1000 resultados para Hollow Section Joints


Relevância:

20.00% 20.00%

Publicador:

Resumo:

PURPOSE: The purpose of this work was to demonstrate the normal ligamentous and tendinous anatomy of the intermetacarpal (IMC) and common carpometacarpal (CCMC) joints with MRI and MR arthrography. METHOD: MR images of 22 wrists derived from fresh human cadavers were obtained before and after arthrography. The MR imaging features of the ligaments and tendons about the CCMC and IMC joints and the joints themselves were analyzed in a randomized fashion and correlated with those seen on anatomic sections. RESULTS: Six CCMC ligaments were visualized. The dorsal and palmar CCMC ligaments and the pisometacarpal ligament were best visualized in the sagittal plane. The radial and ulnar CCMC collateral ligaments and the capito-third metacarpal ligament were best visualized in the coronal plane. Three main IMC ligaments were observed: a dorsal and a palmar ligament and an interosseous ligament complex. All three ligaments were best visualized in the axial plane. Four tendinous insertions to the metacarpal bases were evident. CONCLUSION: The anatomy of the ligaments and tendinous insertions about the second to fifth IMC and the CCMC joints is well demonstrated by MR imaging and MR arthrography. MR arthrography does not significantly improve the visualization of these complex structures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Human Services in consultation with the Winnebago Tribe of Nebraska submits the following recommendations as directed by 2008 Iowa Acts, Chapter 1187, Section 5.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document is the DMC Section of Iowa’s 2007 JJDP Act formula grant three year plan update. The bulk of this 2007 plan is an “update” of the program plan completed since submission of the original 2006 plan. The Division of Criminal and Juvenile Justice Planning (CJJP) wrote Iowa’s three year plan update. CJJP is the state agency responsible for administering the JJDP Act in Iowa. Federal officials refer to state administering agencies as the state planning agency (SPA). The Plan was developed and approved by Iowa’s Juvenile Justice Advisory Council. That Council assists with administration of the JJDP Act, and also provides guidance and direction to the SPA, the Governor and the legislature regarding juvenile justice issues in Iowa. Federal officials refer to such state level groups as state advisory groups (SAG’s). The acronyms SPA and SAG are used through this report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document is the DMC Section of Iowa’s 2009 federal Juvenile Justice and Delinquency Prevention Act (JJDP Act) formula grant three year plan update. The Division of Criminal and Juvenile Justice Planning (CJJP) wrote this update. CJJP is the state agency responsible for administering the JJDP Act in Iowa. Federal officials refer to state administering agencies as the state planning agency (SPA). The Plan was developed and approved by Iowa’s Juvenile Justice Advisory Council. That Council assists with administration of the JJDP Act, and also provides guidance and direction to the SPA, the Governor and the legislature regarding juvenile justice issues in Iowa. Federal officials refer to such state level groups as state advisory groups (SAG’s). The acronyms SPA and SAG are used through this report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Premature deterioration of concrete at the joints in concrete pavements and parking lots has been reported across the northern states. The distress is first observed as shadowing when microcracking near the joints traps water, later exhibiting as significant loss of material. Not all roadways are distressed, but the problem is common enough to warrant attention. The aim of the work being conducted under this and parallel contracts was to improve understanding of the mechanisms behind premature joint deterioration and, based on this understanding, develop training materials and guidance documents to help practitioners reduce the risk of further distress and provide guidelines for repair techniques. While work is still needed to understand all of the details of the mechanisms behind premature deterioration and prevention of further distress, the work in this report has contributed to advancing the state of knowledge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document is the DMC Section of Iowa’s 2009 federal Juvenile Justice and Delinquency Prevention Act (JJDP Act) formula grant three year plan update. The Division of Criminal and Juvenile Justice Planning (CJJP) wrote this update. CJJP is the state agency responsible for administering the JJDP Act in Iowa. Federal officials refer to state administering agencies as the state planning agency (SPA). The Plan was developed and approved by Iowa’s Juvenile Justice Advisory Council. That Council assists with administration of the JJDP Act, and also provides guidance and direction to the SPA, the Governor and the legislature regarding juvenile justice issues in Iowa. Federal officials refer to such state level groups as state advisory groups (SAG’s). The acronyms SPA and SAG are used through this report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Per the guidance of the Legislative Elder Abuse Prevention and Intervention Interim Committee, a prioritization of the implementation recommendations and proposed legislation are below listed in the order determined in the 2012 Elder Abuse Task Force Report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many of the bridges in the state of Iowa have type ‘CF’, ‘EE’, or ‘EF’ expansion joints installed in the bridge approach slabs. These joints, which are typically 4” wide, are currently filled with a foam expansion joint material that is covered with a sealant. Over time the sealant begins to pull off of the walls of the joint and it ultimately fails. The joint, which is now exposed to the weather, is then filled with water and solids. The foam joint material, which is lighter than water, floats out of the joint onto the highway. This foam resembles a large 4” X 6” plank and poses a threat to motorists. A possible solution to this problem would be to replace the foam material with rubber buffings. Rubber buffings are a by-product of the tire retread industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Experiments with early entry light sawing of Portland cement concrete (PCC) contraction joints began in Iowa in 1989. Since that time, changes in early sawing equipment have occurred as well as changes in specifications for sawing. The option to use early sawing for transverse contraction joints was specified in 1992. A problem happening occasionally with early sawing was the break out of some of the concrete around the end of the joint as the saw blade approached the edge of the slab. To prevent this, it was proposed that the sawing would terminate approximately 1/2" to 3/4" before the edge of the slab, creating a "short joint". This procedure would also leave a concrete "dam" to prevent the run-out and waste of the hot liquid joint sealant onto the shoulder. It would also eliminate the need for the labor and material for applying a duct tape dam at the open ends of each sawed joint to stop hot liquid sealant run-out Agreements were made with the contractor to apply the "short joint" technique for 1 day of paving. The evaluation and results are compared with an adjoining control section. The research found no negative aspects from sawing the "short joint". Three specific findings were noted. They are the following: 1) No joint end "blow-out" spalls of concrete occurred. 2) The need for the duct tape dam to stop liquid sealant overflow was eliminated. 3) Joint end corner spalls appear to be caused mainly by construction shouldering operations equipment. The "short joint" sawing technique can be routinely applied to early entry sawed transverse contraction joints with expectations of only positive results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most pavement contraction joint seals in Iowa, in general, have been performing in less than a satisfactory manner. The effective life of the seals, in maintaining a watertight joint, has been only from two to five years. In search of improvements, research was proposed to evaluate preformed neoprene joint seals. The performance of those seals was to be compared mainly with the hot poured rubberized asphalt sealants and cold applied silicone sealants or other sealants commonly used at the time this research began. Joint designs and methods of sawing were also investigated. All evaluations were done in new portland cement concrete (PCC) pavements. Three projects were initially selected and each included a research section of joint sealing. Some additional sites were later added for evaluation. Several joint sealants were evaluated at each research site. The various sites included high, medium and low levels of traffic. Evaluations were done over a five-year period. Neoprene joint seals provided better performance than hot or cold field formed joints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Expansion joints increase both the initial cost and the maintenance cost of bridges. Integral abutment bridges provide an attractive design alternative because expansion joints are eliminated from the bridge itself. However, the piles in these bridges are subjected to horizontal movement as the bridge expands and contracts during temperature changes. The objective of this research was to develop a method of designing piles for these conditions. Separate field tests simulating a pile and a bridge girder were conducted for three loading cases: (1) vertical load only, (2) horizontal displacement of pile head only, and (3) combined horizontal displacement of pile head with subsequent vertical load. Both tests (1) and (3) reached the same ultimate vertical load, that is, the horizontal displacement had no effect on the vertical load capacity. Several model tests were conducted in sand with a scale factor of about 1:10. Experimental results from both the field and model tests were used to develop the vertical and horizontal load-displacement properties of the soil. These properties were input into the finite element computer program Integral Abutment Bridge Two-Dimensional (IAB2D), which was developed under a previous research contract. Experimental and analytical results compared well for the test cases. Two alternative design methods, both based upon the American Association of State Highway and Transportation Officials (AASHTO) Specification, were developed. Alternative One is quite conservative relative to IAB2D results and does not permit plastic redistribution of forces. Alternative Two is also conservative when compared to IAB2D, but plastic redistribution is permitted. To use Alternative Two, the pile cross section must have sufficient inelastic rotation capacity before local buckling occurs. A design example for a friction pile and an end-bearing pile illustrates both alternatives.