968 resultados para digital projects
Resumo:
In power hardware in the loop (PHIL) simulations, a real-time simulated power system is interfaced to a piece of hardware, usually called hardware under test (HuT). A PHIL test can be realized using several simulation tools. Among them Real Time Digital Simulator (RTDS) is an ideal tool to perform complex power system simulations in near real-time. Stable operation of the entire system, along with the accuracy of simulation results are the main concerns regarding a PHIL simulation. In this paper, a simulated power network on RTDS will be interfaced to HuT through a voltage source converter (VSC). Issues around stability and other interface problems are studied and a new method to stabilize some unstable PHIL cases is proposed. PHIL simulation results in PSCAD and RSCAD are presented.
Resumo:
The role of Information and Communications Technology (ICT) has been identified as an important factor by the United Nations in achieving the millennium development goals (UNAPCICT, 2012)1. The potential for ICT has been identified as a means to reducing poverty, creating global communities by providing access to the internet and mobile networks to rural communities, improving education services, medical services, and information availability. As of today, significant amounts of funds have been invested by the governments and donor organizations in ‘Information and Communication Technologies for Development (ICT4D)’projects by establishing telecenters, e-villages, e-health, electronic and mobile banking, and egovernment systems for citizens in general, and more specifically, rural communities to bridge the digital divide (Heeks & Molla, 2009).
Resumo:
An evolution in the use of digital modelling has occurred in the Queensland Department of Public Works Division of Project Services over the last 20 years from: the initial implementation of computer aided design and documentation (CADD); to experimentation with building information modelling (BIM); to embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) including the active involvement of consultants and contractors in the design/delivery process. This case study is one of three undertaken through the Australian Sustainable Built Environment National Research Centre investigating past R&D investment. The intent of these cases is to inform the development of policy guidelines for future investment in the construction industry in Australia. This research is informing the activities of CIB Task Group 85 R&D Investment and Impact. The uptake of digital modelling by Project Services has been approached through an incremental learning approach. This has been driven by a strong and clear vision with a focus on developing more efficient delivery mechanisms through the use of new technology coupled with process change. Findings reveal an organisational focus on several areas including: (i) strategic decision making including the empowerment of innovation leaders and champions; (ii) the acquisition and exploitation of knowledge; (iii) product and process development (with a focus on efficiency and productivity); (iv) organisational learning; (v) maximising the use of technology; and (vi) supply chain integration. Key elements of this approach include pilot projects, researcher engagement, industry partnerships and leadership.
Resumo:
This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme
Resumo:
SYN (Student Youth Network) is a media organisation run by people between the ages of 12 and 26. In this ‘coming of age story’, Ellie Rennie follows the SYNners as they build Australia’s most unusual media empire against enormous odds. Over the course of the book, social networking becomes the most popular use of the internet and traditional media institutions are forced to acknowledge the rise of amateur content. In response, SYN rethinks its approach to the online environment, kills its print publication, deals with the introduction of digital broadcasting and teaches schoolteachers about a new kind of literacy. In just two years dozens of careers are launched, the SYN radio audience doubles and they get told off for swearing. Life of SYN takes on the big issues of the media through the story of a small media organisation. This humorous and insightful book describes a media environment in flux, where audiences and producers express their freedom in unruly and contradictory ways. Life of SYN gives structure to the new media world without curtailing its inventiveness and possibility. Life of SYN combines story with media theory, encompassing: digital literacy and media participation; the future of community media; youth media and media industries.
Resumo:
In this presentation, renowned arts practitioner, Sean Mee, and Nigel Lavender, Executive Director of the Queensland Music Festival, talk about how community arts practice can be used to build cultural captial in communities, using examples such large-scale musicals such as The Road We're ON (Charleville) and Behind the Cand (Bowen), Mee and Lavender highlight the importance of community-driven narrative and particiaption.
Resumo:
Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects.
Resumo:
Dynamic capability theory asserts that the learning capabilities of construction organisations influence the degree to which value-for-money (VfM) is achieved on collaborative projects. However, there has been little study conducted to verify this relationship. The evidence is particularly limited within the empirical context of infrastructure delivery in Australia. Primarily drawing on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991), dynamic capabilities (e.g. Helfat et al. 2007), absorptive capacity (e.g. Lane et al. 2006) and knowledge management (e.g. Nonaka 1994), this paper conceptualises learning capability as a knowledge-based dynamic capability. Learning capability builds on the micro-foundations of high-order learning routines, which are deliberately developed by construction organisations for managing collaborative projects. Based on this conceptualisation of learning capability, an exploratory case study was conducted. The study investigated the operational and higher-order learning routines adopted by a project alliance team to successfully achieve VfM. The case study demonstrated that the learning routines of the alliance project were developed and modified by the continual joint learning activities of participant organisations. Project-level learning routines were found to significantly influence the development of organisational-level learning routines. In turn, the learning outcomes generated from the alliance project appeared to significantly influence the development of project management routines and contractual arrangements applied by the participant organisations in subsequent collaborative projects. The case study findings imply that the higher-order learning routines that underpin the learning capability of construction organisations have the potential to influence the VfM achieved on both current and future collaborative projects.
Resumo:
Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.
Resumo:
Now as in earlier periods of acute change in the media environment, new disciplinary articulations are producing new methods for media and communication research. At the same time, established media and communication studies meth- ods are being recombined, reconfigured, and remediated alongside their objects of study. This special issue of JOBEM seeks to explore the conceptual, political, and practical aspects of emerging methods for digital media research. It does so at the conjuncture of a number of important contemporary trends: the rise of a ‘‘third wave’’ of the Digital Humanities and the ‘‘computational turn’’ (Berry, 2011) associated with natively digital objects and the methods for studying them; the apparently ubiquitous Big Data paradigm—with its various manifestations across academia, business, and government — that brings with it a rapidly increasing interest in social media communication and online ‘‘behavior’’ from the ‘‘hard’’ sciences; along with the multisited, embodied, and emplaced nature of everyday digital media practice.
Resumo:
The green building trend has increased rapidly worldwide in recent decades as a means of addressing growing concerns over climate change and global warming and to reduce the impact of the building industry on the environment. A significant contribution in Australia is the use of a series of rating tools by the Green Building Council Australia (GBCA) for the certification of various types of buildings. This paper reviews the use of the Green Star system in Australian building construction, and investigates the potential challenges involved in acquiring the certification of Australian buildings by critically analysing a database of most recently certified GBCA projects. The results show that management-related credits and innovation-related credits are the easiest and most difficult respectively to obtain. Additionally, 6-Star green buildings achieve significantly higher points than other certified buildings in the Energy category. In contrast, 4 Star green buildings achieve more points in the Material category than 5 and 6 Star buildings. The study offers a useful reference for both property developers and project teams to obtain a better understanding of the rating scheme and consequently the effective preparation of certification documentation.
Resumo:
Media and Information Literacy is the focus of several teaching and research projects at Queensland University of Technology and there is particular emphasis placed on digital technologies and how they are used for communication, information use and learning in formal contexts such as schools. Research projects are currently taking place in several locations where investigators are collecting data on approaches to the use of digital media tools like cameras and editing systems, tablet computers and video games. This complements QUT’s teacher preparation courses, including preparation to implement UNESCO’s Online Course in Media and Information Literacy and Intercultural Dialogue in 2013. This work takes place in the context of projects occurring at the National level in Australia that continue to promote Media and Information Literacy.