998 resultados para Áuas contaminadas - Gerenciamento


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2015.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação (mestrado)—Universidade de Brasília, Instituto de Geociências, 2016.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work aims to analyze risks related to information technology (IT) in procedures related to data migration. This is done considering ALEPH, Integrated Libray System (ILS) that migrated data to the Library Module present in the software called Sistema Integrado de Gestão de Atividades Acadêmicas (SIGAA) at the Zila Mamede Central Library at the Federal University of Rio Grande do Norte (UFRN) in Natal/Brazil. The methodological procedure used was of a qualitative exploratory research with the realization of case study at the referred library in order to better understand this phenomenon. Data collection was able once there was use of a semi-structured interview that was applied with (11) subjects that are employed at the library as well as in the Technology Superintendence at UFRN. In order to examine data Content analysis as well as thematic review process was performed. After data migration the results of the interview were then linked to both analysis units and their system register with category correspondence. The main risks detected were: data destruction; data loss; data bank communication failure; user response delay; data inconsistency and duplicity. These elements point out implication and generate disorders that affect external and internal system users and lead to stress, work duplicity and hassles. Thus, some measures were taken related to risk management such as adequate planning, central management support, and pilot test simulations. For the advantages it has reduced of: risk, occurrence of problems and possible unforeseen costs, and allows achieving organizational objectives, among other. It is inferred therefore that the risks present in data bank conversion in libraries exist and some are predictable, however, it is seen that librarians do not know or ignore and are not very worried in the identification risks in data bank conversion, their acknowledge would minimize or even extinguish them. Another important aspect to consider is the existence of few empirical research that deal specifically with this subject and thus presenting the new of new approaches in order to promote better understanding of the matter in the corporate environment of the information units

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Universidade Federal do Rio Grande do Norte

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Elétrica, 2016.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Se realizó un estudio transversal; en un universo de 385 pacientes. Los datos se obtuvieron por entrevista directa y se analizaron con el software Excel y Epi-Infor, Resultados: la prevalencia de infección del sistio de la herida quirúrgica fue del 10.6% (IC 95% 9.03-12.17). La mayoría fueron de sexo femenino; la edad varió entre los 16 y 87 años. La asociación entre infección del sitio de la herida quirúrgica con cirugía de emergencia proporcionó una p=0.0019 (IC 95% de la RP 1.10-3,99); con cirugía convencional p=0.778 (IC 95% de RP 0.61-1,95); con herida limpia p=0.238 (IC 95% de RP 0.10-1.55); con la utilización de cefazolina p=0.023 (IC 95% de la RP 0.09-0.94) y con el tiempo quirúrgico menos de una hora p=o.000 (IC 95% de RP 0.01-0.32). Conclusión: la prevalencia de ainfección del sitio de la herida quirúrgica fue del 10.6% (IC 95% 0.03-12,17). La cirugía de emergencia fue factor de riesgo para infección del sitio de la herida quirúrgica y la cefazolina, utilizado como antibiótico profiláctico, y el tiempo quirúrgico, menos de una hora, fueron factores de protección

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Uma propriedade leiteira é trabalho para todos os dias. Para isso é necessário avaliar o andamento das atividades, os dados, as informações registradas na propriedade e pensar nos ajustes em função do que se deseja alcançar. São aspectos de gerenciamento que o produtor deve ficar atento para melhor desenvolvimento de sua atividade. O zootecnista e pesquisador da Embrapa Gado de Leite, Sérgio Rustichelli Teixeira traz mais informações sobre o gerenciamento adequado para o bom desempenho da propriedade leiteira.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Uma propriedade leiteira é trabalho para todos os dias. Para isso é necessário avaliar o andamento das atividades, os dados, as informações registradas na propriedade e pensar nos ajustes em função do que se deseja alcançar. São aspectos de gerenciamento que o produtor deve ficar atento para melhor desenvolvimento de sua atividade. O zootecnista e pesquisador da Embrapa Gado de Leite, Sérgio Rustichelli Teixeira traz mais informações sobre o gerenciamento adequado para o bom desempenho da propriedade leiteira.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Uma propriedade leiteira é trabalho para todos os dias. Para isso é necessário avaliar o andamento das atividades, os dados, as informações registradas na propriedade e pensar nos ajustes em função do que se deseja alcançar. São aspectos de gerenciamento que o produtor deve ficar atento para melhor desenvolvimento de sua atividade. O zootecnista e pesquisador da Embrapa Gado de Leite, Sérgio Rustichelli Teixeira traz mais informações sobre o gerenciamento adequado para o bom desempenho da propriedade leiteira.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Uma propriedade leiteira é trabalho para todos os dias. Para isso é necessário avaliar o andamento das atividades, os dados, as informações registradas na propriedade e pensar nos ajustes em função do que se deseja alcançar. São aspectos de gerenciamento que o produtor deve ficar atento para melhor desenvolvimento de sua atividade. O zootecnista e pesquisador da Embrapa Gado de Leite, Sérgio Rustichelli Teixeira traz mais informações sobre o gerenciamento adequado para o bom desempenho da propriedade leiteira.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the operational context of industrial processes, alarm, by definition, is a warning to the operator that an action with limited time to run is required, while the event is a change of state information, which does not require action by the operator, therefore should not be advertised, and only stored for analysis of maintenance, incidents and used for signaling / monitoring (EEMUA, 2007). However, alarms and events are often confused and improperly configured similarly by developers of automation systems. This practice results in a high amount of pseudo-alarms during the operation of industrial processes. The high number of alarms is a major obstacle to improving operational efficiency, making it difficult to identify problems and increasing the time to respond to abnormalities. The main consequences of this scenario are the increased risk to personal safety, facilities, environment deterioration and loss of production. The aim of this paper is to present a philosophy for setting up a system of supervision and control, developed with the aim of reducing the amount of pseudo-alarms and increase reliability of the information that the system provides. A real case study was conducted in the automation system of the offshore production of hydrocarbons from Petrobras in Rio Grande do Norte, in order to validate the application of this new methodology. The work followed the premises of the tool presented in ISA SP18.2. 2009, called "life cycle alarm . After the implementation of methodology there was a significant reduction in the number of alarms