999 resultados para Allegheny Valley Railway Company


Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a continuing need to improve safety at Railway Level Crossings (RLX) particularly those that do not have gates and lights regulating traffic flow. A number of Intelligent Transport System (ITS) interventions have been proposed to improve drivers’ awareness and reduce errors in detecting and responding appropriately at level crossings. However, as with other technologies, successful implementation and ultimately effectiveness rests with the acceptance of the technology by the end user. In the current research, four focus groups were held (n=38) with drivers in metropolitan and regional locations in Queensland to examine their perceptions of potential in-vehicle and road-based ITS interventions to improve safety at RLX. The findings imply that further development of the ITS interventions, in particular the design and related promotion of the final product, must consider ease of use, usefulness and relative cost.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Valley Mountain 15’ quadrangle straddles the Pinto Mountain Fault, which bounds the eastern Transverse Ranges in the south against the Mojave Desert province in the north. The Pinto Mountains, part of the eastern Transverse Ranges in the south part of the quadrangle expose a series of Paleoproterozoic gneisses and granite and the Proterozoic quartzite of Pinto Mountain. Early Triassic quartz monzonite intruded the gneisses and was ductiley deformed prior to voluminous Jurassic intrusion of diorite, granodiorite, quartz monzonite, and granite plutons. The Jurassic rocks include part of the Bullion Mountains Intrusive Suite, which crops out prominently at Valley Mountain and in the Bullion Mountains, as well as in the Pinto Mountains. Jurassic plutons in the southwest part of the quadrangle are deeply denuded from midcrustal emplacement levels in contrast to supracrustal Jurassic limestone and volcanic rocks exposed in the northeast. Dikes inferred to be part of the Jurassic Independence Dike Swarm intrude the Jurassic plutons and Proterozoic rocks. Late Cretaceous intrusion of the Cadiz Valley Batholith in the northeast caused contact metamorphism of adjacent Jurassic plutonic rocks...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the latter half of the nineteenth century the railway became an emblem of technological advancement, stood for the improvement and progression of European life, and became a recognizable symbol for the achievements of governments and citizens. The implementation and use of the railway became closely linked with notions of national identity and character. The railway became an identifiable artefact in official history but at the same time it became a part of everyday life. Richard Flanagan’s Gould’s Book of Fish retells the life-story of a fictionalized convict sent to Sarah Island and who paints fish, eventually he metamorphoses into one. It could be thought that a novel set in convict times would have little to do with notions of national identity, technological advancement, and railway travel. However, Richard Flanagan, in this very complex, almost surreal, novel, has used the construction of a fictional national railway as one of the ways to explore Australia's complex relationship with history and space. The novel tells of the plans of a history-loving Commandant and his desire to build a national railway on Sarah Island. This paper explores how Sarah Island becomes a metonym for Australia as a whole and Flanagan's novel takes on a metaphysical dimension as he reveals the struggles that emerge when official history collides with non-official versions. The fabulations of the novel contribute to an historical reconstruction of the spatial/architectural history of the Tasmanian colonial project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Railway crew scheduling problem is the process of allocating train services to the crew duties based on the published train timetable while satisfying operational and contractual requirements. The problem is restricted by many constraints and it belongs to the class of NP-hard. In this paper, we develop a mathematical model for railway crew scheduling with the aim of minimising the number of crew duties by reducing idle transition times. Duties are generated by arranging scheduled trips over a set of duties and sequentially ordering the set of trips within each of duties. The optimisation model includes the time period of relief opportunities within which a train crew can be relieved at any relief point. Existing models and algorithms usually only consider relieving a crew at the beginning of the interval of relief opportunities which may be impractical. This model involves a large number of decision variables and constraints, and therefore a hybrid constructive heuristic with the simulated annealing search algorithm is applied to yield an optimal or near-optimal schedule. The performance of the proposed algorithms is evaluated by applying computational experiments on randomly generated test instances. The results show that the proposed approaches obtain near-optimal solutions in a reasonable computational time for large-sized problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent modelling of socio-economic costs by the Australian railway industry in 2010 has estimated the cost of level crossing accidents to exceed AU$116 million annually. To better understand causal factors that contribute to these accidents, the Cooperative Research Centre for Rail Innovation is running a project entitled Baseline Level Crossing Video. The project aims to improve the recording of level crossing safety data by developing an intelligent system capable of detecting near-miss incidents and capturing quantitative data around these incidents. To detect near-miss events at railway level crossings a video analytics module is being developed to analyse video footage obtained from forward-facing cameras installed on trains. This paper presents a vision base approach for the detection of these near-miss events. The video analytics module is comprised of object detectors and a rail detection algorithm, allowing the distance between a detected object and the rail to be determined. An existing publicly available Histograms of Oriented Gradients (HOG) based object detector algorithm is used to detect various types of vehicles in each video frame. As vehicles are usually seen from a sideway view from the cabin’s perspective, the results of the vehicle detector are verified using an algorithm that can detect the wheels of each detected vehicle. Rail detection is facilitated using a projective transformation of the video, such that the forward-facing view becomes a bird’s eye view. Line Segment Detector is employed as the feature extractor and a sliding window approach is developed to track a pair of rails. Localisation of the vehicles is done by projecting the results of the vehicle and rail detectors on the ground plane allowing the distance between the vehicle and rail to be calculated. The resultant vehicle positions and distance are logged to a database for further analysis. We present preliminary results regarding the performance of a prototype video analytics module on a data set of videos containing more than 30 different railway level crossings. The video data is captured from a journey of a train that has passed through these level crossings.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Of all the stories to emerge from Queensland’s catastrophic summer of 2011, the most dramatic and starkly tragic were those that took place in Toowoomba and the Lockyer Valley. On January 10, 2011, after weeks of heavy rain and as floodwaters began to overwhelm much of south-east Queensland, an ‘inland tsunami’ hit the city of Toowoomba, the rural districts of Spring Bluff and Postmans Ridge, and the towns of Murphys Creek, Withcott, Helidon, and Grantham. The Torrent:Toowoomba and the Lockyer Valley, 10 January 2011 tells, for the first time, the extraordinary stories of survival and loss that emerged from that terrible day. Official figures state that twenty-four people died. Many escaped death only because they were rescued by members of the community or through sheer good fortune. Based on exclusive interviews with survivors, rescuers and with the families and friends of victims of the disaster, The Torrent is a unique and powerful account of human courage in the face of the devastating force of nature, and the enduring resilience of ordinary Australians.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Addressing the Crew Scheduling Problem (CSP) in transportation systems can be too complex to capture all details. The designed models usually ignore or simplify features which are difficult to formulate. This paper proposes an alternative formulation using a Mixed Integer Programming (MIP) approach to the problem. The optimisation model integrates the two phases of pairing generation and pairing optimisation by simultaneously sequencing trips into feasible duties and minimising total elapsed time of any duty. Crew scheduling constraints in which the crew have to return to their home depot at the end of the shift are included in the model. The flexibility of this model comes in the inclusion of the time interval of relief opportunities, allowing the crew to be relieved during a finite time interval. This will enhance the robustness of the schedule and provide a better representation of real-world conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the most important parts of any Bridge Management System (BMS) is the condition assessment and rating of bridges. This paper, introduces a procedure for condition assessment, based on criticality and vulnerability analysis. According to this procedure, new rating equations are developed. The inventory data is used to determine the contribution of different critical factors such as environmental effects, flood, earthquake, wind, and vehicle impacts. The criticality of the components to live load and vulnerability of the components to the above critical factors are identified. Based on the criticality and the vulnerability of the components and criticality of factors, and by using the new rating equations, the condition assessment and the rating of the railway bridges and their components at the network level will be conducted. This method for the first time incorporates structural analysis, available knowledge of risk assessment in structural engineering standards, and the experience of structural engineers in a practical way to enhance the reliability of the condition assessment and rating a network of bridges.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Kimtran Pty Ltd v Downie [2003] QDC 043 the court allowed in part an appeal from the refusal by the Queensland Building Tribunal to order the respondent liquidators pay the appellants' costs of proceedings in the Tribunal. The decision involved an examination of authorities which have considered the circumstances in which it is in the interests of justice to make an order for costs against a non-party.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Kimtran v Downie [2003] QCA 424, the Queensland Court of Appeal allowed an appeal from the decision of a District Court judge who had ordered costs against a non-party liquidator. It held that the court's decision in relation to the awarding of costs against a liquidator was not constrained by the decision of the of the Court of Appeal in Mahaffey v Belar Pty Ltd [1999] QCA 2 in the manner stated in the District Court.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Level crossing risk continues to be a significant safety concern for the security of rail operations around the world. Over the last decade or so, a third of railway related fatalities occurred as a direct result of collisions between road and rail vehicles in Australia. Importantly, nearly half of these collisions occurred at railway level crossings with no active protection, such as flashing lights or boom barriers. Current practice is to upgrade level crossings that have no active protection. However, the total number of level crossings found across Australia exceed 23,500, and targeting the proportion of these that are considered high risk (e.g. public crossings with passive controls) would cost in excess of AU$3.25 billion based on equipment, installation and commissioning costs of warning devices that are currently type approved. Level crossing warning devices that are low-cost provide a potentially effective control for reducing risk; however, over the last decade, there have been significant barriers and legal issues in both Australia and the US that have foreshadowed their adoption. These devices are designed to have significantly lower lifecycle costs compared with traditional warning devices. They often make use of use of alternative technologies for train detection, wireless connectivity and solar energy supply. This paper describes the barriers that have been encountered for the adoption of these devices in Australia, including the challenges associated with: (1) determining requisite safety levels for such devices; (2) legal issues relating to duty of care obligations of railway operators; and (3) issues of Tort liability around the use of less than fail-safe equipment. This paper provides an overview of a comprehensive safety justification that was developed as part of a project funded by a collaborative rail research initiative established by the Australian government, and describes the conceptual framework and processes being used to justify its adoption. The paper provides a summary of key points from peer review and discusses prospective barriers that may need to be overcome for future adoption. A successful outcome from this process would result in the development of a guideline for decision-making, providing a precedence for adopting low-cost level crossing warning devices in other parts of the world. The framework described in this paper also provides relevance to the review and adoption of analogous technologies in rail and other safety critical industries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Engineering design processes are necessary to attain the requisite standards of integrity for high-assurance safety-related systems. Additionally, human factors design initiatives can provide critical insights that parameterise their development. Unfortunately, the popular perception of human factors as a “forced marriage” between engineering and psychology often provokes views where the ‘human factor’ is perceived as a threat to systems design. Some popular performance-based standards for developing safety-related systems advocate identifying and managing human factors throughout the system lifecycle. However, they also have a tendency to fall short in their guidance on the application of human factors methods and tools, let alone how the outputs generated can be integrated in to various stages of the design process. This case study describes a project that converged engineering with human factors to develop a safety argument for new low-cost railway level crossing technology for system-wide implementation in Australia. The paper enjoins the perspectives of a software engineer and cognitive psychologist and their involvement in the project over two years of collaborative work to develop a safety argument for low-cost level crossing technology. Safety and reliability requirements were informed by applying human factors analytical tools that supported the evaluation and quantification of human reliability where users interfaced with the technology. The project team was confronted with significant challenges in cross-disciplinary engagement, particularly with the complexities of dealing with incongruences in disciplinary language. They were also encouraged to think ‘outside the box’ as to how users of a system interpreted system states and ehaviour. Importantly, some of these states, while considered safe within the boundary of the constituent systems that implemented safety-related functions, could actually lead the users to engage in deviant behaviour. Psychology explained how user compliance could be eroded to levels that effectively undermined levels of risk reduction afforded by systems. Linking the engineering and psychology disciplines intuitively, overall safety performance was improved by introducing technical requirements and making design decisions that minimized the system states and behaviours that led to user deviancy. As a commentary on the utility of transdisciplinary collaboration for technical specification, the processes used to bridge the two disciplines are conceptualised in a graphical model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Intelligent Transport System (ITS) technology is seen as a cost-effective way to increase the conspicuity of approaching trains and the effectiveness of train warnings at level crossings by providing an in-vehicle warning of an approaching train. The technology is often seen as a potential low-cost alternative to upgrading passive level crossings with traditional active warning systems (flashing lights and boom barriers). ITS platforms provide sensor, localization and dedicated short-range communication (DSRC) technologies to support cooperative applications such as collision avoidance for road vehicles. In recent years, in-vehicle warning systems based on ITS technology have been trialed at numerous locations around Australia, at level crossing sites with active and passive controls. While significant research has been conducted on the benefits of the technology in nominal operating modes, little research has focused on the effects of the failure modes, the human factors implications of unreliable warnings and the technology adoption process from the railway industry’s perspective. Many ITS technology suppliers originate from the road industry and often have limited awareness of the safety assurance requirements, operational requirements and legal obligations of railway operators. This paper aims to raise awareness of these issues and start a discussion on how such technology could be adopted. This paper will describe several ITS implementation cenarios and discuss failure modes, human factors considerations and the impact these scenarios are likely to have in terms of safety, railway safety assurance requirements and the practicability of meeting these requirements. The paper will identify the key obstacles impeding the adoption of ITS systems for the different implementation scenarios and a possible path forward towards the adoption of ITS technology.