986 resultados para Road construction contracts.
Resumo:
The stylistic categorization of the Estado Novo has been intensely discussed by Portuguese art historians. The square Alameda Dom Afonso Henriques in Lisbon (Alameda) can be seen as paradigmatic for the architecture of power of the Estado Novo. The Alameda forms a gardened valley between two hills. There you find two prominent and highly propagandist buildings: The Instituto Superior Técnico (IST) and the Fonte Luminosa are dedicated to modern sciences and respectively to the harmonious contribution of nature to the city. The iconography of the Alameda as well as its incorporation into the propagandist use of urban planning in the 1930s and 1940s exemplify the visual politics during Salazarism. Urban planning programs intended to create cities that would preserve the character of a traditional catholic society and at the same time answer to the need to modernize the country and evoke the image of a progressive state. Thus, public buildings and urban squares such as the Alameda contributed to design a corporate image and to the ‘spirit’ of the regime.
Resumo:
Sonae MC is considered the first success case of Kaizen in the retail industry. Before becoming a true role model for so many companies, there was a long road to walk. However, it may still be hard to understand the steps taken on the way. How could a training program develop into an integral continuous improvement system, and how did it affect the company – its people, culture, operations and strategy? How was it possible to get everyone on board? How could it be sustained until today, when Kaizen usually fails in the West? What were the critical factors for success?
Resumo:
In broad sense, Project Financing1 as a mean of financing large scale infrastructural projects worldwide has had a steady growth in popularity for the last 20 years. This growth has been relatively unscathed from most economic cycles. However in the wake of the 2007 systemic Financial Crisis, Project Financing was also in trouble. The liquidity freeze and credit crunch that ensued affected all parties involved. Traditional Lenders, of this type of financial instrument, locked-in long-term contractual obligations, were severely hit with scarcity of funding compounded by rapidly increasing cost of funding. All the while, Banks were “rescued” by the concerted actions of Central Banks and other Multi-Lateral Agencies around the world but at the same time “stressed” by upcoming regulatory effort (Basel Committee). This impact resulted in specific changes to this type of long-term financing. Changes such as Commercial Banks’ increased risk aversion; pricing increase and maturities decrease of credit facilities; enforcement of Market Disruption Event clauses; partial responsibility for project risk by Multilateral Agencies; and adoption of utility-like availability payments in other industrial sectors such as transportation and even social infrastructure. To the extent possible, this report is then divided in three parts. First, it begins with a more instructional part, touching academic literature (theory) and giving the Banks perspective (practice), but mostly as an overview of Project Finance for awareness’ sake. The renowned Harvard Business School professor – Benjamin Esty, states2 that Project Finance is a “relatively unexplored territory for both empirical and theoretical research” which means that academic research efforts are lagging the practice of Project Finance. Second, the report presents a practical case regarding the first Road Concession in Portugal in 1998 ending with the lessons learned 10 years after Financial Close. Lastly, the report concludes with the analysis of the current trends and changes to the industry post Financial Crisis of the late 2000’s. To achieve this I’ll reference relevant papers, books on the subject, online articles and my own experience in the Project Finance Department at a major Portuguese Investment Bank. Regarding the latter, with the signing of a confidentiality agreement, I’m duly omitting sensitive and proprietary bank information.
Resumo:
International businesses bring with them additional negotiation complexities and extra risks, thus calling for negotiation integrative solutions and additional legal protection. The recent economic crisis forced, companies, including SMEs, to look for international markets and face these additional complexities and issues. In the search for a practical and simplified solution, to serve less sophisticated companies, this paper brings insights from the negotiation literature to a specific legal issue. Specifically, I investigate the negotiation and use of contingent agreements as a tool for facilitating the negotiation process and managing risk in international deals. Looking into an international sale of goods from Portugal to Brazil, this paper proposes the structuring of two contingent contracts related to two category of products in order to demonstrate the potential benefits of some of its relevant features, specifically the creation of incentives and identification and allocation of future risks. In general, the structuring of contingent agreements is likely to provide positive results in mitigating the issues of lack of trust and dealing with the additional risks derived from international deals, therefore facilitating and improving the overall quality of the deal.
Resumo:
The intensity of construction of foraging access holes by two leaf-litter feeding, soil- inhabiting termite species, Syntermes molestus and Syntermes spinosus, in a Central Amazonian rain forest, was observed on consecutive nights for two weeks. Between 11 and 48 nest entrances per m2 were counted. Interaction between the two species was intense; some entrance holes were overtaken by the larger species during the observations; however, both species coexist in the area. A calculated minimum of 35 entrances/m2 is built every year by both species, emphasizing the importance of soil-burrowing termites for soil structure, aeration and water regime.
Resumo:
Nowadays, road accidents are a major public health problem, which increase is forecasted if road safety is not treated properly, dying about 1.2 million people every year around the globe. In 2012, Portugal recorded 573 fatalities in road accidents, on site, revealing the largest decreasing of the European Union for 2011, along with Denmark. Beyond the impact caused by fatalities, it was calculated that the economic and social costs of road accidents weighted about 1.17% of the Portuguese gross domestic product in 2010. Visual Analytics allows the combination of data analysis techniques with interactive visualizations, which facilitates the process of knowledge discovery in sets of large and complex data, while the Geovisual Analytics facilitates the exploration of space-time data through maps with different variables and parameters that are under analysis. In Portugal, the identification of road accident accumulation zones, in this work named black spots, has been restricted to annual fixed windows. In this work, it is presented a dynamic approach based on Visual Analytics techniques that is able to identify the displacement of black spots on sliding windows of 12 months. Moreover, with the use of different parameterizations in the formula usually used to detect black spots, it is possible to identify zones that are almost becoming black spots. Through the proposed visualizations, the study and identification of countermeasures to this social and economic problem can gain new grounds and thus the decision- making process is supported and improved.
Resumo:
The assessment of concrete mechanical properties during construction of concrete structures is of paramount importance for many intrinsic operations. However many of the available non-destructive methods for mechanical properties have limitations for use in construction sites. One of such methodologies is EMM-ARM, which is a variant of classic resonant frequency methods. This paper aims to demonstrate the efforts towards in-situ applicability of EMMARM, as to provide real-time information about concrete mechanical properties such as E-modulus and compressive strength. To achieve the aforementioned objective, a set of adaptations to the method have been successfully implemented and tested: (i) the reduction of the beam span; (ii) the use of a different mould material and (iii) a new support system for the beams. Based on these adaptations, a reusable mould was designed to enable easier systematic use of EMMARM. A pilot test was successfully performed under in-situ conditions during a bridge construction.
Resumo:
This paper assesses the feasibility of impregnation/encasement of phase change materials (PCMs) in lightweight aggregates (LWAs). An impregnation process was adopted to carry out the encasement study of two different PCMs in four different LWAs. The leakage of the impregnated/encased PCMs was studied when they were submitted to freeze/thawing and oven drying tests, separately. The results confirmed that, the impregnation/encasement method is effective with respect to the large thermal energy storage density, and can be suitable for applications were PCMs cannot be incorporated directly such as asphalt road pavements.
Resumo:
Given the current economic situation of the Portuguese municipalities, it is necessary to identify the priority investments in order to achieve a more efficient financial management. The classification of the road network of the municipality according to the occurrence of traffic accidents is fundamental to set priorities for road interventions. This paper presents a model for road network classification based on traffic accidents integrated in a geographic information system. Its practical application was developed through a case study in the municipality of Barcelos. An equation was defined to obtain a road safety index through the combination of the following indicators: severity, property damage only and accident costs. In addition to the road network classification, the application of the model allows to analyze the spatial coverage of accidents in order to determine the centrality and dispersion of the locations with the highest incidence of road accidents. This analysis can be further refined according to the nature of the accidents namely in collision, runoff and pedestrian crashes.
Resumo:
In Ecuadorean Amazonas, Crematogaster ants (Myrmicinae) were observed to construct shelters of debris and plant trichomes covering and hiding extrafloral nectaries of Passiflora auriculata vines. This is seen as an advanced way of excluding competing ants from a food source.
Resumo:
During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).
Resumo:
This paper aims to describe the Sequential Excavation Method, used for excava-tion in underground works, as well as the related risks and preventive measures. This method has characteristics that differentiate it from other tunnelling techniques: it uses a larger number of workers and equipment; it has a high concurrency of tasks with various workers and equip-ment quite exposed to hazards; and it uses many potentially aggressive chemicals. Firstly, it is given a broad overview of this issue. Afterwards, it will be presented the results of a survey to a sample of experienced technicians, aimed at gauging the relevance of a set of guidelines relat-ing to the design and work phases, applicable to the domestic market and prepared following technical visits to works abroad.
Resumo:
Earthworks involve the levelling or shaping of a target area through the moving or processing of the ground surface. Most construction projects require earthworks, which are heavily dependent on mechanical equipment (e.g., excavators, trucks and compactors). Often, earthworks are the most costly and time-consuming component of infrastructure constructions (e.g., road, railway and airports) and current pressure for higher productivity and safety highlights the need to optimize earthworks, which is a nontrivial task. Most previous attempts at tackling this problem focus on single-objective optimization of partial processes or aspects of earthworks, overlooking the advantages of a multi-objective and global optimization. This work describes a novel optimization system based on an evolutionary multi-objective approach, capable of globally optimizing several objectives simultaneously and dynamically. The proposed system views an earthwork construction as a production line, where the goal is to optimize resources under two crucial criteria (costs and duration) and focus the evolutionary search (non-dominated sorting genetic algorithm-II) on compaction allocation, using linear programming to distribute the remaining equipment (e.g., excavators). Several experiments were held using real-world data from a Portuguese construction site, showing that the proposed system is quite competitive when compared with current manual earthwork equipment allocation.
Resumo:
Nowadays, recycling has become a very important objective for the society in the scope of a closed loop product life cycle. In recent years, new recycling techniques have been developed in the area of road pavements that allow the incorporation of high percentages of reclaimed asphalt (RA) materials in recycled asphalt mixtures. The use of foamed bitumen for production of recycled asphalt mixtures is one of those techniques, which also allows the reduction of the mixing temperatures (warm mix technology). However, it is important to evaluate if this solution can maintain or improve the performance of the resulting mixtures. Thus, the main aim of the present study is to assess the performance of warm recycled asphalt mixtures incorporating foamed bitumen as the new binder and 50% RA, in comparison with a control mixture using conventional bitumen. Four mixtures have been produced with 50% RA, one of them at typical high mixing temperatures with a conventional bitumen (control mixture) and the other three with foamed bitumen at different production temperatures. These four mixtures were tested to evaluate their compactability and water sensitivity. The laboratory test results showed that the production of recycled mixtures with foamed bitumen can be reduced by 40ºC without changing the performance of the resulting mixtures.
Resumo:
Road pavements are very important infrastructures for the Society, but they can cause serious environmental impacts during construction, operation and rehabilitation phases. Thus, it is essential to develop surface paving solutions that promote not only the durability but also a comfortable and safe use. In fact, this work aims to study the properties of new opengraded mixtures for surface layers produced with plastic wastes. First, HDPE and EVA wastes were used as bitumen modifiers, and then another plastic waste (PEX) replaced part of the aggregates. After studying the modified binders, the open-graded mixtures were designed, and then they were tested concerning their particle loss, rutting resistance, surface texture and damping effect. It was concluded that both ways of using the plastic wastes can improve the mechanical and functional properties of the open-graded mixtures related to the pavement performance.