SSD (int/ext) catheters. In the second evaluation of the catheter care bundle relative to A-CVCs, the results which do not consider uncertainty indicate that a bundle must achieve a relative risk of CR-BSI of at least 0.45 to be cost-effective relative to MR catheters. If the bundle can reduce rates of infection from 2.5% to effectively zero, it is cost-effective relative to MR catheters if national implementation costs are less than $2.6 million ($56,610 per ICU). If the bundle can achieve a relative risk of 0.34 (comparable to that reported in the literature) it is cost-effective, relative to MR catheters, if costs over an 18 month period are below $613,795 nationally ($13,343 per ICU). Once uncertainty in the decision is considered, the cost threshold for the bundle increases to $2.2 million. Therefore, if each of the 46 Level III ICUs could implement an 18 month catheter care bundle for less than $47,826 each, this approach would be cost effective relative to A-CVCs. However, the uncertainty is substantial and the probability of error in concluding that the bundle is the cost-effective approach at a cost of $2.2 million is 89%. Conclusions: This work highlights that infection control to prevent CR-BSI is an efficient use of healthcare resources in the Australian context. If there is no further investment in infection control, an opportunity cost is incurred, which is the potential for a more efficient healthcare system. Minocycline/rifampicin catheters are the optimal choice of antimicrobial catheter for routine use in Australian Level III ICUs, however, if a catheter care bundle implemented in Australia was as effective as those used in the large studies in the United States it would be preferred over the catheters if it was able to be implemented for less than $47,826 per Level III ICU. Uncertainty is very high in this decision and arises from multiple sources. There are likely greater costs to this uncertainty for A-CVCs, which may carry hidden costs, than there are for a catheter care bundle, which is more likely to provide indirect benefits to clinical practice and patient safety. Research into the mortality attributable to CR-BSI, the effectiveness of SPC and CH/SSD (int/ext) catheters and the cost and effectiveness of a catheter care bundle in Australia should be prioritised to reduce uncertainty in this decision. This thesis provides the economic evidence to inform one area of infection control, but there are many other infection control decisions for which information about the cost-effectiveness of competing interventions does not exist. This work highlights some of the challenges and benefits to generating and using economic evidence for infection control decision-making and provides support for commissioning more research into the cost-effectiveness of infection control.
Resumo:
A Split System Approach (SSA) based methodology is presented to assist in making optimal Preventive Maintenance decisions for serial production lines. The methodology treats a production line as a complex series system with multiple PM actions over multiple intervals. Both risk related cost and maintenance related cost are factored into the methodology as either deterministic or random variables. This SSA based methodology enables Asset Management (AM) decisions to be optimized considering a variety of factors including failure probability, failure cost, maintenance cost, PM performance, and the type of PM strategy. The application of this new methodology and an evaluation of the effects of these factors on PM decisions are demonstrated using an example. The results of this work show that the performance of a PM strategy can be measured by its Total Expected Cost Index (TECI). The optimal PM interval is dependent on TECI, PM performance and types of PM strategies. These factors are interrelated. Generally it was found that a trade-off between reliability and the number of PM actions needs to be made so that one can minimize Total Expected Cost (TEC) for asset maintenance.
Resumo:
Sustainable development is about making societal investments. These investments should be in synchronization with the natural environment, trends of social development, as well as organisational and local economies over a long time span. Traditionally in the eyes of clients, project development will need to produce the required profit margins, with some degrees of consideration for other impacts. This is being changed as all citizens of our society are becoming more aware of concepts and challenges such as the climate change, greenhouse footprints, and social dimensions of sustainability, and will in turn demand answers to these issues in built facilities. A large number of R&D projects have focused on the technical advancement and environmental assessment of products and built facilities. It is equally important address the cost/benefit issue, as developers in the world would not want to loose money by investing in built assets. For infrastructure projects, due to its significant cost of development and lengthy delivery time, presenting the full money story of going green is of vital importance. Traditional views of life-cycle costing tend to focus on the pure economics of a construction project. Sustainability concepts are not broadly integrated with the current LCCA in the construction sector. To rectify this problem, this paper reports on the progress to date of developing and extending contemporary LCCA models in the evaluation of road infrastructure sustainability. The suggested new model development is based on sustainability indicators identified through previous research, and incorporating industry verified cost elements of sustainability measures. The on-going project aims to design and a working model for sustainability life-cycle costing analysis for this type of infrastructure projects.