1000 resultados para volume overload
Resumo:
The goal of this study is to develop a usable sufficiency rating system for secondary roads. There are several assumptions that have been made at the outset. These are: 1. County engineers currently use at least a limited set of decision criteria to make decisions regarding project priorities. 2. Some degree of consensus exists among the county engineers in terms of which are the most important criteria and that there is some agreement on their relative importance. Accordingly, a questionnaire was developed which could be used as a survey tool. The results of the survey were used to develop a final list of weighted rating elements which were used as part of the proposed sufficiency rating system. State and local jurisdictions from other states were also surveyed to determine the status of the use of sufficiency rating systems for secondary roads outside of Iowa and to gather some applicable data.
Resumo:
Provides instructions for using the computer program which was developed under the research project, "The Economics of Reducing the County Road System: Three Case Studies In Iowa". This program operates on an IBP personal computer with 300K storage. A fixed disk is required with at least 3 megabytes of storage. The computer must be equipped with DOS version 3.0; the programs are written in Fortran. The user's manual describes all data requirements including network preparation, trip information, cost for maintenance, reconstruction, etc. Program operation instructions are presented, as well as sample solution output and a listing of the computer programs.
Resumo:
This final report for Phase 1 of the research on epoxy-coated, prestressing strands in precast prestressed concrete (PC) panels has been published in two volumes. This volume, Volume 1--Technical Report, contains the problem description, literature review, and survey results; descriptions of the test specimens, experimental tests, and analytical models; discussions of the analytical and experimental results; summary, conclusions, and recommendations; list of references; and acknowledgment. Volume 2--Supplemental Report contains additional information in the form of summarized responses to the questionnaires; graphs showing the strand forces; figures showing the geometry of the specimens and concrete crack patterns that formed in the strand transfer length and strand development length specimens; and graphs of the concrete strains in the strand transfer length specimens, load-point deflections, and strand-slip measurements for the strand development length specimens.
Resumo:
Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. After reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 2) presents the results of Concept 2 - Modification of the Beam-in-Slab Bridge. Concept 1 - Steel Beam Precast Units is presented in Volume 1. Concept 2 involves various laboratory tests of the Beam-in-Slab bridge (BISB) currently being used by Benton County and several other Iowa counties. In this investigation, the behavior and strength of the BISB were determined; a new method of obtaining composite action between the steel beams and concrete was also tested. Since the Concept 2 bridge is primarily intended for use on low-volume roads, the system can be constructed with new or used beams. In the experimental part of the investigation, there were three types of laboratory tests: push-out tests, service and ultimate load tests of models of the BISB, and composite beam tests utilizing the newly developed shear connection. In addition to the laboratory tests, there was a field test in which an existing BISB was service load tested. An equation was developed for predicting the strength of the shear connection investigated; in addition, a finite element model for analyzing the BISB was also developed. Push-out tests were completed to determine the strength of the recently developed shear connector. A total of 36 specimens were tested, with variables such as hole diameter, hole spacing, presence of reinforcement, etc. being investigated. In the model tests of the BISB, two and four beam specimens [L=9,140 mm (30 ft)] were service load tested for behavior and load distribution data. Upon completion of these tests, both specimens were loaded to failure. In the composite beam tests, four beams, one with standard shear studs and three using the shear connection developed, were tested. Upon completion of the service load tests, all four beams were loaded to failure. The strength and behavior of the beams with the new shear connection were found to be essentially the same as that of the specimen with standard shear studs.
Resumo:
Abstract
Resumo:
This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.
Resumo:
Most research current to the time of these projects was focused on use of Superpave mix designs on higher volume roads. Low volume roads have different requirements in terms of mix design, aggregate types, aggregate sources and project budgets. The purpose of this research was to determine if the Superpave mix design strategy for low volume roads was practical and economical. Eight projects were selected in five counties. The projects were completed in the summer of 1998. Performance evaluation of the resulting pavements was carried out annually. There was no significant increase in costs related to the use of Superpave. Nor were there any significant construction issues. There were some differences noted in placement and compaction in the field, but these were not serious.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges are scheduled for removal. Five of these are old high-truss single-lane bridges, each bridge having several simple spans. The other bridge is a fairly modern (1955) double 4-span continuous beam-and-slab composite highway bridge. The availability of these bridges affords an unusual opportunity for study of the behavior of full-scale bridges. Because of the magnitude of the potential testing program, a feasibility study was initiated and the results are presented in this two-part final report. Part I summarizes the findings and Part II presents the supporting detailed information.
Resumo:
Patients with Alzheimer's disease (AD) and schizophrenia display cognitive, behavioural disturbances and morphological abnormalities. Although these latter reflect progressive neurodegeneration in AD, their significance in schizophrenia is still unclear. We explored the patterns of hippocampal and amygdalar atrophy in those patients and their associations with clinical parameters. Structural magnetic resonance imaging was performed in 20 elderly schizophrenia patients, 20 AD and 19 healthy older controls. Hippocampal and amygdalar volumes were obtained by manual segmentation with a standardized protocol and compared among groups. In both schizophrenia and AD patients, left hippocampal and amygdalar volumes were significantly smaller. The hippocampus/amygdala ratio was significantly lower in schizophrenia compared to both AD cases [2.4 bilaterally, 95% C.I. 2.2 to 2.7] and healthy controls bilaterally [2.5, 95% C.I. 2.3 to 2.9 in left and 2.7, 95% C.I. 2.4 to 3.1 in right hemisphere]. In schizophrenia patients, a significant positive correlation was found between age at disease onset and the right hippocampus/amygdala volume ratio (Spearman rho=0.56). Negative symptoms correlated with higher right/left amygdala volume ratio (Spearman's rho=0.43). Our data show that unlike AD, the hippocampus/amygdala ratio is abnormally low and correlates with the age at onset in schizophrenia, being a neurodevelopmental signature of the disease.
Resumo:
The multiscale finite-volume (MSFV) method has been derived to efficiently solve large problems with spatially varying coefficients. The fine-scale problem is subdivided into local problems that can be solved separately and are coupled by a global problem. This algorithm, in consequence, shares some characteristics with two-level domain decomposition (DD) methods. However, the MSFV algorithm is different in that it incorporates a flux reconstruction step, which delivers a fine-scale mass conservative flux field without the need for iterating. This is achieved by the use of two overlapping coarse grids. The recently introduced correction function allows for a consistent handling of source terms, which makes the MSFV method a flexible algorithm that is applicable to a wide spectrum of problems. It is demonstrated that the MSFV operator, used to compute an approximate pressure solution, can be equivalently constructed by writing the Schur complement with a tangential approximation of a single-cell overlapping grid and incorporation of appropriate coarse-scale mass-balance equations.
Resumo:
But : comprendre les raisons des divergences observées dans le tracé des volumes cibles entre radio-oncologues. Matériel et méthodes : 18 centres suisses de radio-oncologie ont été invités à tracer les volumes pour un cas de cancer de la prostate et pour un cas de cancer de la sphère ORL. Nous avons également envoyé un questionnaire pour évaluer d'une part les différences dans la définition- des volumes (GTV [ gross tumor volume= volume tumoral macroscopique ], CTV [clinical tumor volume= volume de la tumeur clinique, macroscopique et microscopique], PTV [planning target volume= volume cible pour la planification], et d'autre part des variations dans les marges appliquées et les ganglions considérés à risque. Pour chaque centre, on a calculé la corrélation entre les marges qui ont été dessinées et celles qui ont été annoncées. Nous avons inclus dans le questionnaire une série de questions non spécifiques pour évaluer les méthodes de planification utilisées dans les différents centres. Résultats : Dans les 2 situations cliniques, on a mis en évidence de relativement grandes différences tant au niveau des volumes dessinés par les différents centres que dans leur définition des volumes. La corrélation entre les marges dessinées et définies était assez correcte dans le cas de la prostate mais médiocre dans le cas ORL. Le questionnaire a révélé d'importantes différences dans les méthodes de planification utilisées par les centres. Conclusion : Ces grandes différences peuvent être expliquées par, (1) une connaissance/interprétation variable des définitions ICRU, (2) des appréciations différentes de l'extension tumorale microscopique potentielle, (3) des difficultés dans l'identification du GTV, (4) des différences de concept, et (5) des différences entre la théorie (par ex. la description des marges) et la pratiqué (par ex. les marges dessinées).
Resumo:
O objetivo deste trabalho foi estimar a biomassa sustentável de juvenis de pirarucu Arapaima gigas (Cuvier, 1829) mantidos em tanquesrede de pequeno volume. Durante 200 dias os peixes foram estocados em quatro tanques-rede de 1 m³, cada um com biomassa inicial total de 0,84±0,14 kg (21 peixes/tanque-rede). Os tanquesrede foram colocados em um viveiro de 50 m² com renovação constante de água. Os índices do fator de condição, da conversão alimentar, do crescimento específico e do ganho de biomassa revelaram que a biomassa sustentável de juvenis de pirarucu para a criação intensiva em tanques-rede de 1 m³ foi de aproximadamente 29 kg. O comprimento alcançado pelo peixe, no espaço reduzido do tanque-rede, é um fator limitante para manter bons índices zootécnicos.