818 resultados para Construction management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Technical complications in implant prosthetic cases represent a major challenge in dentistry. This case report describes minimally invasive management to recover an implant with a fractured remnant of a zirconia abutment, including provisional rehabilitation during a sequential treatment protocol in the esthetic zone. A patient was treated with a screw-retained one-piece implant-supported reconstruction made of a customized zirconia abutment with direct ceramic veneering in the maxillary right central incisor position. During the prosthetic try-in, a fracture in the apical portion of the abutment was evident. The first rescue attempt led to fracture of the retrieval instrument. Immediately, an individualized wired construction was applied to bond the existing fractured reconstruction to the neighboring teeth to maintain the peri-implant mucosal architecture. Because the implant screw canal was blocked, a customized round bur had to be manufactured and was placed in the implant axis with a specific bracket tool from the service set to protect the interior implant threads. Then, the drills of the service set were guided by the newly created access to remove the fractured remnants. The implant screw was retapped and the area rinsed with chlorhexidine solution. All remnants were removed without the need for surgical intervention. Neither the implant connection nor the bone-to-implant interface was damaged. The stepwise treatment approach with the customized round bur combined with the system-specific drills of the service set saved the blocked implant so that the patient could be successfully rehabilitated with a new implant reconstruction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is presented in CIB: Management and Innovation Sustainable Built Environment 2011, as the study and analysis of the residential model of a rural area from the Iberian Peninsula, specifically applied to the case of the province of Cáceres, in the autonomous region of Extremadura, in Spain. To this end, from a database made up of building projects whose real costs are known, it is intended to establish the links of the different parameters studied through the corresponding functions of statistical analysis. One of the main objectives of this process is constituted by the possibility of establishing those design variables of higher economic importance, so as to keep an economic control of these parameters, generally geometrical and typological, from the very start of the project. And, in general, a higher optimization of resources in the construction of dwellings in the rural environment from their design is intended.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La crisis afecta a todos los sectores, es un terremoto en cadena que se inicio en el sector inmobiliario y se ha ido introduciendo en el resto. Todo esto ha dado lugar a una caída brusca de la demanda de los servicios relacionados con la construcción, con un posicionamiento en “espera” de los Promotores e Inversores, que aún tienen liquidez para invertir, buscando oportunidades que lógicamente se tienen que producir en un entorno escasamente fiable como el actual. Aquellos Inversores que vean oportunidades, se aseguraran de que los productos que van a realizar, tengan una demanda suficiente, sus costes estén en consonancia con el mercado, pero sin que aquello perjudique al resultado final, es decir manteniendo la calidad propuesta al inicio del proceso con los costes previstos, dando lugar a un control exhaustivo del producto a realizar, lo cual obligará a una gran profesionalidad por parte de los agentes implicados. Para todo esto habrá que contar con Empresas especializadas, que aporten garantías en este proceso y aseguren tanto al promotor como al Inversor en todo momento donde y en que se invierten sus recursos. La Dirección Integrada de Proyecto (“Project Management “) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. Bien, pues nos encontramos con que en esta situación actual, los recursos no solo están limitados, si no que son limitados, por lo que un control y un exhaustivo seguimiento de los mismos se convierte no solo en importante si no en fundamental.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The art of construction is a risky activity that directly affects the life and physical integrity of persons. Since the approval of Law 31/1995, of November 8, Prevention of Occupational Risks was the first legislation that established the current basis in all sectors and then transposed into Spanish law Directive 92/57/CEE called Royal Decree 1627/1997 of October 24, on minimum safety and health dispositions in construction works, measures have been proposed to develop a mixed body of scientific literature composed of researchers and professionals in the field of occupational safety and health, but even today there is still no clear and firm proposal, showing a lack of awareness in the occupational risk prevention and, therefore, a consolidation of the culture of prevention in society. Therefore, the technicians, who make up the building process, can incur in very high responsibilities, such as: Author of the project, Coordinator of Safety and Health during the preparation of the project and during the execution of works, Site Management: Site Manager. This involves the immediate creation of a general training in prevention for all architects starting when still studying, as well as specific training, appropriate and complementary to all the architects that will be devoted to the specialty of occupational safety and health in construction works. That is, first, we must make the responsible bodies aware of the urgent need to integrate risk prevention in the curricula of architecture and later in the continuing education of the profession. It is necessary that our teaching must conform to the laws on safety and health, due to the fact that the law recognizes our academic degrees and professional qualifications to perform functions in that area

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Software Product Line Engineering (SPLE) has proved to have significant advantages in family-based software development, but also implies the up¬front design of a product-line architecture (PLA) from which individual product applications can be engineered. The big upfront design associated with PLAs is in conflict with the current need of "being open to change". However, the turbulence of the current business climate makes change inevitable in order to stay competitive, and requires PLAs to be open to change even late in the development. The trend of "being open to change" is manifested in the Agile Software Development (ASD) paradigm, but it is spreading to the domain of SPLE. To reduce the big upfront design of PLAs as currently practiced in SPLE, new paradigms are being created, one being Agile Product Line Engineering (APLE). APLE aims to make the development of product-lines more flexible and adaptable to changes as promoted in ASD. To put APLE into practice it is necessary to make mechanisms available to assist and guide the agile construction and evolution of PLAs while complying with the "be open to change" agile principle. This thesis defines a process for "the agile construction and evolution of product-line architectures", which we refer to as Agile Product-Line Archi-tecting (APLA). The APLA process provides agile architects with a set of models for describing, documenting and tracing PLAs, as well as an algorithm to analyze change impact. Both the models and the change impact analysis offer the following capabilities: Flexibility & adaptability at the time of defining software architectures, enabling change during the incremental and iterative design of PLAs (anticipated or planned changes) and their evolution (unanticipated or unforeseen changes). Assistance in checking architectural integrity through change impact analysis in terms of architectural concerns, such as dependencies on earlier design decisions, rationale, constraints, and risks, etc.Guidance in the change decision-making process through change im¬pact analysis in terms of architectural components and connections. Therefore, APLA provides the mechanisms required to construct and evolve PLAs that can easily be refined iteration after iteration during the APLE development process. These mechanisms are provided in a modeling frame¬work called FPLA. The contributions of this thesis have been validated through the conduction of a project regarding a metering management system in electrical power networks. This case study took place in an i-smart software factory and was in collaboration with the Technical University of Madrid and Indra Software Labs. La Ingeniería de Líneas de Producto Software (Software Product Line Engi¬neering, SPLE) ha demostrado tener ventajas significativas en el desarrollo de software basado en familias de productos. SPLE es un paradigma que se basa en la reutilización sistemática de un conjunto de características comunes que comparten los productos de un mismo dominio o familia, y la personalización masiva a través de una variabilidad bien definida que diferencia unos productos de otros. Este tipo de desarrollo requiere el diseño inicial de una arquitectura de línea de productos (Product-Line Architecture, PLA) a partir de la cual los productos individuales de la familia son diseñados e implementados. La inversión inicial que hay que realizar en el diseño de PLAs entra en conflicto con la necesidad actual de estar continuamente "abierto al cam¬bio", siendo este cambio cada vez más frecuente y radical en la industria software. Para ser competitivos es inevitable adaptarse al cambio, incluso en las últimas etapas del desarrollo de productos software. Esta tendencia se manifiesta de forma especial en el paradigma de Desarrollo Ágil de Software (Agile Software Development, ASD) y se está extendiendo también al ámbito de SPLE. Con el objetivo de reducir la inversión inicial en el diseño de PLAs en la manera en que se plantea en SPLE, en los último años han surgido nuevos enfoques como la Ingeniera de Líneas de Producto Software Ágiles (Agile Product Line Engineering, APLE). APLE propone el desarrollo de líneas de producto de forma más flexible y adaptable a los cambios, iterativa e incremental. Para ello, es necesario disponer de mecanismos que ayuden y guíen a los arquitectos de líneas de producto en el diseño y evolución ágil de PLAs, mientras se cumple con el principio ágil de estar abierto al cambio. Esta tesis define un proceso para la "construcción y evolución ágil de las arquitecturas de lineas de producto software". A este proceso se le ha denominado Agile Product-Line Architecting (APLA). El proceso APLA proporciona a los arquitectos software un conjunto de modelos para de¬scribir, documentar y trazar PLAs, así como un algoritmo para analizar vel impacto del cambio. Los modelos y el análisis del impacto del cambio ofrecen: Flexibilidad y adaptabilidad a la hora de definir las arquitecturas software, facilitando el cambio durante el diseño incremental e iterativo de PLAs (cambios esperados o previstos) y su evolución (cambios no previstos). Asistencia en la verificación de la integridad arquitectónica mediante el análisis de impacto de los cambios en términos de dependencias entre decisiones de diseño, justificación de las decisiones de diseño, limitaciones, riesgos, etc. Orientación en la toma de decisiones derivadas del cambio mediante el análisis de impacto de los cambios en términos de componentes y conexiones. De esta manera, APLA se presenta como una solución para la construcción y evolución de PLAs de forma que puedan ser fácilmente refinadas iteración tras iteración de un ciclo de vida de líneas de producto ágiles. Dicha solución se ha implementado en una herramienta llamada FPLA (Flexible Product-Line Architecture) y ha sido validada mediante su aplicación en un proyecto de desarrollo de un sistema de gestión de medición en redes de energía eléctrica. Dicho proyecto ha sido desarrollado en una fábrica de software global en colaboración con la Universidad Politécnica de Madrid e Indra Software Labs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Teamwork, is one of the abilities that today is highly valued in the professional arena with a great importance for various personal and interpersonal skills associated with it. In this context, the Technical University of Madrid, is developing a coordinated educational innovation project, which main objective is to develop methodological and assessment tools for the acquisition of personal skills necessary to improve the employability of graduates and their skills for project management. Within this context, this paper proposes a methodology composed of various activities and indicators, as well as specific assessment instruments linked to the teamwork competence. Through a series of systematic steps it was allowed the design of an instrument and construction of a scale for measuring the competence of teamwork. The practical application of the methodology has been carried out in Projects lectures from different Schools of Engineering at the Technical University of Madrid, which results are presented in this document as a pilot experience. Results show the various aspects and methods that teachers should consider in evaluating the competence of the work, including analysis of the quality of results, through reliability and construct validity. On the other hand, show the advantages of applying this methodology in the field of project management teaching.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The figure of the coordinator in health and safety issues in the construction sector first appeared in our legislation through the incorporation of the European Directives (in our case Royal Decree 1627/97 on the minimum health and safety regulations in construction works), and is viewed differently in different countries of the European Union regarding the way they are hired and their role in the construction industry. Coordinating health and safety issues is also a management process that requires certain competencies that are not only based on technical or professional training, but which, taking account of the work environment, require the use of strategies and tools that are related to experience and personal skills. Through a piece of research that took account of expert opinions in the matter, we have found which competencies need to be possessed by the health and safety coordinator in order to improve the safety in the works they are coordinating. The conclusions of the analyses performed using the appropriate statistical methods (comparing means and multivariate analysis techniques), will enable training programmes to be designed and ensure that the health and safety coordinators selected have the competencies required to carry out their duties.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The figure of the coordinator in health and safety issues in the construction sector first appeared in our legislation through the incorporation of the European Directives (in our case Royal Decree 1627/97 on the minimum health and safety regulations in construction works), and is viewed differently in different countries of the European Union regarding the way they are hired and their role in the construction industry. Coordinating health and safety issues is also a management process that requires certain competencies that are not only based on technical or professional training, but which, taking account of the work environment, require the use of strategies and tools that are related to experience and personal skills. Through a piece of research that took account of expert opinions in the matter, we have found which competencies need to be possessed by the health and safety coordinator in order to improve the safety in the works they are coordinating. The conclusions of the analyses performed using the appropriate statistical methods (comparing means and multivariate analysis techniques), will enable training programmes to be designed and ensure that the health and safety coordinators selected have the competencies required to carry out their duties.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is no empirical evidence whatsoever to support most of the beliefs on which software construction is based. We do not yet know the adequacy, limits, qualities, costs and risks of the technologies used to develop software. Experimentation helps to check and convert beliefs and opinions into facts. This research is concerned with the replication area. Replication is a key component for gathering empirical evidence on software development that can be used in industry to build better software more efficiently. Replication has not been an easy thing to do in software engineering (SE) because the experimental paradigm applied to software development is still immature. Nowadays, a replication is executed mostly using a traditional replication package. But traditional replication packages do not appear, for some reason, to have been as effective as expected for transferring information among researchers in SE experimentation. The trouble spot appears to be the replication setup, caused by version management problems with materials, instruments, documents, etc. This has proved to be an obstacle to obtaining enough details about the experiment to be able to reproduce it as exactly as possible. We address the problem of information exchange among experimenters by developing a schema to characterize replications. We will adapt configuration management and product line ideas to support the experimentation process. This will enable researchers to make systematic decisions based on explicit knowledge rather than assumptions about replications. This research will output a replication support web environment. This environment will not only archive but also manage experimental materials flexibly enough to allow both similar and differentiated replications with massive experimental data storage. The platform should be accessible to several research groups working together on the same families of experiments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Within the last century the interest in wind-induced loads over civil engineering structures has become more and more important, the reason being that the development of new construction techniques and materials has allowed engineers and architects to design new structures far from the traditional concepts, and in many cases wind actions over these singular structures are not included in the existing codes of practice. In this paper the windinduced static loads over bridges constructed by the double cantilever method during erection stages are considered. The aerodynamic load over a double cantilever bridge under a yawing-angled wind produces a yawing (torsional) moment on the bridge deck, which can lead to undesirable rotation of the deck about the supporting pier. The effects of the wind yaw angle and the length of the deck are analysed. The wind action caused by the presence of sliding concrete forms at the ends of the deck is also studied.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Abstract The Tower of Martín González, also known as castle of La Raya, is placed in the actual border between the Spanish provinces of Soria and Zaragoza and in the historical limit between the Crowns of Castile and Aragon: this is the reason for its name. The castle dominates the hedge of the plain-moors that surround the Valley of Nágima River. It is a castle with courtyard and a high tower in the western flank. The paper analyzes the castle in four main levels. All references about the castle are studied to draw a historical narration and to relate with the territory and other fortifications, both Castilian and Aragonese. Despite its advanced state of ruin, it preserves many rests that allow making an analysis of its defensive elements and constructive aspects. Resumen La torre de Martín González, también conocida como el castillo de La Raya, se sitúa en el límite actual entre las provincias de Soria y Zaragoza y en el límite histórico entre las coronas de Castilla y Aragón. Domina el extremo de los páramos que circundan el río Nágima. Es un castillo de tipo torrejón con patio de armas y una torre del homenaje adosada a su flanco occidental. El análisis contempla cuatro niveles fundamentales para el entendimiento de la arquitectura fortificada. La comunicación revisa la documentación existente sobre los elementos históricos que se ponen en relación, mediante el análisis territorial, con el sistema fortificado de frontera. A pesar de su avanzado estado de ruina, conserva restos que permiten realizar una lectura interpretativa de sus elementos defensivos y de sus aspectos constructivos.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Este proyecto consiste en la construcción de un prototipo para la gestión de proyectos, destinada a usuarios del entorno profesional. La herramienta pretende servir de soporte a los equipos que realicen un proyecto dotando al usuario con la posibilidad de gestionar los tiempos del proyecto, gestión de requisitos, gestión de recursos, gestión de la documentación, etc. Adicionalmente, este trabajo llevará asociado un plan de negocio para poder estudiar la viabilidad del proyecto, en este plan de negocio se analizará; el entorno externo (competencia); análisis de las debilidades, fortalezas, amenazas y oportunidades; plan de marketing; plan económicofinanciero; análisis de riesgos del proyecto. A grandes rasgos, la herramienta desarrollada se compone de dos bases de datos (una relacional y otra no relacional), un conjunto de módulos que implementan la funcionalidad y una interfaz gráfica que proporciona a los usuarios una forma cómoda de interactuar con el sistema, principalmente ofrecerá las siguientes opciones:  Gestión de proyectos  Gestión de usuarios.  Gestión de recursos  Gestión de tiempos  Cuadro de mando y notificaciones. ---ABSTRACT---This Project consist of the construction of a prototype for Project management, intended for users of the profesional environment. The software aims to support teams conducting a project by providing the user with the ability to manage time, requirements management, resource management, document management, etc. In addition, this work includes a business plan to study the viability of the project. This business plan addresses the following; analysis of the external enviroment; analysis of the strengths, weaknesses, opportunities and threats; marketing plan; economic and financial plan; analysis of project risks. In general terms, the developed tools are composed of two databases (relational and nonrelational), a set of modules that implement the functionality and a web interface that gives users a convenient way to interact with the system. The options that the system offers are:  Project management  User management  Resource management  Time management  Dashboard and notifications

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Current EU Directives force the Member States to assure by 2020 that 70% of the Construction and Demolition (C&D) waste is recovered instead of landfilled. While some countries have largely achieved this target, others still have a long way to go. For better understanding the differences arising from local disparities, six factors related to technical, economic, legislative and environmental aspects have been identified as crucial influences in the market share of C&D waste recycling solutions. These factors are able to identify the causes that limit the recycling rate of a certain region. Moreover, progress towards an efficient waste management can vary through the improvement of a single factor. This study provides the background for further fine-tuning the factors and their combination into a mathematical model for assessing the market share of C&D recycling solutions.