996 resultados para dam construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The absorptive capacity of organisations is one of the key drivers of innovation performance in any industry. This research seeks to refine our understanding of the relationship between absorptive capacity and innovation performance, with a focus on characterising the absorptive capacity of the different participant groups within the Australian road industry supply chain. One of the largest and most comprehensive surveys ever undertaken of innovation in road construction was completed in 2011 by the Queensland University of Technology (QUT), based on the Australian road industry. The survey of over 200 construction industry participants covered four sectors, comprising suppliers (manufacturers and distributors), consultants (engineering consultants), contractors (head and subcontractors) and clients (state government road agencies). The survey measured the absorptive capacity and innovation activity exhibited by organisations within each of these participant groups, using the perceived importance of addressing innovation obstacles as a proxy for innovation activity. One of the key findings of the survey is about the impact of participant competency on product innovation activity. The survey found that the absorptive capacity of industry participants had a significant and positive relationship with innovation activity. Regarding the distribution of absorptive capacity, the results indicate that suppliers are more likely to have high levels of absorptive capacity than the other participant groups, with 32% of suppliers showing high absorptive capacity, ahead of contractors (18%), consultants (11%), and clients (7%). These results support the findings of previous studies in the literature and suggest the importance of policies to enhance organisational learning, particularly in relation to openness to new product ideas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We study a version of the Keller–Segel model for bacterial chemotaxis, for which exact travelling wave solutions are explicitly known in the zero attractant diffusion limit. Using geometric singular perturbation theory, we construct travelling wave solutions in the small diffusion case that converge to these exact solutions in the singular limit.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concept of the lifelong learner—the idea that people should be active learners throughout the lifespan—has since the 1990s gained importance in public policy. Governments in relatively wealthy countries have made the argument that the economic future of nations is tied to the ongoing participation of citizens in learning opportunities that will assist them to participate fully in society and increase their chances of employment in changing workforce conditions. More recently, policy attention has focused on the other end of the lifespan, the first years of life. With the early years now recognised as crucial for later educational success, policy attention has also focused on the importance of parenting in the early years. In the UK and Australia, for example, the effects of state interventions to facilitate ‘good parenting’ and pre-school children’s ‘readiness’ for formal schooling have been felt in a range of settings including community health services, the home and the pre-school (Gillies, 2005; Nichols & Jurvansuu, 2008; Millei & Lee, 2007; Vincent, Ball & Braun, 2010). In Australia, government policy has explicitly proposed a model of parenting as a learning process, and has urged people to cultivate their identities as learners in order to carry out their responsibilities as parents. In part the policy objectives have been to support parents to ensure that all children get a healthy and successful start to life...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The internationalisation process of firms has attracted much research interest since the 1970s. It is noted, however, that a significant research gap exists in studies with a primary focus on the pre-internationalisation behaviour of firms. This paper proposes the incorporation of a pre-internationalisation phase into the traditional Uppsala model of firm internationalisation to address the issue of export readiness. Through extensive literature review, the concepts fundamental to the ability of an Uppsala type firm to begin internationalisation through an export entry mode are identified: exposure to stimuli factors, attitudinal commitment of decision makers towards exporting, the firm’s resource capabilities, as well as the moderating effect of lateral rigidity. The concept of export readiness is operationalised in this study through the construction of an export readiness index (ERI) using exploratory and confirmatory factor analysis. The index is then applied to some representative cases and tested using logistic regression to establish its validity as a diagnostic tool. The proposed ERI presents not only a more practical approach towards analysing firms’ export readiness but has also major public policy implications as a possible tool for government export promotion agencies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this paper is to describe a new decomposition construction for perfect secret sharing schemes with graph access structures. The previous decomposition construction proposed by Stinson is a recursive method that uses small secret sharing schemes as building blocks in the construction of larger schemes. When the Stinson method is applied to the graph access structures, the number of such “small” schemes is typically exponential in the number of the participants, resulting in an exponential algorithm. Our method has the same flavor as the Stinson decomposition construction; however, the linear programming problem involved in the construction is formulated in such a way that the number of “small” schemes is polynomial in the size of the participants, which in turn gives rise to a polynomial time construction. We also show that if we apply the Stinson construction to the “small” schemes arising from our new construction, both have the same information rate.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry has long been burdened with inherent adversarial relationships among the parties and the resulting disputes. Dispute review boards (DRBs) have emerged as alternatives to settle construction-related disputes outside courts. Although DRBs have found support in some quarters of the construction industry, the quantitative assessment of the impact of DRBs has not been adequately addressed. This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large-scale highway agency. Three dimensions of DRB impact were assessed: (1) influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10-year period (2000–2009). Quantitative measures of performance were developed and analyzed for each category. Projects that used DRBs faced reduced costs and schedule growth (6.88 and 12.92%, respectively) when compared to non-DRB projects (11.53 and 28.96%). DRBs were also found to be effective in avoiding and settling disputes; the number of arbitration cases reduced consistently after DRB implementation, and DRBs have a success rate of 97% in settling disputes for which DRBs were used. Moreover, costs of DRBs were found to comprise a relatively small fraction (i.e., approximately 0.3%) of total project budgets. It was concluded that DRBs were effective dispute prevention and resolution alternatives with no significant adverse effects on project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The complex supply chain relations of the construction industry, coupled with the substantial amount of information to be shared on a regular basis between the parties involved, make the traditional paper-based data interchange methods inefficient, error prone and expensive. The successful information technology (IT) applications that enable seamless data interchange, such as the Electronic Data Interchange (EDI) systems, have generally failed to be successfully implemented in the construction industry. An alternative emerging technology, Extensible Markup Language (XML), and its applicability to streamline business processes and to improve data interchange methods within the construction industry are analysed, as is the EDI technology to identify the strategic advantages that XML technology provides to overcome the barriers to implementation. In addition, the successful implementation of XML-based automated data interchange platforms for a large organization, and the proposed benefits thereof, are presented as a case study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Temporary Traffic Control Plans (TCP’s), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer’s original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As the biggest expo site in history, construction of the Shanghai Expo site faced a lot of challenges, including involvement of lots of investors, megaconstruction scale, concurrent construction mode, involvement of more than 40,000 migrant workers, and extremely tight completion deadlines, among others. Consequently, these challenges imposed great obstacles on accomplishing the safety, quality, and environmental goals. Through a case study of the Shanghai Expo construction, this paper paper presents the design and implementation of multicriteria incentives in megaprojects to accomplish the safety, quality, and environmental goals. Both quantitative and qualitative findings were triangulated to demonstrate the outcome of the incentives. Six critical success factors (CSFs) for the incentives, rule design, process orientation, top management support, training and promotion, communication in process, and process learning and improvement are identified and validated through case study data and content analysis. It is believed that the findings of this paper can enhance understanding of multicriteria incentive schemes in general and provide insights in implementing these incentive schemes in future megaprojects, particularly in the People’s Republic of China (PRC).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this research was to develop a model to estimate future freeway pavement construction costs in Henan Province, China. A comprehensive set of factors contributing to the cost of freeway pavement construction were included in the model formulation. These factors comprehensively reflect the characteristics of region and topography and altitude variation, the cost of labour, material, and equipment, and time-related variables such as index numbers of labour prices, material prices and equipment prices. An Artificial Neural Network model using the Back-Propagation learning algorithm was developed to estimate the cost of freeway pavement construction. A total of 88 valid freeway cases were obtained from freeway construction projects let by the Henan Transportation Department during the period 1994−2007. Data from a random selection of 81 freeway cases were used to train the Neural Network model and the remaining data were used to test the performance of the Neural Network model. The tested model was used to predict freeway pavement construction costs in 2010 based on predictions of input values. In addition, this paper provides a suggested correction for the prediction of the value for the future freeway pavement construction costs. Since the change in future freeway pavement construction cost is affected by many factors, the predictions obtained by the proposed method, and therefore the model, will need to be tested once actual data are obtained.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design activities of the development of the SCRAMSPACE I scramjet-powered free-flight experiment are described in this paper. The objectives of this flight are first described together with the definition of the primary, secondary and tertiary experiments. The Scramjet configuration studied is first discussed together with the rocket motor system selected for this flight. The different flight sequences are then explained, highlighting the SCRAMSPACE I free-flyer separation and re-orientation procedures. A design trade-off study is then described considering vehicle stability, packaging, thermo-structural analysis and trajectory, discussing the alignment of the predicted performance with the mission scientific requirements. The global system architecture and instrumentation of the vehicle are then explained. The conclusions of this design phase are that a vehicle design has been produced which is able to meet the mission scientific goals and the procurement & construction of the vehicle are ongoing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Global climate change is one of the most significant environmental issues that can harm human development. One central issue for the building and construction industry to address global climate change is the development of a credible and meaningful way to measure greenhouse gas (GHG) emissions. While Publicly Available Specification (PAS) 2050, the first international GHG standard, has been proven to be successful in standardizing the quantification process, its contribution to the management of carbon labels for construction materials is limited. With the recent publication of ISO 14067: Greenhouse gases – carbon footprint of products – requirements and guidelines for quantification and communication in May 2013, it is necessary for the building and construction industry to understand the past, present and future of the carbon labelling practices for construction materials. A systematic review shows that international GHG standards have been evolving in terms of providing additional guidance on communication and comparison, as well as less flexibility on the use of carbon labels. At the same time, carbon labelling schemes have been evolving on standardization and benchmarking. In addition, future actions are needed in the aspect of raising consumer awareness, providing benchmarking, ensuring standardization and developing simulation technologies in order for carbon labelling schemes for construction materials to provide credible, accurate and transparent information on GHG emissions.