975 resultados para digital resources
Resumo:
There is an increasing demand for highly dynamic realtime systems where several independently developed applications with different timing requirements can coexist. This paper proposes a protocol to integrate shared resources and precedence constraints among tasks in such systems assuming no precise information on critical sections and computation times is available. The concept of bandwidth inheritance is combined with a capacity sharing and stealing mechanism to efficiently exchange bandwidth among needed tasks, minimising the cost of blocking.
Resumo:
This paper proposes a new strategy to integrate shared resources and precedence constraints among real-time tasks, assuming no precise information on critical sections and computation times is available. The concept of bandwidth inheritance is combined with a greedy capacity sharing and stealing policy to efficiently exchange bandwidth among tasks, minimising the degree of deviation from the ideal system's behaviour caused by inter-application blocking. The proposed capacity exchange protocol (CXP) focus on exchanging extra capacities as early, and not necessarily as fairly, as possible. This loss of optimality is worth the reduced complexity as the protocol's behaviour nevertheless tends to be fair in the long run and outperforms other solutions in highly dynamic scenarios, as demonstrated by extensive simulations.
Resumo:
Environment monitoring has an important role in occupational exposure assessment. However, due to several factors is done with insufficient frequency and normally don´t give the necessary information to choose the most adequate safety measures to avoid or control exposure. Identifying all the tasks developed in each workplace and conducting a task-based exposure assessment help to refine the exposure characterization and reduce assessment errors. A task-based assessment can provide also a better evaluation of exposure variability, instead of assessing personal exposures using continuous 8-hour time weighted average measurements. Health effects related with exposure to particles have mainly been investigated with mass-measuring instruments or gravimetric analysis. However, more recently, there are some studies that support that size distribution and particle number concentration may have advantages over particle mass concentration for assessing the health effects of airborne particles. Several exposure assessments were performed in different occupational settings (bakery, grill house, cork industry and horse stable) and were applied these two resources: task-based exposure assessment and particle number concentration by size. The results showed interesting results: task-based approach applied permitted to identify the tasks with higher exposure to the smaller particles (0.3 μm) in the different occupational settings. The data obtained allow more concrete and effective risk assessment and the identification of priorities for safety investments.
Resumo:
Purpose: To assess image quality using PGMI (perfect, good, moderate, inadequate) scale in digital mammography examinations acquired in DR systems. Identify the main failures and propose corrective actions. Evaluate the most typical breast density. Methods and Materials: Clinical image quality criteria were evaluated considering mammograms acquired in 13 DR systems and classified according to PGMI scale using the criteria described in European Commission guidelines for radiographers. The breast density was assessed according to ACR recommendations. The data were collected on the acquisition system monitor to reproduce the daily practice of the radiographer. Results: The image quality criteria were evaluated in 3044 images. The criteria were fully achieved in 41% of the images that were classified as P (perfect), 31 % of the images were classified as M (moderate), 20% G (good) and 9% I (inadequate). The main cause of inadequate image quality was absence of all breast tissue in the image, skin folders in the pectoral muscle and in the infra-mammary angle. The higher number of failures occurred in MLO projections (809 out of 1022). The most represented (36%) breast type was type 2 (25-50% glandular tissue). Conclusion: Incorrect radiographic technique was frequently detected suggesting potential training needs and poor communication between the team members (radiographer and radiologists). Further correlations are necessary to identify the main causes for the failures, namely specific education and training in digital mammography and workload.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores
Resumo:
In an increasingly competitive and globalized world, companies need effective training methodologies and tools for their employees. However, selecting the most suitable ones is not an easy task. It depends on the requirements of the target group (namely time restrictions), on the specificities of the contents, etc. This is typically the case for training in Lean, the waste elimination manufacturing philosophy. This paper presents and compares two different approaches to lean training methodologies and tools: a simulation game based on a single realistic manufacturing platform, involving production and assembly operations that allows learning by playing; and a digital game that helps understand lean tools. This paper shows that both tools have advantages in terms of trainee motivation and knowledge acquisition. Furthermore, they can be used in a complementary way, reinforcing the acquired knowledge.
Resumo:
Objectives - To identify occupational stressors and coping resources in a group of physiotherapists, and to analyse interactions between subjective levels of stress, efficacy in stress resolution and coping resources used by these professionals. Design - A sample of 55 physiotherapists working in three general hospitals in Portugal completed the Coping Resources Inventory for Stress, the Occupational Stressors Inventory and two subjective scales for stress and stress resolution. Main results - Most physiotherapists perceived that they were moderately stressed (19/55, 35%) or stressed (20/55, 36%) due to work, and reported that their efficacy in stress resolution was moderate (25/54, 46%) or efficient (23/54, 42%). Issues related to lack of professional autonomy, lack of organisation in the hierarchical command chain, lack of professional and social recognition, disorganisation in task distribution and interpersonal conflicts with superiors were identified as the main sources of stress. The most frequently used coping resources were social support, stress monitoring, physical health and structuring. Perceived efficacy in stress resolution was inversely related to perceived level of occupational stress (r = −0.61, P < 0.01). Significant correlations were found between several coping resources and the perceived level of stress and efficacy in stress resolution. Associations between problem solving, cognitive restructuring and stress monitoring and both low levels of perceived stress and high levels of perceived efficacy were particularly strong. Implications for practice - The importance of identifying stressors and coping resources related to physiotherapists’ occupational stress, and the need for the development of specific training programmes to cope with stress are supported.
Resumo:
The process of resources systems selection takes an important part in Distributed/Agile/Virtual Enterprises (D/A/V Es) integration. However, the resources systems selection is still a difficult matter to solve in a D/A/VE, as it is pointed out in this paper. Globally, we can say that the selection problem has been equated from different aspects, originating different kinds of models/algorithms to solve it. In order to assist the development of a web prototype tool (broker tool), intelligent and flexible, that integrates all the selection model activities and tools, and with the capacity to adequate to each D/A/V E project or instance (this is the major goal of our final project), we intend in this paper to show: a formulation of a kind of resources selection problem and the limitations of the algorithms proposed to solve it. We formulate a particular case of the problem as an integer programming, which is solved using simplex and branch and bound algorithms, and identify their performance limitations (in terms of processing time) based on simulation results. These limitations depend on the number of processing tasks and on the number of pre-selected resources per processing tasks, defining the domain of applicability of the algorithms for the problem studied. The limitations detected open the necessity of the application of other kind of algorithms (approximate solution algorithms) outside the domain of applicability founded for the algorithms simulated. However, for a broker tool it is very important the knowledge of algorithms limitations, in order to, based on problem features, develop and select the most suitable algorithm that guarantees a good performance.
Resumo:
This paper presents a genetic algorithm-based approach for project scheduling with multi-modes and renewable resources. In this problem activities of the project may be executed in more than one operating mode and renewable resource constraints are imposed. The objective function is the minimization of the project completion time. The idea of this approach is integrating a genetic algorithm with a schedule generation scheme. This study also proposes applying a local search procedure trying to yield a better solution when the genetic algorithm and the schedule generation scheme obtain a solution. The experimental results show that this algorithm is an effective method for solving this problem.
Resumo:
European Master in Multimedia and Audiovisual Administration
Resumo:
Trabalho apresentado no âmbito do Mestrado em Engenharia Informática, como requisito parcial para obtenção do grau de Mestre em Engenharia Informática
Resumo:
Debugging electronic circuits is traditionally done with bench equipment directly connected to the circuit under debug. In the digital domain, the difficulties associated with the direct physical access to circuit nodes led to the inclusion of resources providing support to that activity, first at the printed circuit level, and then at the integrated circuit level. The experience acquired with those solutions led to the emergence of dedicated infrastructures for debugging cores at the system-on-chip level. However, all these developments had a small impact in the analog and mixed-signal domain, where debugging still depends, to a large extent, on direct physical access to circuit nodes. As a consequence, when analog and mixed-signal circuits are integrated as cores inside a system-on-chip, the difficulties associated with debugging increase, which cause the time-to-market and the prototype verification costs to also increase. The present work considers the IEEE1149.4 infrastructure as a means to support the debugging of mixed-signal circuits, namely to access the circuit nodes and also an embedded debug mechanism named mixed-signal condition detector, necessary for watch-/breakpoints and real-time analysis operations. One of the main advantages associated with the proposed solution is the seamless migration to the system-on-chip level, as the access is done through electronic means, thus easing debugging operations at different hierarchical levels.
Resumo:
A estereopsia é o 3º grau da visão binocular. Define-se pela perceção de profundidade e baseia-se na disparidade retiniana. Estereopsia global – estereograma de pontos aleatórios (perceção necessita de disparidade retiniana). Estereopsia local – estereogramas com contornos percebidos monocularmente (processo de fusão facilitado). Objectivos do estudo: 1) comparar valores de estereopsia obtidos em cada teste e analisar valores de estereopsia local e global; 2) estudar a correlação de valores de estereopsia nos testes (TNO goldstandard); 3) estudar a associação entre o resultado dos testes; 4) comparar exatidão entre FlyTeste StereoTAB; 5) estudar a sensibilidade e a especificidade do FlyTeste StereoTAB; 6) averiguar a aplicabilidade do SteroTABna prática clínica.
Resumo:
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
Most definitions of virtual enterprise (VE) incorporate the idea of extended and collaborative outsourcing to suppliers and subcontractors in order to achieve a competitive response to market demands (Webster, Sugden, & Tayles, 2004). As suggested by several authors (Browne & Zhang, 1999; Byrne, 1993; Camarinha-Matos & Afsarmanesh, 1999; Cunha, Putnik, & Ávila, 2000; Davidow & Malone, 1992; Preiss, Goldman, & Nagel, 1996), a VE consists of a network of independent enterprises (resources providers) with reconfiguration capability in useful time, permanently aligned with the market requirements, created to take profit from a specific market opportunity, and where each participant contributes with its best practices and core competencies to the success and competitiveness of the structure as a whole. Even during the operation phase of the VE, the configuration can change, to assure business alignment with the market demands, traduced by the identification of reconfiguration opportunities and continuous readjustment or reconfiguration of the VE network, to meet unexpected situations or to keep permanent competitiveness and maximum performance (Cunha & Putnik, 2002, 2005a, 2005b).