986 resultados para LINE-UP
Resumo:
Mestrado em Auditoria
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica
Resumo:
The scientific evidence supporting the management of the chronically ill in a positive psychological perspective in opposition to traditional pathological approach is scarce. This study examines issues associated with recovery of health status in heart failure, in particular hope, affection, and happiness. We use a longitudinal study of 128 symptomatic patients who after medical intervention reported improved quality of life and function at 3-month follow-up. We evaluated the contribution of happiness, hope and affection, individually and as a whole, in the quality of life and functionality of individuals with heart failure. Happiness (Subjective Happiness Scale), Hope (HOPE Scale), and affection (PANAS (positive and negative affect schedule)) were determined before medical intervention. Individually, we found that happiness is correlated with the quality of life and functionality, hope to self-efficacy dimension of the quality of life scale, positive affect to functionality and negative affect with symptoms dimension, quality of life dimension, and overall sum of the quality of life scale. Overall, we found that happiness has a unique contribution to the quality of life, except in self-efficacy dimension where hope takes this contribution and positive affect has a unique contribution to the functionality in this short-term follow-up. The results highlight the importance of positive variables to health outcomes for people with heart failure and should be considered in intervention programs for this syndrome.
Resumo:
Este trabalho teve o intuito de criar uma linha de montagem universal através da qual será dada formação aos atuais operadores e a novos que possam vir a pertencer ao departamento de montagem na empresa Grohe Portugal. Para tal era necessário saber realizar um estudo de métodos e um estudo de tempos sobre os vários processos existentes no departamento de montagem. Com esse intuito foi elaborada uma pesquisa sobre as referidas temáticas, onde ficou evidente a sua importância e a sua imprescindibilidade. Inicialmente houve também um acompanhamento das montagens dos produtos nas várias linhas, de forma a adquirir conhecimento sobre as características dos processos de montagem existentes no departamento. Os pontos mais importantes durante o estudo de métodos e tempos realizado foram a definição de toda a estrutura do processo, das ferramentas e materiais a utilizar, não esquecendo a relação entre o operador e as suas ferramentas e a medição de tempos de todas as tarefas necessárias para cada processo de montagem. A linha de montagem, cujo projeto se desenvolveu, é composta por três bancadas e consiste num conjunto de postos de trabalho onde são executadas as operações através de máquinas, do trabalho humano, ou da sua conjugação, dispostos numa determinada sequência, sendo alguns deles amovíveis. Para a realização e conclusão deste projeto foram superadas diversas etapas, sendo que as mais relevantes foram: a análise dos processos de montagem; estudo de tempos de todas as famílias de produtos a serem implementados na linha de formação; - Definição da estrutura da linha de montagem; - Definição das rampas e dos tubos de abastecimento da linha; - Desenho da linha de montagem em 3D no software SolidWorks. Paralelamente foram também desenvolvidos estudos de tempos sobre alguns produtos com o intuito de serem implementadas melhorias, ou apenas para o controlo de tempos necessários para a realização das operações Por último, foi também elaborada uma recolha de ferramentas existentes no departamento de montagem para serem elaborados manuais de instruções das ferramentas fabricadas internamente, com o objetivo de obter a certificação OSHAS 180001 e de criar documentos com a listagem de materiais necessários para cada produto.
Resumo:
Com este artigo, pretende-se dar conta da reflexão resultante da experiência de ensino da sociologia na Escola Superior de Tecnologia da Saúde de Lisboa, nos últimos 12 anos. Após um breve enquadramento do contexto em que decorre esta experiência e da sua especificidade, procuram identificar-se os principais constrangimentos e questões que se foram colocando durante a prática lectiva das disciplinas de sociologia, relacionados com obstáculos epistemológicos e dificuldades referentes à articulação entre a mobilização de uma linguagem necessariamente compreensível para os estudantes e o imperativo de apresentação rigorosa dos temas propostos bem como com às vantagens e potenciais riscos da introdução de componentes de investigação. Por outro lado, abordam-se os objectivos e analisa-se o contributo do ensino da sociologia para a formação de técnicos de saúde, considerando a variabilidade do alcance das aprendizagens realizadas pelos (ex)estudantes.
Resumo:
The current models are not simple enough to allow a quick estimation of the remediation time. This work reports the development of an easy and relatively rapid procedure for the forecasting of the remediation time using vapour extraction. Sandy soils contaminated with cyclohexane and prepared with different water contents were studied. The remediation times estimated through the mathematical fitting of experimental results were compared with those of real soils. The main objectives were: (i) to predict, through a simple mathematical fitting, the remediation time of soils with water contents different from those used in the experiments; (ii) to analyse the influence of soil water content on the: (ii1) remediation time; (ii2) remediation efficiency; and (ii3) distribution of contaminants in the different phases present into the soil matrix after the remediation process. For sandy soils with negligible contents of clay and natural organic matter, artificially contaminated with cyclohexane before vapour extraction, it was concluded that (i) if the soil water content belonged to the range considered in the experiments with the prepared soils, then the remediation time of real soils of similar characteristics could be successfully predicted, with relative differences not higher than 10%, through a simple mathematical fitting of experimental results; (ii) increasing soil water content from 0% to 6% had the following consequences: (ii1) increased remediation time (1.8–4.9 h, respectively); (ii2) decreased remediation efficiency (99–97%, respectively); and (ii3) decreased the amount of contaminant adsorbed onto the soil and in the non-aqueous liquid phase, thus increasing the amount of contaminant in the aqueous and gaseous phases.
Resumo:
This work reports a relatively rapid procedure for the forecasting of the remediation time (RT) of sandy soils contaminated with cyclohexane using vapour extraction. The RT estimated through the mathematical fitting of experimental results was compared with that of real soils. The main objectives were: (i) to predict the RT of soils with natural organic matter (NOM) and water contents different from those used in experiments; and (ii) to analyse the time and efficiency of remediation, and the distribution of contaminants into the soil matrix after the remediation process, according to the soil contents of: (ii1) NOM; and (ii2) water. For sandy soils with negligible clay contents, artificially contaminated with cyclohexane before vapour extraction, it was concluded that: (i) if the NOM and water contents belonged to the range of the prepared soils, the RT of real soils could be predicted with relative differences not higher than 12%; (ii1) the increase of NOM content from 0% to 7.5% increased the RT (1.8–13 h) and decreased the remediation efficiency (RE) (99–90%) and (ii2) the increase of soil water content from 0% to 6% increased the RT (1.8–4.9 h) and decreased the RE (99–97%). NOM increases the monolayer capacity leading to a higher sorption into the solid phase. Increasing of soil water content reduces the mass transfer coefficient between phases. Concluding, NOM and water contents influence negatively the remediation process, turning it less efficient and more time consuming, and consequently more expensive.
Resumo:
A flow injection analysis (FIA) system having a chlormequat selective electrode is proposed. Several electrodes with poly(vinyl chloride) based membranes were constructed for this purpose. Comparative characterization suggestedthe use of membrane with chlormequat tetraphenylborate and dibutylphthalate. On a single-line FIA set-up, operating with 1x10-2 mol L-1 ionic strength and 6.3 pH, calibration curves presented slopes of 53.6±0.4mV decade-1 within 5.0x10-6 and1.0x10-3 mol L-1, andsquaredcorrelation coefficients >0.9953. The detection limit was 2.2x10-6 mol L-1 and the repeatability equal to ±0.68mV (0.7%). A dual-channel FIA manifold was therefore constructed, enabling automatic attainment of previous ionic strength andpH conditions and thus eliminating sample preparation steps. Slopes of 45.5±0.2mV decade -1 along a concentration range of 8.0x10-6 to 1.0x10-3 mol L-1 with a repeatability ±0.4mV (0.69%) were obtained. Analyses of real samples were performed, and recovery gave results ranging from 96.6 to 101.1%.
Resumo:
Soil vapor extraction (SVE) and bioremediation (BR) are two of the most common soil remediation technologies. Their application is widespread; however, both present limitations, namely related to the efficiencies of SVE on organic soils and to the remediation times of some BR processes. This work aimed to study the combination of these two technologies in order to verify the achievement of the legal clean-up goals in soil remediation projects involving seven different simulated soils separately contaminated with toluene and xylene. The remediations consisted of the application of SVE followed by biostimulation. The results show that the combination of these two technologies is effective and manages to achieve the clean-up goals imposed by the Spanish Legislation. Under the experimental conditions used in this work, SVE is sufficient for the remediation of soils, contaminated separately with toluene and xylene, with organic matter contents (OMC) below 4 %. In soils with higher OMC, the use of BR, as a complementary technology, and when the concentration of contaminant in the gas phase of the soil reaches values near 1 mg/L, allows the achievement of the clean-up goals. The OMC was a key parameter because it hindered SVE due to adsorption phenomena but enhanced the BR process because it acted as a microorganism and nutrient source.
Resumo:
Several Web-based on-line judges or on-line programming trainers have been developed in order to allow students to train their programming skills. However, their pedagogical functionalities in the learning of programming have not been clearly defined. EduJudge is a project which aims to integrate the “UVA On-line Judge”, an existing on-line programming trainer with an important number of problems and users, into an effective educational environment consisting of the e-learning platform Moodle and the competitive learning tool QUESTOURnament. The result is the EduJudge system which allows teachers to apply different pedagogical approaches using a proven e-learning platform, makes problems easy to search through an effective search engine, and provides an automated evaluation of the solutions submitted to these problems. The final objective is to provide new learning strategies to motivate students and present programming as an easy and attractive challenge. EduJudge has been tried and tested in three algorithms and programming courses in three different Engineering degrees. The students’ motivation and satisfaction levels were analysed alongside the effects of the EduJudge system on students’ academic outcomes. Results indicate that both students and teachers found that among other multiple benefits the EduJudge system facilitates the learning process. Furthermore, the experi- ment also showed an improvement in students’ academic outcomes. It must be noted that the students’ level of satisfaction did not depend on their computer skills or their gender.
Resumo:
Mestrado em Tecnologia de Diagnóstico e Intervenção Cardiovascular - Ramo de especialização: Ultrassonografia Cardiovascular
Resumo:
Although power-line communication (PLC) is not a new technology, its use to support communication with timing requirements is still the focus of ongoing research. Recently, a new infrastructure was presented, intended for communication using power lines from a central location to geographically dispersed nodes using inexpensive devices. This new infrastructure uses a two-level hierarchical power-line system, together with an IP-based network. Within this infrastructure, in order to provide end-toend communication through the two levels of the powerline system, it is necessary to fully understand the behaviour of the underlying network layers. The masterslave behaviour of the PLC MAC, together with the inherent dynamic topology of power-line networks are important issues that must be fully characterised. Therefore, in this paper we present a simulation model which is being used to study and characterise the behaviour of power-line communication.
Resumo:
This paper describes the communication stack of the REMPLI system: a structure using power-lines and IPbased networks for communication, for data acquisition and control of energy distribution and consumption. It is furthermore prepared to use alternative communication media like GSM or analog modem connections. The REMPLI system provides communication service for existing applications, namely automated meter reading, energy billing and domotic applications. The communication stack, consisting of physical, network, transport, and application layer is described as well as the communication services provided by the system. We show how the peculiarities of the power-line communication influence the design of the communication stack, by introducing requirements to efficiently use the limited bandwidth, optimize traffic and implement fair use of the communication medium for the extensive communication partners.
Resumo:
Consider the problem of scheduling a set of sporadic tasks on a multiprocessor system to meet deadlines using a task-splitting scheduling algorithm. Task-splitting (also called semi-partitioning) scheduling algorithms assign most tasks to just one processor but a few tasks are assigned to two or more processors, and they are dispatched in a way that ensures that a task never executes on two or more processors simultaneously. A particular type of task-splitting algorithms, called slot-based task-splitting dispatching, is of particular interest because of its ability to schedule tasks with high processor utilizations. Unfortunately, no slot-based task-splitting algorithm has been implemented in a real operating system so far. In this paper we discuss and propose some modifications to the slot-based task-splitting algorithm driven by implementation concerns, and we report the first implementation of this family of algorithms in a real operating system running Linux kernel version 2.6.34. We have also conducted an extensive range of experiments on a 4-core multicore desktop PC running task-sets with utilizations of up to 88%. The results show that the behavior of our implementation is in line with the theoretical framework behind it.
Resumo:
Relatório Final de Estágio apresentado à Escola Superior de Dança, com vista à obtenção do grau de Mestre em Ensino de Dança.