788 resultados para Construction industry Management Computer programs
Resumo:
Public awareness and the nature of highway construction works demand that sustainability measures are first on the development agenda. However, in the current economic climate, individual volition and enthusiasm for such high capital investments do not present as strong cases for decision making as the financial pictures of pursuing sustainability. Some stakeholders consider sustainability to be extra work that costs additional money. Though, stakeholders realised its importance in infrastructure development. They are keen to identify the available alternatives and financial implications on a lifecycle basis. Highway infrastructure development is a complex rocess which requires expertise and tools to evaluate investment options, such as environmentally sustainable features for road and highway development. Life-cycle cost analysis (LCCA) is a valuable approach for investment decision making for construction works. However, LCCA applications in highway development are still limited. Current models, for example focus on economic issues alone and do not deal with sustainability factors, which are more difficult to quantify and encapsulate in estimation modules. This paper reports the research which identifies sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into past and proven LCCA models to produce a new long term decision support model. The research via questionnaire, model building, analytical hierarchy processes (AHP) and case studies have identified, evaluated and then processed highway sustainability related cost elements. These cost elements need to be verified by industry before being integrated for further development of the model. Then the Australian construction industry will have a practical tool to evaluate investment decisions which provide an optimum balance between financial viability and sustainability deliverables.
Resumo:
Construction sector application of Lead Indicators generally and Positive Performance Indicators (PPIs) particularly, are largely seen by the sector as not providing generalizable indicators of safety effectiveness. Similarly, safety culture is often cited as an essential factor in improving safety performance, yet there is no known reliable way of measuring safety culture. This paper proposes that the accurate measurement of safety effectiveness and safety culture is a requirement for assessing safe behaviours, safety knowledge, effective communication and safety performance. Currently there are no standard national or international safety effectiveness indicators (SEIs) that are accepted by the construction industry. The challenge is that quantitative survey instruments developed for measuring safety culture and/ or safety climate are inherently flawed methodologically and do not produce reliable and representative data concerning attitudes to safety. Measures that combine quantitative and qualitative components are needed to provide a clear utility for safety effectiveness indicators.
Resumo:
The exchange of design models in the design and construction industry is evolving away from 2-dimensional computer-aided design (CAD) and paper towards semantically-rich 3-dimensional digital models. This approach, known as Building Information Modelling (BIM), is anticipated to become the primary means of information exchange between the various parties involved in construction projects. From a technical perspective, the domain represents an interesting study in model-based interoperability, since the models are large and complex, and the industry is one in which collaboration is a vital part of business. In this paper, we present our experiences with issues of model-based interoperability in exchanging building information models between various tools, and in implementing tools which consume BIM models, particularly using the industry standard IFC data modelling format. We report on the successes and challenges in these endeavours, as the industry endeavours to move further towards fully digitised information exchange.
Resumo:
Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographics location, and project delivery method. The research results indicate a correlation between the reciprocal of project budgets size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.
Resumo:
Successful construction project managers often stress the importance of team working, relationship management, project environment and senior management commitment as being key determinants of project success. However, it is generally accepted that the construction industry has stronger preference for displaying distrust rather than emancipating the full benefits of cooperation. In the research domain, the impact of culture and organisation on project performance is becoming an increasingly important topic for the establishment of a sound relational approach to projects. Relational procurement strategies emphasise the importance of sustainable relationships. However, the efficacy of relational contracting is, so far, unproven. This study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. Initial findings captured from a survey undertaken with construction contracting organisations in Australia, where the perceptions of professional personnel and supply chain relationships are reported in this paper. A four-level project performance effectiveness model developed in this research is also presented.
Resumo:
Work time spread across the entire week, rather than the conventional five day working week, has meant that workers are now less able to utilise longer stretches of recreation time especially in gaining access to a full two-day break over a weekend. This paper explores the issues contributing to workers' acquisition of longer recreation time. It seeks to determine the effects of this acquisition on the quality of working and non-working time for the employee through a study of work-life balance in the construction industry. It finds that weekends are more important to achieving work-life balance than shorter days over a six-day week when working long hours. Further, 'personal time' is a key element in achieving satisfactory work-life balance for employees, and this type of 'time' is often forgone in trying to integrate the necessary and desired non-work activities in the shorter time available to workers.
Resumo:
Zero energy buildings (ZEB) and zero energy homes (ZEH) are a current hot topic globally for policy makers (what are the benefits and costs), designers (how do we design them), the construction industry (can we build them), marketing (will consumers buy them) and researchers (do they work and what are the implications). This paper presents initial findings from actual measured data from a 9 star (as built), off-ground detached family home constructed in south-east Queensland in 2008. The integrated systems approach to the design of the house is analysed in each of its three main goals: maximising the thermal performance of the building envelope, minimising energy demand whilst maintaining energy service levels, and implementing a multi-pronged low carbon approach to energy supply. The performance outcomes of each of these stages are evaluated against definitions of Net Zero Carbon / Net Zero Emissions (Site and Source) and Net Zero Energy (onsite generation v primary energy imports). The paper will conclude with a summary of the multiple benefits of combining very high efficiency building envelopes with diverse energy management strategies: a robustness, resilience, affordability and autonomy not generally seen in housing.
Resumo:
The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.
Resumo:
Purpose: The goal of this conceptual paper is to provide tools to help maximise the value delivered by infrastructure projects, by developing methods to increase adoption of innovative products during construction. Methods: The role of knowledge flows in determining innovation adoption rates is conceptually examined. A promising new approach is developed. Open innovation system theory is extended, by reviewing the role of three frameworks: (1) knowledge intermediaries, (2) absorptive capacity and (3) governance arrangements. Originality: We develop a novel open innovation system model to guide further research in the area of adoption of innovation on infrastructure projects. The open innovation system model currently lacks definition of core concepts, especially with regard to the impact of different degrees and types of openness. The three frameworks address this issue and add substance to the open innovation system model, addressing widespread criticism that it is underdeveloped. The novelty of our model is in the combination of the three frameworks to explore the system. These frameworks promise new insights into system dynamics and facilitate the development of new methods to optimise the diffusion of innovation. Practical Implications: The framework will help to reveal gaps in knowledge flows that impede the uptake of innovations. In the past, identifying these gaps has been difficult given the lack of nuance in existing theory. The knowledge maps proposed will enable informed policy advice to effectively harness the power of knowledge networks, increase innovation diffusion and improve the performance of infrastructure projects. The models developed in this paper will be used in planned empirical research into innovation on large scale infrastructure projects in the Australian built environment.
Resumo:
The outcomes of the construction projects can be evaluated in numerous ways. One method is to measure the satisfaction of participants as represented by the differences between their expectations and perceptions. This measurement is used widely in construction as it promises benefits, such as the improvement of product delivery, and enhances services quality by identifying some necessary changes. Commonly satisfaction measurement is gauged by evaluating the level of client satisfaction of construction performance. The measurement of customer satisfaction on the other hand, is based on the quality of the end product. This evaluation is used to encourage contractors to improve their performance to a required level and to ensure that the projects are delivered as expected- in terms of time, budget and quality. Several studies of performance measurement have indicated that contractor performance is still not satisfactory, as the outcome delivered is not as required (because of cost overruns, time overruns or because it is generally unsatisfactory). This drawback may be due to the contractors’ lack of expertise, motivation and/or satisfaction. The measurement of performance based on contractor satisfaction levels is still new and very few studies have yet taken place in the construction industry. This paper examines how the characteristics of a contracting organisation – namely its experience in the industry, background, past performance, size of organisation and financial stability- may influence its satisfaction levels with regards to project performance. Previous literature reviews and interviews are used as research tools in the preliminary investigation. The outcome is expected to present a basic understanding of contractor satisfaction measurement and its potential for improving the performance of project outcomes.
Resumo:
Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.