929 resultados para System reliability index


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reliability is a key aspect in power system design and planning. Maintaining a reliable power system is a very important issue for their design and operation. Under the new competitive framework of the electricity sector, power systems find ever more and more strained to operate near their limits. Under this new scenario, it is crucial for the system operator to use tools that facilitate an energy dispatch that minimizes possible power cuts. This paper presents a mathematical model to calculate an energy dispatch that considers security constraints (single contingencies in transmission lines and transformers). The model involves pool markets and fixed bilateral contracts. Traditional methodologies that include security constraints are usually based in multistage dispatch processes. In this case, we propose a single-stage model that avoids the economic inefficiencies which result when conventional multi-stage dispatch approaches are applied. The proposed model includes an AC representation of the transport system and allows calculating the cost overruns incurred in due to reliability restrictions. We found that complying with fixed bilateral contracts, when they go above certain levels, might lead to congestion problems in transmission lines.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Unbalance and harmonics are two major distortions in the three-phase distribution systems. In this paper an investigation into unbalance phenomena in the distribution networks using instantaneous space vector theory, is presented. Power oscillation index (POI) and effective power factor (PFe) are calculated in the network nodes for several unbalance loading conditions. For system analysis a general power flow algorithm for three-phase four-wire radial distribution networks, based on backward-forward technique, is applied. Results obtained from several case studies using medium and low voltage test feeder with unbalanced load, are presented and discussed. © 2010 Praise Worthy Prize S.r.l. - All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Due to growing urbanization and industrialization, the environment is suffering from pollution of rivers, degradation of soils and deteriorated air quality. Quality indices appear to be useful to evaluate the conditions of these media. The aim of this study was the development of a water quality index using a fuzzy inference system, since such an approach has proved advantageous in addressing problems that are subjective by nature or for which the data are uncertain. The methodology employed was based on this inference system, and considered the nine water quality parameters employed by CETESB (Companhia de Tecnologia de Saneamento Ambiental, São Paulo, Brazil) to evaluate water quality. After assessment of the data using the index, a comparison was made with the WQI (Water Quality Index), which is used for the monitoring of various water bodies, including in the study region. The results obtained using the index developed on the basis of fuzzy inference were found to be more useful than those derived from the method currently used by CETESB, since losses and/or omissions concerning individual parameters were minimized. © 2010 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article shows an analysis of the electrical parameters of a three-phase transmission line section using a relatively new design for steel towers characterized by 280 meters high. These main features, the height of the line conductors and distance between them, are intrinsically related to the longitudinal and transversal parameters of the line. By this means, an analysis was carried out in order to show the electrical variations between a transmission line using the new technology and a conventional 440-kV line through a wide range of frequencies and a variable soil resistivity. © 2012 The Institution of Engineering and Technology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Low birth weight (LBW), defined as birth weight less than 2500 g, has a complex etiology and may be a result of premature interruption of pregnancy or intrauterine growth restriction. The objective of this study was to provide information on determinants of LBW and contribute to the understanding of the problem in Brazil. Methods. A case-control study was conducted in Botucatu city, SP state, Brazil. The study population consisted of 2 groups with 860 newborns in each group as follows: low weight newborns (LWNB) and a control group (weight ≤ 2500 g). Secondary data from 2004 to 2008 were collected using the Live Birth Certificate (LBC) and records from medical charts of pregnant women in Basic Health Units (BHU) and in the Public University Hospital (UH). Variables were as follows: maternal socio-demographic characteristics, pregnancy and birth conditions including quality of prenatal care according to 3 criteria. They were based on parameters established by the Ministry of Health (MH), one of them, the modified Kessner Index. The multivariable analysis by logistic regression was used to evaluate the association between variables and LBW. Results: According to the analysis, the factors associated with LBW were as follows: prematurity (OR = 56.98, 95% CI 29.52-109.95), twin pregnancy (OR = 20.00, 95% CI 6.25-100.00), maternal smoking (OR = 2.12, 95% CI 1.33-3.45), maternal malnourishment (OR = 2.30, 95% CI 1.08-5.00), maternal obesity (OR = 2.30, 95% IC 1.18-4.48), weight gain during pregnancy less than 5 kg (OR = 2.63, 95% CI 1.35-5.00) and weight gain during pregnancy more than 15 kg (OR = 2.26, 95% CI 1.16-4.41). Adequacy of prenatal care visits adjusted to gestational age was less frequent in the LBW group than in the control group (68.7% vs. 80.5%, x 2 p < 0.001). According to the modified Kessner Index, 64.4% of prenatal visits in the LWNB group were adequate. Conclusion: LWNB are a quite heterogeneous group of infants concerning their determinants and prevention actions against LBW and the follow-up of these infants have also been very complex. Therefore, improvement in the quality of care provided should be given priority through concrete actions for prevention of LBW. © 2012 Fonseca et al; licensee BioMed Central Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a power system capacity expansion planning modelconsidering carbon emissions constraints. In addition to the traditionaltechnical and economical issues usually considered in the planning process, two environmental policies that consist on the taxation and the annual limitsof carbon dioxide (CO 2) emissions are considered. Furthermore, the gradualretirement of old inefficient generation plants has been included. The approachguarantees a cleaner electricity production in the expanded power system ata relatively low cost. The proposed model considers the transmission systemand is applied to a 4-region and 11-region power systems over a 20-yearplanning horizon. Results show practical investment decisions in terms of sustainability and costs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The real-time monitoring of events in an industrial plant is vital, to monitor the actual conditions of operation of the machinery responsible for the manufacturing process. A predictive maintenance program includes condition monitoring of the rotating machinery, to anticipate possible conditions of failure. To increase the operational reliability it is thus necessary an efficient tool to analyze and monitor the equipments, in real-time, and enabling the detection of e.g. incipient faults in bearings. To fulfill these requirements some innovations have become frequent, namely the inclusion of vibration sensors or stator current sensors. These innovations enable the development of new design methodologies that take into account the ease of future modifications, upgrades, and replacement of the monitored machine, as well as expansion of the monitoring system. This paper presents the development, implementation and testing of an instrument for vibration monitoring, as a possible solution to embed in industrial environment. The digital control system is based on an FPGA, and its configuration with an open hardware design tool is described. Special focus is given to the area of fault detection in rolling bearings. © 2012 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In trickle irrigation systems, the design is based on the pre-established emission uniformity (EU) which is the combined result of the equipment characteristics and its hydraulic configuration. However, this desired value of the EU may not be confirmed by the final project (in field conditions) and neither by the yield uniformity. The hypotheses of this research were: a) the EU of a trickle irrigation system at field conditions is equal to the emission uniformity pre-established in the its design; b) EU has always the lowest value when compared with other indicators of uniformity; c) the discharge variation coefficient (VC) is not equal to production variation coefficient in the operational unit; d) the difference between the discharge variation coefficient and the productivity variation coefficient depends on the water depth applied. This study aimed to evaluate the relationship between EU used in the irrigation system design and the final yield uniformity. The uniformity indicators evaluated were: EU, distribution uniformity (UD) and the index proposed by Barragan & Wu (2005). They were compared estimating the performance of a trickle irrigation system applied in a citrus orchard with dimensions of 400m x 600m. The design of the irrigation system was optimized by a Linear Programming model. The tree rows were leveled in the larger direction and the spacing adopted in the orchard was 7m x 4m. The manifold line was always operating on a slope condition. The sensitivity analysis involved different slopes, 0, 3, 6, 9 and 12%, and different values of emission uniformity, 60, 70, 75, 80, 85, 90 and 94%. The citrus yield uniformity was evaluated by the variation coefficient. The emission uniformity (EU) after design differed from the EU pre-established, more sharply in the initial values lower than 90%. Comparing the uniformity indexes, the EU always generated lower values when compared with the UD and with the index proposed by Barragan. The emitter variation coefficient was always lower than the productivity variation coefficient. To obtain uniformity of production, it is necessary to consider the irrigation system uniformity and mainly the water depth to be applied.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective: Biological and mechanical implant-abutment connection complications and failures are still present in clinical practice, frequently compromising oral function. The purpose of this study was to evaluate the reliability and failure modes of anterior single-unit restorations in internal conical interface (ICI) implants using step-stress accelerated life testing (SSALT). Materials and methods: Forty-two ICI implants were distributed in two groups (n = 21 each): group AT-OsseoSpeed™ TX (Astra Tech, Waltham, MA, USA); group SV-Duocon System Line, Morse Taper (Signo Vinces Ltda., Campo Largo, PR, Brazil). The corresponding abutments were screwed to the implants and standardized maxillary central incisor metal crowns were cemented and subjected to SSALT in water. Use-level probability Weibull curves and reliability for a mission of 50,000 cycles at 200 N were calculated. Differences between groups were assessed by Kruskal-Wallis along with Bonferroni's post-hoc tests. Polarized-light and scanning electron microscopes were used for failure analyses. Results: The Beta (β) value derived from use level probability Weibull calculation was 1.62 (1.01-2.58) for group AT and 2.56 (1.76-3.74) for group SV, indicating that fatigue was an accelerating factor for failure of both groups. The reliability for group AT was 0.95 and for group SV was 0.88. Kruskal-Wallis along with Bonferroni's post-hoc tests showed no significant difference between the groups tested (P > 0.27). In all specimens of both groups, the chief failure mode was abutment fracture at the conical joint region and screw fracture at neck's region. Conclusions: Reliability was not different between investigated ICI connections supporting maxillary incisor crowns. Failure modes were similar. © 2012 John Wiley & Sons A/S.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

ABSTRACT Background: Patients with dementia may be unable to describe their symptoms, and caregivers frequently suffer emotional burden that can interfere with judgment of the patient's behavior. The Neuropsychiatric Inventory-Clinician rating scale (NPI-C) was therefore developed as a comprehensive and versatile instrument to assess and accurately measure neuropsychiatric symptoms (NPS) in dementia, thereby using information from caregiver and patient interviews, and any other relevant available data. The present study is a follow-up to the original, cross-national NPI-C validation, evaluating the reliability and concurrent validity of the NPI-C in quantifying psychopathological symptoms in dementia in a large Brazilian cohort. Methods: Two blinded raters evaluated 312 participants (156 patient-knowledgeable informant dyads) using the NPI-C for a total of 624 observations in five Brazilian centers. Inter-rater reliability was determined through intraclass correlation coefficients for the NPI-C domains and the traditional NPI. Convergent validity included correlations of specific domains of the NPI-C with the Brief Psychiatric Rating Scale (BPRS), the Cohen-Mansfield Agitation Index (CMAI), the Cornell Scale for Depression in Dementia (CSDD), and the Apathy Inventory (AI). Results: Inter-rater reliability was strong for all NPI-C domains. There were high correlations between NPI-C/delusions and BPRS, NPI-C/apathy-indifference with the AI, NPI-C/depression-dysphoria with the CSDD, NPI-C/agitation with the CMAI, and NPI-C/aggression with the CMAI. There was moderate correlation between the NPI-C/aberrant vocalizations and CMAI and the NPI-C/hallucinations with the BPRS. Conclusion: The NPI-C is a comprehensive tool that provides accurate measurement of NPS in dementia with high concurrent validity and inter-rater reliability in the Brazilian setting. In addition to universal assessment, the NPI-C can be completed by individual domains. © International Psychogeriatric Association 2013.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives: To investigate the test-retest reliability of mechanical parameters derived from a 3-min isokinetic all-out test, performed at 60 and 100 rpm. Reliability and validity of the peak oxygen uptake derived from 3-min isokinetic all-out test were also tested. Design: 14 healthy male subjects completed an incremental ramp testing and four randomized 3-min isokinetic all-out test (two at 60 rpm and two at 100 rpm). Methods: The absolute and relative reliability of the following parameters were analyzed: peak power, mean power, end power, fatigue index, work performed above end power and peak oxygen uptake. Results: No difference was found between each two sets of data, although there were between-cadence differences for peak power, mean power, end power, and fatigue index. Higher intra-class correlation (ICC) and lower coefficient of variation (CV) were found for end power (ICC = 0.91 and 0.95; CV = 5.6 and 5.7%) and mean power (ICC = 0.97 and 0.98; CV = 2.4 and 3.1%), than for peak power (ICC = 0.81 and 0.84; CV = 8.7 and 10%) and work performed above end power (ICC = 0.79 and 0.84; CV = 7.9 and 10.6%; values reported for 60 rpm and 100 rpm, respectively). High reliability scores were also observed for peak oxygen uptake at both cadences (60 rpm, CV = 3.2%; 100 rpm, CV = 2.3%,) with no difference with the incremental ramp testing peak oxygen uptake. Conclusions: The power profile and peak oxygen uptake of a 3-min isokinetic all-out test are both highly reliable, whether the test is performed at 60 or 100 rpm. Besides, peak oxygen uptake and work performed above end power were not affected by the change in cadence while peak power, mean power, end power, and fatigue index were. © 2013.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A importância do monitoramento ambiental é medida pelos vários casos de derramamentos de óleo ocorridos no mundo durante as últimas três décadas. Isto tem incentivado as empresas e órgãos do governo envolvidos na prevenção e combate a estes acidentes a aperfeiçoarem cada vez mais os métodos, tanto preventivos como corretivos, para a minimização dos danos gerados por acidentes com derramamento de óleo. Este trabalho objetiva contextualizar de forma histórica como os acidentes com derramamento de óleo propiciaram o desenvolvimento de pesquisa tecnológica a partir de parcerias entre empresas de petróleo, agências de governo, universidades e institutos de pesquisa no Brasil, em especial na zona costeira Amazônica. Como resultado, índices de sensibilidade ambiental ao derramamento de óleo (ISA) foram definidos especialmente para a Amazônia costeira, onde processos fluviais e marinhos se encontram na foz do maior rio do mundo, o rio Amazonas. Perspectivas de pesquisa e respostas de emergência a acidentes são apresentadas, a fim de se conservar a diversidade socioambiental da mais importante região tropical do planeta.