In this paper, the placement of sectionalizers, as well as, a cross-connection is optimally determined so that the objective function is minimized. The objective function employed in this paper consists of two main parts, the switch cost and the reliability cost. The switch cost is composed of the cost of sectionalizers and cross-connection and the reliability cost is assumed to be proportional to a reliability index, SAIDI. To optimize the allocation of sectionalizers and cross-connection problem realistically, the cost related to each element is considered as discrete. In consequence of binary variables for the availability of sectionalizers, the problem is extremely discrete. Therefore, the probability of local minimum risk is high and a heuristic-based optimization method is needed. A Discrete Particle Swarm Optimization (DPSO) is employed in this paper to deal with this discrete problem. Finally, a testing distribution system is used to validate the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Isolation of a faulted segment, from either side of a fault, in a radial feeder that has several converter interfaced DGs is a challenging task when current sensing protective devices are employed. The protective device, even if it senses a downstream fault, may not operate if fault current level is low due to the current limiting operation of converters. In this paper, a new inverse type relay is introduced based on line admittance measurement to protect a distribution network, which has several converter interfaced DGs. The basic operation of this relay, its grading and reach settings are explained. Moreover a method is proposed to compensate the fault resistance such that the relay operation under this condition is reliable. Then designed relay performances are evaluated in a radial distribution network. The results are validated through PSCAD/EMTDC simulation and MATLAB calculations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the region of self-organized criticality (SOC) interdependency between multi-agent system components exists and slight changes in near-neighbor interactions can break the balance of equally poised options leading to transitions in system order. In this region, frequency of events of differing magnitudes exhibits a power law distribution. The aim of this paper was to investigate whether a power law distribution characterized attacker-defender interactions in team sports. For this purpose we observed attacker and defender in a dyadic sub-phase of rugby union near the try line. Videogrammetry was used to capture players’ motion over time as player locations were digitized. Power laws were calculated for the rate of change of players’ relative position. Data revealed that three emergent patterns from dyadic system interactions (i.e., try; unsuccessful tackle; effective tackle) displayed a power law distribution. Results suggested that pattern forming dynamics dyads in rugby union exhibited SOC. It was concluded that rugby union dyads evolve in SOC regions suggesting that players’ decisions and actions are governed by local interactions rules.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a method of enhancing system stability with a distribution static compensator (DSTATCOM) in an autonomous microgrid with multiple distributed generators (DG). It is assumed that there are both inertial and non-inertial DGs connected to the microgrid. The inertial DG can be a synchronous machine of smaller rating while inertia less DGs (solar) are assumed as DC sources. The inertia less DGs are connected through Voltage Source Converter (VSC) to the microgrid. The VSCs are controlled by either state feedback or current feedback mode to achieve desired voltage-current or power outputs respectively. The power sharing among the DGs is achieved by drooping voltage angle. Once the reference for the output voltage magnitude and angle is calculated from the droop, state feedback controllers are used to track the reference. The angle reference for the synchronous machine is compared with the output voltage angle of the machine and the error is fed to a PI controller. The controller output is used to set the power reference of the synchronous machine. The rate of change in the angle in a synchronous machine is restricted by the machine inertia and to mimic this nature, the rate of change in the VSCs angles are restricted by a derivative feedback in the droop control. The connected distribution static compensator (DSTATCOM) provides ride through capability during power imbalance in the microgrid, especially when the stored energy of the inertial DG is not sufficient to maintain stability. The inclusion of the DSATCOM in such cases ensures the system stability. The efficacies of the controllers are established through extensive simulation studies using PSCAD.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A comprehensive voltage imbalance sensitivity analysis and stochastic evaluation based on the rating and location of single-phase grid-connected rooftop photovoltaic cells (PVs) in a residential low voltage distribution network are presented. The voltage imbalance at different locations along a feeder is investigated. In addition, the sensitivity analysis is performed for voltage imbalance in one feeder when PVs are installed in other feeders of the network. A stochastic evaluation based on Monte Carlo method is carried out to investigate the risk index of the non-standard voltage imbalance in the network in the presence of PVs. The network voltage imbalance characteristic based on different criteria of PV rating and location and network conditions is generalized. Improvement methods are proposed for voltage imbalance reduction and their efficacy is verified by comparing their risk index using Monte Carlo simulations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, the placement and sizing of Distributed Generators (DG) in distribution networks are determined optimally. The objective is to minimize the loss and to improve the reliability. The constraints are the bus voltage, feeder current and the reactive power flowing back to the source side. The placement and size of DGs are optimized using a combination of Discrete Particle Swarm Optimization (DPSO) and Genetic Algorithm (GA). This increases the diversity of the optimizing variables in DPSO not to be stuck in the local minima. To evaluate the proposed algorithm, the semi-urban 37-bus distribution system connected at bus 2 of the Roy Billinton Test System (RBTS), which is located at the secondary side of a 33/11 kV distribution substation, is used. The results finally illustrate the efficiency of the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An algorithm based on the concept of Kalman filtering is proposed in this paper for the estimation of power system signal attributes, like amplitude, frequency and phase angle. This technique can be used in protection relays, digital AVRs, DSTATCOMs, FACTS and other power electronics applications. Furthermore this algorithm is particularly suitable for the integration of distributed generation sources to power grids when fast and accurate detection of small variations of signal attributes are needed. Practical considerations such as the effect of noise, higher order harmonics, and computational issues of the algorithm are considered and tested in the paper. Several computer simulations are presented to highlight the usefulness of the proposed approach. Simulation results show that the proposed technique can simultaneously estimate the signal attributes, even if it is highly distorted due to the presence of non-linear loads and noise.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an analysis of phasor measurement method for tracking the fundamental power frequency to show if it has the performance necessary to cope with the requirements of power system protection and control. In this regard, several computer simulations presenting the conditions of a typical power system signal especially those highly distorted by harmonics, noise and offset, are provided to evaluate the response of the Phasor Measurement (PM) technique. A new method, which can shorten the delay of estimation, has also been proposed for the PM method to work for signals free of even-order harmonics.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Introduction: The core business of public health is to protect and promote health in the population. Public health planning is the means to maximise these aspirations. Health professionals develop plans to address contemporary health priorities as the evidence about changing patterns of mortality and morbidity is presented. Officials are also alert to international trends in patterns of disease that have the potential to affect the health of Australians. Integrated planning and preparation is currently underway involving all emergency health services, hospitals and population health units to ensure Australia's quick and efficient response to any major infectious disease outbreak, such as avian influenza (bird flu). Public health planning for the preparations for the Sydney Olympics and Paralympic Games in 2000 took almost three years. ‘Its major components included increased surveillance of communicable disease; presentations to sentinel emergency departments; medical encounters at Olympic venues; cruise ship surveillance; environmental and food safety inspections; bioterrorism surveillance and global epidemic intelligence’ (Jorm et al 2003, 102). In other words, the public health plan was developed to ensure food safety, hospital capacity, safe crowd control, protection against infectious diseases, and an integrated emergency and disaster plan. We have national and state plans for vaccinating children against infectious diseases in childhood; plans to promote dental health for children in schools; and screening programs for cervical, breast and prostate cancer. An effective public health response to a change in the distribution of morbidity and mortality requires planning. All levels of government plan for the public’s health. Local governments (councils) ensure healthy local environments to protect the public’s health. They plan parks for recreation, construct traffic-calming devices near schools to prevent childhood accidents, build shade structures and walking paths, and even embed drafts/chess squares in tables for people to sit and play. Environmental Health officers ensure food safety in restaurants and measure water quality. These public health measures attempt to promote the quality of life of residents. Australian and state governments produce plans that protect and promote health through various policy and program initiatives and innovations. To be effective, program plans need to be evaluated. However, building an integrated evaluation plan into a program plan is often forgotten, as planning and evaluation are seen as two distinct entities. Consequently, it is virtually impossible to measure, with any confidence, the extent to which a program has achieved its goals and objectives. This chapter introduces you to the concepts of public health program planning and evaluation. Case studies and reflection questions are presented to illustrate key points. As various authors use different terminology to describe the same concepts/actions of planning and evaluation, the glossary at the back of this book will help you to clarify the terms used in this chapter.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The previously distinct boundary between airports and their cities has become increasingly blurred as new interests and actors are identified as important stakeholders in the decision making process. As a consequence airport entities are more than ever seeking an integrated existence with their surrounding regions. While current planning strategies provide insights on how to improve and leverage land use planning in and around airports, emerging challenges for implementing and protecting these planning ideals stem from the governance shadows of development decisions. The thesis of this paper is that improving the identification, articulation and consideration of city and airport interests in the development approval process (between planning and implementation) can help avoid outcomes that hinder the ability of cities and their airports to meet their separate/mutual long-term objectives. By applying a network governance perspective to the pilot case study of Brisbane, analysis of overlapping and competing actor interests show how different governance arrangements facilitate (or impede) decision making that protects sustainable ‘airport region’ development. ---------- Contributions are made to airport and city development decision makers through the identification and analysis of effective and ineffective decision making pathways, and to governance literature by way of forwarding empirically derived frameworks for showing how actors protect their interests in the ‘crowded decision making domain’ of airport region development. This work was carried out through the Airport Metropolis Research Project under the Australian Research Council’s Linkage Projects funding scheme (LP0775225).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, the optimal allocation and sizing of distributed generators (DGs) in a distribution system is studied. To achieve this goal, an optimization problem should be solved in which the main objective is to minimize the DGs cost and to maximise the reliability simultaneously. The active power balance between loads and DGs during the isolation time is used as a constraint. Another point considered in this process is the load shedding. It means that if the summation of DGs active power in a zone, isolated by the sectionalizers because of a fault, is less than the total active power of loads located in that zone, the program start shedding the loads in one-by-one using the priority rule still the active power balance is satisfied. This assumption decreases the reliability index, SAIDI, compared with the case loads in a zone are shed when total DGs power is less than the total load power. To validate the proposed method, a 17-bus distribution system is employed and the results are analysed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Despite the general evolution and broadening of the scope of the concept of infrastructure in many other sectors, the energy sector has maintained the same narrow boundaries for over 80 years. Energy infrastructure is still generally restricted in meaning to the transmission and distribution networks of electricity and, to some extent, gas. This is especially true in the urban development context. This early 20th century system is struggling to meet community expectations that the industry itself created and fostered for many decades. The relentless growth in demand and changing political, economic and environmental challenges require a shift from the traditional ‘predict and provide’ approach to infrastructure which is no longer economically or environmentally viable. Market deregulation and a raft of demand and supply side management strategies have failed to curb society’s addiction to the commodity of electricity. None of these responses has addressed the fundamental problem. This chapter presents an argument for the need for a new paradigm. Going beyond peripheral energy efficiency measures and the substitution of fossil fuels with renewables, it outlines a new approach to the provision of energy services in the context of 21st century urban environments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Islanded operation, protection, reclosing and arc extinguishing are some of the challenging issues related to the connection of converter interfaced distributed generators (DGs) into a distribution network. The isolation of upstream faults in grid connected mode and fault detection in islanded mode using overcurrent devices are difficult. In the event of an arc fault, all DGs must be disconnected in order to extinguish the arc. Otherwise, they will continue to feed the fault, thus sustaining the arc. However, the system reliability can be increased by maximising the DG connectivity to the system: therefore, the system protection scheme must ensure that only the faulted segment is removed from the feeder. This is true even in the case of a radial feeder as the DG can be connected at various points along the feeder. In this paper, a new relay scheme is proposed which, along with a novel current control strategy for converter interfaced DGs, can isolate permanent and temporary arc faults. The proposed protection and control scheme can even coordinate with reclosers. The results are validated through PSCAD/EMTDC simulation and MATLAB calculations.