987 resultados para Diagnostic Process


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertation presented to obtain the Ph.D degree in Chemistry

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Doutor em Engenharia Informática

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Engenharia Química e Bioquímica

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The EM3E Master is an Education Programme supported by the European Commission, the European Membrane Society (EMS), the European Membrane House (EMH), and a large international network of industrial companies, research centers and universities

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Some epidemiological characteristics of head lice, Pediculus capitis, were studied using two procedures: cut hair analysis and head inspection. Higher prevalence rates were observed in the middle and at the end of the school terms. Both procedures indicated that children were the main reservoir for this type of pediculosis in Uberlândia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trypanosoma cruzi infection is often not detected early on or actively diagnosed, partly because most infected individuals are either asymptomatic or oligosymptomatic. Moreover, in most places, neither blood banks nor healthcare units offer diagnostic confirmation or treatment access. By the time patients present clinical manifestations of advanced chronic Chagas disease, specific treatment with current drugs usually has limited effectiveness. Better-quality serological assays are urgently needed, especially rapid diagnostic tests for diagnosis patients in both acute and chronic phases, as well as for confirming that a parasitological cure has been achieved. Some new antigen combinations look promising and it is important to assess which ones are potentially the best, together with their requirements in terms of investigation and development. In August 2007, a group of specialized researchers and healthcare professionals met to discuss the state of Chagas infection diagnosis and to build a consensus for a plan of action to develop efficient, affordable, accessible and easy-to-use diagnostic tests for Chagas disease. This technical report presents the conclusions from that meeting.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the last decade, human embryonic stem cells (hESCs) have garnered a lot of attention owing to their inherent self-renewal ability and pluripotency. These characteristics have opened opportunities for potential stem cell-based regenerative medicines, for development of drug discovery platforms and as unique in vitro models for the study of early human development.(...)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Requirements Engineering has been acknowledged an essential discipline for Software Quality. Poorly-defined processes for eliciting, analyzing, specifying and validating requirements can lead to unclear issues or misunderstandings on business needs and project’s scope. These typically result in customers’ non-satisfaction with either the products’ quality or the increase of the project’s budget and duration. Maturity models allow an organization to measure the quality of its processes and improve them according to an evolutionary path based on levels. The Capability Maturity Model Integration (CMMI) addresses the aforementioned Requirements Engineering issues. CMMI defines a set of best practices for process improvement that are divided into several process areas. Requirements Management and Requirements Development are the process areas concerned with Requirements Engineering maturity. Altran Portugal is a consulting company concerned with the quality of its software. In 2012, the Solution Center department has developed and applied successfully a set of processes aligned with CMMI-DEV v1.3, what granted them a Level 2 maturity certification. For 2015, they defined an organizational goal of addressing CMMI-DEV maturity level 3. This MSc dissertation is part of this organization effort. In particular, it is concerned with the required process areas that address the activities of Requirements Engineering. Our main goal is to contribute for the development of Altran’s internal engineering processes to conform to the guidelines of the Requirements Development process area. Throughout this dissertation, we started with an evaluation method based on CMMI and conducted a compliance assessment of Altran’s current processes. This allowed demonstrating their alignment with the CMMI Requirements Management process area and to highlight the improvements needed to conform to the Requirements Development process area. Based on the study of alternative solutions for the gaps found, we proposed a new Requirements Management and Development process that was later validated using three different approaches. The main contribution of this dissertation is the new process developed for Altran Portugal. However, given that studies on these topics are not abundant in the literature, we also expect to contribute with useful evidences to the existing body of knowledge with a survey on CMMI and requirements engineering trends. Most importantly, we hope that the implementation of the proposed processes’ improvements will minimize the risks of mishandled requirements, increasing Altran’s performance and taking them one step further to the desired maturity level.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Desde a aprovação do plano de saúde mental regional em Itália ... o Departamento Local de Saúde Mental e Perturbações aditivas em Bolonha, tem desenvolvido um projeto de reforma cujo objectivo é inovar o sistema de saúde mental local. ...ABSTRACT: Since the Regional mental health plan 2009-2011 was approved in Italy the Department of Mental Health and addictions of the Bologna local health trust developed as a laboratory aimed at innovating the mental health systen locally. ...