965 resultados para Process analysis


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Risk acceptance has been broadly discussed in relation to hazardous risk activities and/or technologies. A better understanding of risk acceptance in occupational settings is also important; however, studies on this topic are scarce. It seems important to understand the level of risk that stakeholders consider sufficiently low, how stakeholders form their opinion about risk, and why they adopt a certain attitude toward risk. Accordingly, the aim of this study is to examine risk acceptance in regard to occupational accidents in furniture industries. The safety climate analysis was conducted through the application of the Safety Climate in Wood Industries questionnaire. Judgments about risk acceptance, trust, risk perception, benefit perception, emotions, and moral values were measured. Several models were tested to explain occupational risk acceptance. The results showed that the level of risk acceptance decreased as the risk level increased. High-risk and death scenarios were assessed as unacceptable. Risk perception, emotions, and trust had an important influence on risk acceptance. Safety climate was correlated with risk acceptance and other variables that influence risk acceptance. These results are important for the risk assessment process in terms of defining risk acceptance criteria and strategies to reduce risks.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, the concrete production sector is challenged by attempts to minimize the usage of raw materials and energy consumption, as well as by environmental concerns. Therefore, it is necessary to choose better options, e.g. new technologies or materials with improved life-cycle performance. One solution for using resources in an efficient manner is to close the materials' loop through the recycling of materials that result either from the end-of-life of products or from being the by-product of an industrial process. It is well known that the production of Portland cement, one of the materials most used in the construction sector, has a significant contribution to the environmental impacts, mainly related with carbon dioxide emission. Therefore, the study and utilization of by-products or wastes usable as cement replacement in concrete can supply more sustainable options, provided that these type of concrete produced has same durability and equivalent quality properties as standard concrete. This work studied the environmental benefits of incorporating different percentages of two types of fly ashes that can be used in concrete as cement replacement. These ashes are waste products of power and heat production sectors using coal or biomass as fuels. The results showed that both ashes provide a benefit for the concrete production both in terms of environmental impact minimization and a better environmental performance through an increase in cement replacement. It is possible to verify that the incorporation of fly ashes is a sustainable option for cement substitution and a possible path to improve the environmental performance of the concrete industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A Zero waste management is believed to be one of methods to gain sustainability in urban areas. Take advantages of resources as enough as the needs and process it until the last part to be wasted is a contribution to take care the environment for the next generation. Reduce, reuse, and recycle are three simplesactivities which are until nowadays consideredas the back bone of zero waste. Jonggolgreen city is a new urban area in Indonesia with a 100 ha of surface area zoned as education tourism area. It is an independent area with pure natural resources of water, air, and land to be managed and protected. It is planned as green city through zero waste management since2013. In this preliminary period, a monitoring tool is being prepared by applying a Life Cycle Analysis (LCA) for urban areas [1]. This paper will present an explanatory assessment ofthe zero waste management for Jonggolgreen city. The existing situation will be examined through LCA and afterwards,the new program and the proposed green design to gain the next level of zero waste will be discussed. The purpose is to track the persistence of the commitment and the perception of the necessary innovationsin order to achieve the ideal behavior level of LCA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Due to the increasing acceptance of BPM, nowadays BPM tools are extensively used in organizations. Core to BPM are the process modeling languages, of which BPMN is the one that has been receiving most attention these days. Once a business process is described using BPMN, one can use a process simulation approach in order to find its optimized form. In this context, the simulation of business processes, such as those defined in BPMN, appears as an obvious way of improving processes. This paper analyzes the business process modeling and simulation areas, identifying the elements that must be present in the BPMN language in order to allow processes described in BPMN to be simulated. During this analysis a set of existing BPM tools, which support BPMN, are compared regarding their limitations in terms of simulation support.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper analyzes the safety, environmental and occupational health of workers in the small construction industry in Brazil. In this sector there are still many unsafe practices, which are very common in small work sites. We used a qualitative approach to understand these problems by long interviews with people who work directly in small construction sites, including occupational physicians, civil engineers, safety engineers, safety technicians, general foremen, construction workers, labor unionists and auditors. This paper aims to demonstrate that the "invisibility" of the small sites workers makes them less safe and therefore more prone to accidents, also weakening their health. The results show that small constructions workers are less visible to society and supervision because of their short periods of work. Therefore, they are also uncovered to the rigorous applicability of principles of safety and accident prevention. Thus, it has been seen in this field of work a precarious application of NR - 18, which was specifically made for the construction sites and it needs simplification to meet normative characteristics of small construction sites. In the State of Rio de Janeiro, some laws on small sites were recently created and implemented. This study concludes that the rules to work are not being taken as seriously as the legislation determinates, remaining practically unknown by many professionals, from the plot command, supervisors, engineers, architects and technicians who work on construction sites. This ignorance creates space for the lack of safety and consequently to accidents, leading to by weakness in the workers health. Therefore, the work process needs to be modified, the safety regulation must be disseminated through safer practices, promoting employee health and ensure that the work of small sites can be visible, especially ensuring the construction workers health and safety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although most of the accidents occurred in Olive Oil Mill (OOM) resulted from “basic” risks, there is a need to apply adequate tools to support risk decisions that can meet the specificities of this sector. This study aims to analyse the views of Occupational, Safety & Health (OSH) practitioners about the risk assessment process in OOM, identifying the key difficulties inherent to the risk assessment process in these sector, as well as identifying some improvements to the current practice. This analysis was based on a questionnaire that was developed and applied to 13 OSH practitioners working at OOM. The results showed that the time available to perform the risk assessment is the more frequent limitation. They believe that the methodologies available are not an important limitation to this process. However, a specific risk assessment methodology, that includes acceptance criteria adjusted to the OOM reality, using risk metrics supported on the frequency of accidents and workdays lost, were indicated as being also an important contributions improve the process. A semi-quantitative approach, complemented with the use of the sector accident statistics, can be a good solution for this sector. However, further strategies should also be adopted, mainly those that can lead to an easy application of the risk assessment process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Children are an especially vulnerable population, particularly in respect to drug administration. It is estimated that neonatal and pediatric patients are at least three times more vulnerable to damage due to adverse events and medication errors than adults are. With the development of this framework, it is intended the provision of a Clinical Decision Support System based on a prototype already tested in a real environment. The framework will include features such as preparation of Total Parenteral Nutrition prescriptions, table pediatric and neonatal emergency drugs, medical scales of morbidity and mortality, anthropometry percentiles (weight, length/height, head circumference and BMI), utilities for supporting medical decision on the treatment of neonatal jaundice and anemia and support for technical procedures and other calculators and widespread use tools. The solution in development means an extension of INTCare project. The main goal is to provide an approach to get the functionality at all times of clinical practice and outside the hospital environment for dissemination, education and simulation of hypothetical situations. The aim is also to develop an area for the study and analysis of information and extraction of knowledge from the data collected by the use of the system. This paper presents the architecture, their requirements and functionalities and a SWOT analysis of the solution proposed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The monitoring data collected during tunnel excavation can be used in inverse analysis procedures in order to identify more realistic geomechanical parameters that can increase the knowledge about the interested formations. These more realistic parameters can be used in real time to adapt the project to the real structure in situ behaviour. However, monitoring plans are normally designed for safety assessment and not especially for the purpose of inverse analysis. In fact, there is a lack of knowledge about what types and quantity of measurements are needed to succeed in identifying the parameters of interest. Also, the optimisation algorithm chosen for the identification procedure may be important for this matter. In this work, this problem is addressed using a theoretical case with which a thorough parametric study was carried out using two optimisation algorithms based on different calculation paradigms, namely a conventional gradient-based algorithm and an evolution strategy algorithm. Calculations were carried for different sets of parameters to identify several combinations of types and amount of monitoring data. The results clearly show the high importance of the available monitoring data and the chosen algorithm for the success rate of the inverse analysis process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The MAP-i Doctoral Program of the Universities of Minho, Aveiro and Porto

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Lecture Notes in Computer Science, 9309

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The building sector is one of the Europeâ s main energy consumer, making buildings an important target for a wiser energy use, improving indoor comfort conditions and reducing the energy consumption. To achieve the European Union targets for energy consumption and carbon reductions it is crucial to act in new, but also in existing buildings, which constitute the majority of the building stock. In existing buildings, the significant improvement of their efficiency requires important investments. Therefore, costs are a major concern in the decision making process and the analysis of the cost effectiveness of the interventions is an important path in the guidance for the selection of the different renovation scenarios. The Portuguese thermal legislation considers the simple payback method for the calculations of the time for the return of the investment. However, this method does not take into consideration inflation, cash flows and cost of capital, as well as the future costs of energy and the building elements lifetime as it happens in a life cycle cost analysis. In order to understand the impact of the economic analysis method used in the choice of the renovation measures, a case study has been analysed using simple payback calculations and life cycle costs analysis. Overall results show that less far-reaching renovation measures are indicated when using the simple payback calculations which may be leading to solutions less cost-effective in a long run perspective.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: An autoimmune disease is characterized by tissue damage, caused by self-reactivity of different effector mechanisms of the immune system, namely antibodies and T cells. All autoimmune diseases, to some extent, have implications for fertility and obstetrics. Currently, due to available treatments and specialised care for pregnant women with autoimmune disease, the prognosis for both mother and child has improved significantly. However these pregnancies are always high risk. The purpose of this study is to analyse the fertility/pregnancy process of women with systemic and organ-specific autoimmune diseases and assess pathological and treatment implications. METHODS: The authors performed an analysis of the clinical records and relevant obstetric history of five patients representing five distinct autoimmune pathological scenarios, selected from Autoimmune Disease Consultation at the Hospital of Braga, and reviewed the literature. RESULTS: The five clinical cases are the following: Case 1-28 years old with systemic lupus erythematosus, and clinical remission of the disease, under medication with hydroxychloroquine, prednisolone and acetylsalicylic acid, with incomplete miscarriage at 7 weeks of gestation without signs of thrombosis. Case 2-44 years old with history of two late miscarriages, a single preterm delivery (33 weeks) and multiple thrombotic events over the years, was diagnosed with antiphospholipid syndrome after acute myocardial infarction. Case 3-31 years old with polymyositis, treated with azathioprine for 3 years with complete remission of the disease, took the informed decision to get pregnant after medical consultation and full weaning from azathioprine, and gave birth to a healthy term new-born. Case 4-38 years old pregnant woman developed Behcet's syndrome during the final 15 weeks of gestation and with disease exacerbation after delivery. Case 5-36 years old with autoimmune thyroiditis diagnosed during her first pregnancy, with difficult control over the thyroid function over the years and first trimester miscarriage, suffered a second miscarriage despite clinical stability and antibody regression. CONCLUSIONS: As described in literature, the authors found a strong association between autoimmune disease and obstetric complications, especially with systemic lupus erythematosus, antiphospholipid syndrome and autoimmune thyroiditis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia e Gestão Industrial

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Mechanical Engineering

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia e Gestão de Sistemas de Informação