911 resultados para Train scheduling
Resumo:
An electrically tunable system for the control of optical pulse sequences is proposed and demonstrated. It is based on the use of an electrooptic modulator for periodic phase modulation followed by a dispersive device to obtain the temporal Talbot effect. The proposed configuration allows for repetition rate multiplication with different multiplication factors and with the simultaneous control of the pulse train envelope by simply changing the electrical signal driving the modulator. Simulated and experimental results for an input optical pulse train of 10 GHz are shown for different multiplication factors and envelope shapes.
Resumo:
An aerodynamic optimization of the ICE 2 high-speed train nose in term of front wind action sensitivity is carried out in this paper. The nose is parametrically defined by Be?zier Curves, and a three-dimensional representation of the nose is obtained using thirty one design variables. This implies a more complete parametrization, allowing the representation of a real model. In order to perform this study a genetic algorithm (GA) is used. Using a GA involves a large number of evaluations before finding such optimal. Hence it is proposed the use of metamodels or surrogate models to replace Navier-Stokes solver and speed up the optimization process. Adaptive sampling is considered to optimize surrogate model fitting and minimize computational cost when dealing with a very large number of design parameters. The paper introduces the feasi- bility of using GA in combination with metamodels for real high-speed train geometry optimization.
Resumo:
- PV and HCPV compete in the utility market - PV cost reduction has been dramatic through volume - A complete off-the-shelf optics solution by Evonik and LPI - Based on the best-in-class design: The FK concentrator
Resumo:
In order to manage properly ontology development projects in complex settings and to apply correctly the NeOn Methodology, it is crucial to have knowledge of the entire ontology development life cycle before starting the development projects. The ontology project plan and scheduling helps the ontology development team to have this knowledge and to monitor the project execution. To facilitate the planning and scheduling of ontology development projects, the NeOn Toolkit plugin called gOntt has been developed. gOntt is a tool that supports the scheduling of ontology network development projects and helps to execute them. In addition, prescriptive methodological guidelines for scheduling ontology development projects using gOntt are provided.
Resumo:
Abstract Transport is the foundation of any economy: it boosts economic growth, creates wealth, enhances trade, geographical accessibility and the mobility of people. Transport is also a key ingredient for a high quality of life, making places accessible and bringing people together. The future prosperity of our world will depend on the ability of all of its regions to remain fully and competitively integrated in the world economy. Efficient transport is vital in making this happen. Operations research can help in efficiently planning the design and operating transport systems. Planning and operational processes are fields that are rich in combinatorial optimization problems. These problems can be analyzed and solved through the application of mathematical models and optimization techniques, which may lead to an improvement in the performance of the transport system, as well as to a reduction in the time required for solving these problems. The latter aspect is important, because it increases the flexibility of the system: the system can adapt in a faster way to changes in the environment (i.e.: weather conditions, crew illness, failures, etc.). These disturbing changes (called disruptions) often enforce the schedule to be adapted. The direct consequences are delays and cancellations, implying many schedule adjustments and huge costs. Consequently, robust schedules and recovery plans must be developed in order to fight against disruptions. This dissertation makes contributions to two different fields: rail and air applications. Robust planning and recovery methods are presented. In the field of railway transport we develop several mathematical models which answer to RENFE’s (the major railway operator in Spain) needs: 1. We study the rolling stock assignment problem: here, we introduce some robust aspects in order to ameliorate some operations which are likely to fail. Once the rolling stock assignment is known, we propose a robust routing model which aims at identifying the train units’ sequences while minimizing the expected delays and human resources needed to perform the sequences. 2. It is widely accepted that the sequential solving approach produces solutions that are not global optima. Therefore, we develop an integrated and robust model to determine the train schedule and rolling stock assignment. We also propose an integrated model to study the rolling stock circulations. Circulations are determined by the rolling stock assignment and routing of the train units. 3. Although our aim is to develop robust plans, disruptions will be likely to occur and recovery methods will be needed. Therefore, we propose a recovery method which aims to recover the train schedule and rolling stock assignment in an integrated fashion all while considering the passenger demand. In the field of air transport we develop several mathematical models which answer to IBERIA’s (the major airline in Spain) needs: 1. We look at the airline-scheduling problem and develop an integrated approach that optimizes schedule design, fleet assignment and passenger use so as to reduce costs and create fewer incompatibilities between decisions. Robust itineraries are created to ameliorate misconnected passengers. 2. Air transport operators are continuously facing competition from other air operators and different modes of transport (e.g., High Speed Rail). Consequently, airline profitability is critically influenced by the airline’s ability to estimate passenger demands and construct profitable flight schedules. We consider multi-modal competition including airline and rail, and develop a new approach that estimates the demand associated with a given schedule; and generates airline schedules and fleet assignments using an integrated schedule design and fleet assignment optimization model that captures the impacts of schedule decisions on passenger demand.
Resumo:
La influencia de la aerodinámica en el diseño de los trenes de alta velocidad, unida a la necesidad de resolver nuevos problemas surgidos con el aumento de la velocidad de circulación y la reducción de peso del vehículo, hace evidente el interés de plantear un estudio de optimización que aborde tales puntos. En este contexto, se presenta en esta tesis la optimización aerodinámica del testero de un tren de alta velocidad, llevada a cabo mediante el uso de métodos de optimización avanzados. Entre estos métodos, se ha elegido aquí a los algoritmos genéticos y al método adjunto como las herramientas para llevar a cabo dicha optimización. La base conceptual, las características y la implementación de los mismos se detalla a lo largo de la tesis, permitiendo entender los motivos de su elección, y las consecuencias, en términos de ventajas y desventajas que cada uno de ellos implican. El uso de los algorimos genéticos implica a su vez la necesidad de una parametrización geométrica de los candidatos a óptimo y la generación de un modelo aproximado que complementa al método de optimización. Estos puntos se describen de modo particular en el primer bloque de la tesis, enfocada a la metodología seguida en este estudio. El segundo bloque se centra en la aplicación de los métodos a fin de optimizar el comportamiento aerodinámico del tren en distintos escenarios. Estos escenarios engloban los casos más comunes y también algunos de los más exigentes a los que hace frente un tren de alta velocidad: circulación en campo abierto con viento frontal o viento lateral, y entrada en túnel. Considerando el caso de viento frontal en campo abierto, los dos métodos han sido aplicados, permitiendo una comparación de las diferentes metodologías, así como el coste computacional asociado a cada uno, y la minimización de la resistencia aerodinámica conseguida en esa optimización. La posibilidad de evitar parametrizar la geometría y, por tanto, reducir el coste computacional del proceso de optimización es la característica más significativa de los métodos adjuntos, mientras que en el caso de los algoritmos genéticos se destaca la simplicidad y capacidad de encontrar un óptimo global en un espacio de diseño multi-modal o de resolver problemas multi-objetivo. El caso de viento lateral en campo abierto considera nuevamente los dos métoxi dos de optimización anteriores. La parametrización se ha simplificado en este estudio, lo que notablemente reduce el coste numérico de todo el estudio de optimización, a la vez que aún recoge las características geométricas más relevantes en un tren de alta velocidad. Este análisis ha permitido identificar y cuantificar la influencia de cada uno de los parámetros geométricos incluídos en la parametrización, y se ha observado que el diseño de la arista superior a barlovento es fundamental, siendo su influencia mayor que la longitud del testero o que la sección frontal del mismo. Finalmente, se ha considerado un escenario más a fin de validar estos métodos y su capacidad de encontrar un óptimo global. La entrada de un tren de alta velocidad en un túnel es uno de los casos más exigentes para un tren por el pico de sobrepresión generado, el cual afecta a la confortabilidad del pasajero, así como a la estabilidad del vehículo y al entorno próximo a la salida del túnel. Además de este problema, otro objetivo a minimizar es la resistencia aerodinámica, notablemente superior al caso de campo abierto. Este problema se resuelve usando algoritmos genéticos. Dicho método permite obtener un frente de Pareto donde se incluyen el conjunto de óptimos que minimizan ambos objetivos. ABSTRACT Aerodynamic design of trains influences several aspects of high-speed trains performance in a very significant level. In this situation, considering also that new aerodynamic problems have arisen due to the increase of the cruise speed and lightness of the vehicle, it is evident the necessity of proposing an optimization study concerning the train aerodynamics. Thus, the aerodynamic optimization of the nose shape of a high-speed train is presented in this thesis. This optimization is based on advanced optimization methods. Among these methods, genetic algorithms and the adjoint method have been selected. A theoretical description of their bases, the characteristics and the implementation of each method is detailed in this thesis. This introduction permits understanding the causes of their selection, and the advantages and drawbacks of their application. The genetic algorithms requirethe geometrical parameterization of any optimal candidate and the generation of a metamodel or surrogate model that complete the optimization process. These points are addressed with a special attention in the first block of the thesis, focused on the methodology considered in this study. The second block is referred to the use of these methods with the purpose of optimizing the aerodynamic performance of a high-speed train in several scenarios. These scenarios englobe the most representative operating conditions of high-speed trains, and also some of the most exigent train aerodynamic problems: front wind and cross-wind situations in open air, and the entrance of a high-speed train in a tunnel. The genetic algorithms and the adjoint method have been applied in the minimization of the aerodynamic drag on the train with front wind in open air. The comparison of these methods allows to evaluate the methdology and computational cost of each one, as well as the resulting minimization of the aerodynamic drag. Simplicity and robustness, the straightforward realization of a multi-objective optimization, and the capability of searching a global optimum are the main attributes of genetic algorithm. However, the requirement of geometrically parameterize any optimal candidate is a significant drawback that is avoided with the use of the adjoint method. This independence of the number of design variables leads to a relevant reduction of the pre-processing and computational cost. Considering the cross-wind stability, both methods are used again for the minimization of the side force. In this case, a simplification of the geometric parameterization of the train nose is adopted, what dramatically reduces the computational cost of the optimization process. Nevertheless, some of the most important geometrical characteristics are still described with this simplified parameterization. This analysis identifies and quantifies the influence of each design variable on the side force on the train. It is observed that the A-pillar roundness is the most demanding design parameter, with a more important effect than the nose length or the train cross-section area. Finally, a third scenario is considered for the validation of these methods in the aerodynamic optimization of a high-speed train. The entrance of a train in a tunnel is one of the most exigent train aerodynamic problems. The aerodynamic consequences of high-speed trains running in a tunnel are basically resumed in two correlated phenomena, the generation of pressure waves and an increase in aerodynamic drag. This multi-objective optimization problem is solved with genetic algorithms. The result is a Pareto front where a set of optimal solutions that minimize both objectives.
Resumo:
Most CPV systems are based on Fresnel lenses. Among these, LPI-patented Fresnel-Köhler (FK) concentrator outstands owing to performance and practical reasons. The VentanaTM power train is the first off-the-shelf commercial product based on the FK and comprises both the primary (POE) lenses (a 36-units 1×1 m2 acrylic panel manufactured by EVONIK and 10×) and glass (or Savosil) secondary optics (SOE). This high concentration optical train (Cg=1,024×, ~250mm optical depth) fits with 5×5 mm2 (at least) solar cells. The optical train is the fruit of a 1-year development that has included design, modeling, prototyping and characterization, and through the process LPI had the opportunity to find out how well the actual performance correlates with models, but also learned practical aspects of a CPV system of this kind, some of which have very positive impact on system performance and reliability.
Resumo:
Importancia del ejercicio en un tratamiento de pérdia de peso
Resumo:
Los pasos inferiores son muy numerosos en las líneas de ferrocarril. Su comportamiento dinámico ha recibido mucha menos atención que el de otras estructuras como los puentes, pero su elevado número hace que su estudio sea económicamente relevante con vista a optimizar su forma, manteniendo la seguridad. El proyecto de puentes según el Eurocódigo incluye comprobaciones de estados límite de tensiones bajo carga dinámica. En el caso de pasos inferiores, las comprobaciones pueden resultar tan costosas como aquellas de puentes, pese a que su coste es mucho menor. Por tanto, se impone la búsqueda de unas reglas de cálculo simplificado que pongan en consonancia el coste de la estructura con el esfuerzo necesario para su proyecto. Este artículo propone un conjunto de reglas basadas en un estudio paramétrico = Underpasses are common in modern railway lines. Wildlife corridors and drainage conduits often fall into this category of partially buried structures. Their dynamic behavior has received far less attention than that of other structures such as bridges, but their large number makes their study an interesting challenge from the viewpoint of safety and cost savings. The bridge design rules in accordance with the Eurocode involve checks on stresses according to dynamic loading. In the case of underpasses, those checks may be as much as those for bridges. Therefore, simplified design rules may align the design effort with their cost. Such a set of rules may provide estimations of response parameters based on the key parameters influencing the result. This paper contains a proposal based on a parametric study.
Resumo:
Mode switches are used to partition the system’s behavior into different modes to reduce the complexity of large embedded systems. Such systems operate in multiple modes in which each one corresponds to a specific application scenario; these are called Multi-Mode Systems (MMS). A different piece of software is normally executed for each mode. At any given time, the system can be in one of the predefined modes and then be switched to another as a result of a certain condition. A mode switch mechanism (or mode change protocol) is used to shift the system from one mode to another at run-time. In this thesis we have used a hierarchical scheduling framework to implement a multi-mode system called Multi-Mode Hierarchical Scheduling Framework (MMHSF). A two-level Hierarchical Scheduling Framework (HSF) has already been implemented in an open source real-time operating system, FreeRTOS, to support temporal isolation among real-time components. The main contribution of this thesis is the extension of the HSF featuring a multimode feature with an emphasis on making minimal changes in the underlying operating system (FreeRTOS) and its HSF implementation. Our implementation uses fixed-priority preemptive scheduling at both local and global scheduling levels and idling periodic servers. It also now supports different modes of the system which can be switched at run-time. Each subsystem and task exhibit different timing attributes according to mode, and upon a Mode Change Request (MCR) the task-set and timing interfaces of the entire system (including subsystems and tasks) undergo a change. A Mode Change Protocol specifies precisely how the system-mode will be changed. However, an application may not only need to change a mode but also a different mode change protocol semantic. For example, the mode change from normal to shutdown can allow all the tasks to be completed before the mode itself is changed, while changing a mode from normal to emergency may require aborting all tasks instantly. In our work, both the system mode and the mode change protocol can be changed at run-time. We have implemented three different mode change protocols to switch from one mode to another: the Suspend/resume protocol, the Abort protocol, and the Complete protocol. These protocols increase the flexibility of the system, allowing users to select the way they want to switch to a new mode. The implementation of MMHSF is tested and evaluated on an AVR-based 32 bit board EVK1100 with an AVR32UC3A0512 micro-controller. We have tested the behavior of each system mode and for each mode change protocol. We also provide the results for the performance measures of all mode change protocols in the thesis. RESUMEN Los conmutadores de modo son usados para particionar el comportamiento del sistema en diferentes modos, reduciendo así la complejidad de grandes sistemas empotrados. Estos sistemas tienen multiples modos de operación, cada uno de ellos correspondiente a distintos escenarios y para distintas aplicaciones; son llamados Sistemas Multimodales (o en inglés “Multi-Mode Systems” o MMS). Normalmente cada modo ejecuta una parte de código distinto. En un momento dado el sistema, que está en un modo concreto, puede ser cambiado a otro modo distinto como resultado de alguna condicion impuesta previamente. Los mecanismos de cambio de modo (o protocolos de cambio de modo) son usados para mover el sistema de un modo a otro durante el tiempo de ejecución. En este trabajo se ha usado un modelo de sistema operativo para implementar un sistema multimodo llamado MMHSF, siglas en inglés correspondientes a (Multi-Mode Hierarchical Scheduling Framework). Este sistema está basado en el HSF (Hierarchical Scheduling Framework), un modelo de sistema operativo con jerarquía de dos niveles, implementado en un sistema operativo en tiempo real de libre distribución llamado FreeRTOS, capaz de permitir el aislamiento temporal entre componentes. La principal contribución de este trabajo es la ampliación del HSF convirtiendolo en un sistema multimodo realizando los cambios mínimos necesarios sobre el sistema operativo FreeRTOS y la implementación ya existente del HSF. Esta implementación usa un sistema de planificación de prioridad fija para ambos niveles de jerarquía, ocupando el tiempo entre tareas con un “modo reposo”. Además el sistema es capaz de cambiar de un modo a otro en tiempo de ejecución. Cada subsistema y tarea son capaces de tener distintos atributos de tiempo (prioridad, periodo y tiempo de ejecución) en función del modo. Bajo una demanda de cambio de modo (Mode Change Request MCR) se puede variar el set de tareas en ejecución, así como los atributos de los servidores y las tareas. Un protocolo de cambio de modo espeficica precisamente cómo será cambiado el sistema de un modo a otro. Sin embargo una aplicación puede requerir no solo un cambio de modo, sino que lo haga de una forma especifica. Por ejemplo, el cambio de modo de “normal” a “apagado” puede permitir a las tareas en ejecución ser finalizadas antes de que se complete la transición, pero sin embargo el cambio de “normal” a “emergencia” puede requerir abortar todas las tareas instantaneamente. En este trabajo ambas características, tanto el modo como el protocolo de cambio, pueden ser cambiadas en tiempo de ejecución, pero deben ser previamente definidas por el desarrollador. Han sido definidos tres protocolos de cambios: el protocolo “suspender/continuar”, protocolo “abortar” y el protocolo “completar”. Estos protocolos incrementan la flexibilidad del sistema, permitiendo al usuario seleccionar de que forma quieren cambiar hacia el nuevo modo. La implementación del MMHSF ha sido testada y evaluada en una placa AVR EVK1100, con un micro-controlador AVR32UC3A0. Se ha comprobado el comportamiento de los distintos modos para los distintos protocolos, definidos previamente. Como resultado se proporcionan las medidades de rendimiento de los distintos protocolos de cambio de modo.
Resumo:
Pipeline transport represents one of the most important means of moving oil derivatives to different locations. It is both a reliable and inexpensive means of transport, and it yields small variable costs along with a great degree of reliability. Pipeline scheduling is not a trivial task; it involves considerable time from schedulers. Discussed here is a real-application case of a tool that helps schedulers simulate pipeline performance as a means of creating a feasible schedule for a particular time span.
Resumo:
Los dispositivos móviles modernos disponen cada vez de más funcionalidad debido al rápido avance de las tecnologías de las comunicaciones y computaciones móviles. Sin embargo, la capacidad de la batería no ha experimentado un aumento equivalente. Por ello, la experiencia de usuario en los sistemas móviles modernos se ve muy afectada por la vida de la batería, que es un factor inestable de difícil de control. Para abordar este problema, investigaciones anteriores han propuesto un esquema de gestion del consumo (PM) centrada en la energía y que proporciona una garantía sobre la vida operativa de la batería mediante la gestión de la energía como un recurso de primera clase en el sistema. Como el planificador juega un papel fundamental en la administración del consumo de energía y en la garantía del rendimiento de las aplicaciones, esta tesis explora la optimización de la experiencia de usuario para sistemas móviles con energía limitada desde la perspectiva de un planificador que tiene en cuenta el consumo de energía en un contexto en el que ésta es un recurso de primera clase. En esta tesis se analiza en primer lugar los factores que contribuyen de forma general a la experiencia de usuario en un sistema móvil. Después se determinan los requisitos esenciales que afectan a la experiencia de usuario en la planificación centrada en el consumo de energía, que son el reparto proporcional de la potencia, el cumplimiento de las restricciones temporales, y cuando sea necesario, el compromiso entre la cuota de potencia y las restricciones temporales. Para cumplir con los requisitos, el algoritmo clásico de fair queueing y su modelo de referencia se extienden desde los dominios de las comunicaciones y ancho de banda de CPU hacia el dominio de la energía, y en base a ésto, se propone el algoritmo energy-based fair queueing (EFQ) para proporcionar una planificación basada en la energía. El algoritmo EFQ está diseñado para compartir la potencia consumida entre las tareas mediante su planificación en función de la energía consumida y de la cuota reservada. La cuota de consumo de cada tarea con restricciones temporales está protegida frente a diversos cambios que puedan ocurrir en el sistema. Además, para dar mejor soporte a las tareas en tiempo real y multimedia, se propone un mecanismo para combinar con el algoritmo EFQ para dar preferencia en la planificación durante breves intervalos de tiempo a las tareas más urgentes con restricciones temporales.Las propiedades del algoritmo EFQ se evaluan a través del modelado de alto nivel y la simulación. Los resultados de las simulaciones indican que los requisitos esenciales de la planificación centrada en la energía pueden lograrse. El algoritmo EFQ se implementa más tarde en el kernel de Linux. Para evaluar las propiedades del planificador EFQ basado en Linux, se desarrolló un banco de pruebas experimental basado en una sitema empotrado, un programa de banco de pruebas multihilo, y un conjunto de pruebas de código abierto. A través de experimentos específicamente diseñados, esta tesis verifica primero las propiedades de EFQ en la gestión de la cuota de consumo de potencia y la planificación en tiempo real y, a continuación, explora los beneficios potenciales de emplear la planificación EFQ en la optimización de la experiencia de usuario para sistemas móviles con energía limitada. Los resultados experimentales sobre la gestión de la cuota de energía muestran que EFQ es más eficaz que el planificador de Linux-CFS en la gestión de energía, logrando un reparto proporcional de la energía del sistema independientemente de en qué dispositivo se consume la energía. Los resultados experimentales en la planificación en tiempo real demuestran que EFQ puede lograr de forma eficaz, flexible y robusta el cumplimiento de las restricciones temporales aunque se dé el caso de aumento del el número de tareas o del error en la estimación de energía. Por último, un análisis comparativo de los resultados experimentales sobre la optimización de la experiencia del usuario demuestra que, primero, EFQ es más eficaz y flexible que los algoritmos tradicionales de planificación del procesador, como el que se encuentra por defecto en el planificador de Linux y, segundo, que proporciona la posibilidad de optimizar y preservar la experiencia de usuario para los sistemas móviles con energía limitada. Abstract Modern mobiledevices have been becoming increasingly powerful in functionality and entertainment as the next-generation mobile computing and communication technologies are rapidly advanced. However, the battery capacity has not experienced anequivalent increase. The user experience of modern mobile systems is therefore greatly affected by the battery lifetime,which is an unstable factor that is hard to control. To address this problem, previous works proposed energy-centric power management (PM) schemes to provide strong guarantee on the battery lifetime by globally managing energy as the first-class resource in the system. As the processor scheduler plays a pivotal role in power management and application performance guarantee, this thesis explores the user experience optimization of energy-limited mobile systemsfrom the perspective of energy-centric processor scheduling in an energy-centric context. This thesis first analyzes the general contributing factors of the mobile system user experience.Then itdetermines the essential requirements on the energy-centric processor scheduling for user experience optimization, which are proportional power sharing, time-constraint compliance, and when necessary, a tradeoff between the power share and the time-constraint compliance. To meet the requirements, the classical fair queuing algorithm and its reference model are extended from the network and CPU bandwidth sharing domain to the energy sharing domain, and based on that, the energy-based fair queuing (EFQ) algorithm is proposed for performing energy-centric processor scheduling. The EFQ algorithm is designed to provide proportional power shares to tasks by scheduling the tasks based on their energy consumption and weights. The power share of each time-sensitive task is protected upon the change of the scheduling environment to guarantee a stable performance, and any instantaneous power share that is overly allocated to one time-sensitive task can be fairly re-allocated to the other tasks. In addition, to better support real-time and multimedia scheduling, certain real-time friendly mechanism is combined into the EFQ algorithm to give time-limited scheduling preference to the time-sensitive tasks. Through high-level modelling and simulation, the properties of the EFQ algorithm are evaluated. The simulation results indicate that the essential requirements of energy-centric processor scheduling can be achieved. The EFQ algorithm is later implemented in the Linux kernel. To assess the properties of the Linux-based EFQ scheduler, an experimental test-bench based on an embedded platform, a multithreading test-bench program, and an open-source benchmark suite is developed. Through specifically-designed experiments, this thesis first verifies the properties of EFQ in power share management and real-time scheduling, and then, explores the potential benefits of employing EFQ scheduling in the user experience optimization for energy-limited mobile systems. Experimental results on power share management show that EFQ is more effective than the Linux-CFS scheduler in managing power shares and it can achieve a proportional sharing of the system power regardless of on which device the energy is spent. Experimental results on real-time scheduling demonstrate that EFQ can achieve effective, flexible and robust time-constraint compliance upon the increase of energy estimation error and task number. Finally, a comparative analysis of the experimental results on user experience optimization demonstrates that EFQ is more effective and flexible than traditional processor scheduling algorithms, such as those of the default Linux scheduler, in optimizing and preserving the user experience of energy-limited mobile systems.
Resumo:
At present, engineering problems required quite a sophisticated calculation means. However, analytical models still can prove to be a useful tool for engineers and scientists when dealing with complex physical phenomena. The mathematical models developed to analyze three different engineering problems: photovoltaic devices analysis; cup anemometer performance; and high-speed train pressure wave effects in tunnels are described. In all cases, the results are quite accurate when compared to testing measurements.
Resumo:
The optimization of the nose shape of a high-speed train entering a tunnel has been performed using genetic algorithms(GA).This optimization method requires the parameterization of each optimal candidate as a design vector.The geometrical parameterization of the nose has been defined using three design variables that include the most characteristic geometrical factors affecting the compression wave generated at the entry of the train and the aerodynamic drag of the train.
Resumo:
When dealing with the design of a high-speed train, a multiobjective shape optimization problem is formulated, as these vehicles are object of many aerodynamic problems which are known to be in conflict. More mobility involves an increase in both the cruise speed and lightness, and these requirements directly influence the stability and the ride comfort of the passengers when the train is subjected to a side wind. Thus, crosswind stability plays a more relevant role among the aerodynamic objectives to be optimized. An extensive research activity is observed on aerodynamic response in crosswind conditions.