920 resultados para Reactive power limits of generation buses
Resumo:
The elastic behavior of the demand consumption jointly used with other available resources such as distributed generation (DG) can play a crucial role for the success of smart grids. The intensive use of Distributed Energy Resources (DER) and the technical and contractual constraints result in large-scale non linear optimization problems that require computational intelligence methods to be solved. This paper proposes a Particle Swarm Optimization (PSO) based methodology to support the minimization of the operation costs of a virtual power player that manages the resources in a distribution network and the network itself. Resources include the DER available in the considered time period and the energy that can be bought from external energy suppliers. Network constraints are considered. The proposed approach uses Gaussian mutation of the strategic parameters and contextual self-parameterization of the maximum and minimum particle velocities. The case study considers a real 937 bus distribution network, with 20310 consumers and 548 distributed generators. The obtained solutions are compared with a deterministic approach and with PSO without mutation and Evolutionary PSO, both using self-parameterization.
Resumo:
The implementation of smart homes allows the domestic consumer to be an active player in the context of the Smart Grid (SG). This paper presents an intelligent house management system that is being developed by the authors to manage, in real time, the power consumption, the micro generation system, the charge and discharge of the electric or plug-in hybrid vehicles, and the participation in Demand Response (DR) programs. The paper proposes a method for the energy efficiency analysis of a domestic consumer using the SCADA House Intelligent Management (SHIM) system. The main goal of the present paper is to demonstrate the economic benefits of the implemented method. The case study considers the consumption data of some real cases of Portuguese house consumption over 30 days of June of 2012, the Portuguese real energy price, the implementation of the power limits at different times of the day and the economic benefits analysis.
Resumo:
Power systems have been through deep changes in recent years, namely due to the operation of competitive electricity markets in the scope the increasingly intensive use of renewable energy sources and distributed generation. This requires new business models able to cope with the new opportunities that have emerged. Virtual Power Players (VPPs) are a new type of player that allows aggregating a diversity of players (Distributed Generation (DG), Storage Agents (SA), Electrical Vehicles (V2G) and consumers) to facilitate their participation in the electricity markets and to provide a set of new services promoting generation and consumption efficiency, while improving players’ benefits. A major task of VPPs is the remuneration of generation and services (maintenance, market operation costs and energy reserves), as well as charging energy consumption. This paper proposes a model to implement fair and strategic remuneration and tariff methodologies, able to allow efficient VPP operation and VPP goals accomplishment in the scope of electricity markets.
Resumo:
No âmbito do desenvolvimento da dissertação do Mestrado de Engenharia Eletrotécnica – Sistemas Elétricos de Energia, surgiu a oportunidade de participar no desenvolvimento de um projeto integrante numa subestação de energia. O presente caso de estudo tem em vista a resolução de condicionantes na conceção desta subestação, tais como cumprir requisitos estéticos projetando todo o tipo de equipamentos dentro de edifícios, a ventilação das salas de transformação assim como insonorização de todo o ruído produzido de forma a cumprir os limites legais e não perturbar a vizinhança. A presente subestação de energia está situada numa zona urbana da cidade de Leiria, localidade de Parceiros, dando origem ao nome Subestação de Energia de Parceiros. Esta subestação pertence ao cliente Energias de Portugal, conhecida como EDP, e visa o melhoramento da distribuição do serviço eléctrico. As tradicionais subestações de energia, com aparência bastante desenquadrada dos meios urbanos, representam um entrave ao nível da aproximação destes centros de produção energética às zonas urbanas, comprometendo a melhoria da rede elétrica. Desta forma, foi implementada a tecnologia Gas-Insolated Switchgear e permite o enquadramento destes centros energéticos em zonas urbanas, constituindo mais um edifício urbano na zona onde se insere. Esta substitui os convencionais barramentos existentes nos Parques Exteriores de Aparelhagem das subestações e apresenta-se com dimensões muito reduzidas quando comparadas com as estruturas instaladas nestes parques. Dado que esta tecnologia é desenvolvida no sentido de permitir a construção destes centros energéticos em zonas urbanas, podem ser alojadas dentro de edifícios produzindo assim vantagens ao nível estético, não perturbando a paisagem. Dado que os principais equipamentos de funcionamento na subestação de Parceiros, nomeadamente o Transformador de Potência, se encontram instalados num edifício completamente fechado, foram construídas duas salas de ventilação, na parte superior deste edifício, cada uma adjacente a uma sala de transformação. O transformador instalado possui elevadas dimensões, pesando 53000 kg e contendo 11000 kg de óleo que em estado normal de funcionamento circula por quase todo o interior da máquina a elevadas temperaturas, provocando um aquecimento elevado no interior do edifício o que condiciona o bom funcionamento do transformador. Para ultrapassar esta condicionante foi realizado um estudo de um sistema de ventilação capaz de avaliar e controlar os valores térmicos existentes e proceder à circulação de ar, que será movimentado ou bloqueado, recorrendo a um sistema autónomo, mantendo a temperatura ideal nas salas de transformação. Este autómato é o cérebro de toda a cadeia lógica que, mediante as leituras efetuadas irá dar ordens de atuação aos diversos equipamentos. Apesar dos TP estarem protegidos dentro do edifício, estes produzem um maior ruído. A necessidade da existência do referido sistema de ventilação das divisões de funcionamento destas máquinas, implica a utilização de aparelhos que, apesar da sua evolução tecnológica os torna cada vez menos ruidosos, mas geram sempre alguma perturbação, o que pode representar um problema no cumprimento do regulamento geral do ruído.
Resumo:
All over the world, the liberalization of electricity markets, which follows different paradigms, has created new challenges for those involved in this sector. In order to respond to these challenges, electric power systems suffered a significant restructuring in its mode of operation and planning. This restructuring resulted in a considerable increase of the electric sector competitiveness. Particularly, the Ancillary Services (AS) market has been target of constant renovations in its operation mode as it is a targeted market for the trading of services, which have as main objective to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. In this way, with the increasing penetration of distributed energy resources including distributed generation, demand response, storage units and electric vehicles, it is essential to develop new smarter and hierarchical methods of operation of electric power systems. As these resources are mostly connected to the distribution network, it is important to consider the introduction of this kind of resources in AS delivery in order to achieve greater reliability and cost efficiency of electrical power systems operation. The main contribution of this work is the design and development of mechanisms and methodologies of AS market and for energy and AS joint market, considering different management entities of transmission and distribution networks. Several models developed in this work consider the most common AS in the liberalized market environment: Regulation Down; Regulation Up; Spinning Reserve and Non-Spinning Reserve. The presented models consider different rules and ways of operation, such as the division of market by network areas, which allows the congestion management of interconnections between areas; or the ancillary service cascading process, which allows the replacement of AS of superior quality by lower quality of AS, ensuring a better economic performance of the market. A major contribution of this work is the development an innovative methodology of market clearing process to be used in the energy and AS joint market, able to ensure viable and feasible solutions in markets, where there are technical constraints in the transmission network involving its division into areas or regions. The proposed method is based on the determination of Bialek topological factors and considers the contribution of the dispatch for all services of increase of generation (energy, Regulation Up, Spinning and Non-Spinning reserves) in network congestion. The use of Bialek factors in each iteration of the proposed methodology allows limiting the bids in the market while ensuring that the solution is feasible in any context of system operation. Another important contribution of this work is the model of the contribution of distributed energy resources in the ancillary services. In this way, a Virtual Power Player (VPP) is considered in order to aggregate, manage and interact with distributed energy resources. The VPP manages all the agents aggregated, being able to supply AS to the system operator, with the main purpose of participation in electricity market. In order to ensure their participation in the AS, the VPP should have a set of contracts with the agents that include a set of diversified and adapted rules to each kind of distributed resource. All methodologies developed and implemented in this work have been integrated into the MASCEM simulator, which is a simulator based on a multi-agent system that allows to study complex operation of electricity markets. In this way, the developed methodologies allow the simulator to cover more operation contexts of the present and future of the electricity market. In this way, this dissertation offers a huge contribution to the AS market simulation, based on models and mechanisms currently used in several real markets, as well as the introduction of innovative methodologies of market clearing process on the energy and AS joint market. This dissertation presents five case studies; each one consists of multiple scenarios. The first case study illustrates the application of AS market simulation considering several bids of market players. The energy and ancillary services joint market simulation is exposed in the second case study. In the third case study it is developed a comparison between the simulation of the joint market methodology, in which the player bids to the ancillary services is considered by network areas and a reference methodology. The fourth case study presents the simulation of joint market methodology based on Bialek topological distribution factors applied to transmission network with 7 buses managed by a TSO. The last case study presents a joint market model simulation which considers the aggregation of small players to a VPP, as well as complex contracts related to these entities. The case study comprises a distribution network with 33 buses managed by VPP, which comprises several kinds of distributed resources, such as photovoltaic, CHP, fuel cells, wind turbines, biomass, small hydro, municipal solid waste, demand response, and storage units.
Resumo:
In this study, energy production for autonomous underwater vehicles is investigated. This project is part of a bigger project called TURTLE. The autonomous vehicles perform oceanic researches at seabed for which they are intended to be kept operational underwater for several months. In order to ful l a long-term underwater condition, powerful batteries are combined with \micro- scale" energy production on the spot. This work tends to develop a system that generates power up to a maximum of 30 W. Latter energy harvesting structure consists basically of a turbine combined with a generator and low-power electronics to adjust the achieved voltage to a required battery charger voltage. Every component is examined separately hence an optimum can be de ned for all, and subsequently also an overall optimum. Di erent design parameters as e.g. number of blades, solidity ratio and cross-section area are compared for di erent turbines, in order to see what is the most feasible type. Further, a generator is chosen by studying how ux distributions might be adjusted to low velocities, and how cogging torque can be excluded by adapted designs. Low-power electronics are con gured in order to convert and stabilize heavily varying three-phase voltages to a constant, recti ed voltage which is usable for battery storage. Clearly, di erent component parameters as maximum power and torque are matched here to increase the overall power generation. Furthermore an overall maximum power is set up for achieving a maximum power ow at load side. Due to among others typical low velocities of about 0.1 to 0.5 m/s, and constructing limits of the prototype, the vast range of components is restricted to only a few that could be used. Hence, a helical turbine is combined in a direct drive mode to a coreless-stator axial- ux permanent-magnet generator, from which the output voltage is adjusted subsequently by a recti er, impedance matching unit, upconverter circuit and an overall control unit to regulate di erent component parameters. All these electronics are combined in a closed-loop design to involve positive feedback signals. Furthermore a theoretical con guration for the TURTLE vehicle is described in this work and a solution is proposed that might be implemented, for which several design tests are performable in a future study.
Resumo:
The integration of wind power in eletricity generation brings new challenges to unit commitment due to the random nature of wind speed. For this particular optimisation problem, wind uncertainty has been handled in practice by means of conservative stochastic scenario-based optimisation models, or through additional operating reserve settings. However, generation companies may have different attitudes towards operating costs, load curtailment, or waste of wind energy, when considering the risk caused by wind power variability. Therefore, alternative and possibly more adequate approaches should be explored. This work is divided in two main parts. Firstly we survey the main formulations presented in the literature for the integration of wind power in the unit commitment problem (UCP) and present an alternative model for the wind-thermal unit commitment. We make use of the utility theory concepts to develop a multi-criteria stochastic model. The objectives considered are the minimisation of costs, load curtailment and waste of wind energy. Those are represented by individual utility functions and aggregated in a single additive utility function. This last function is adequately linearised leading to a mixed-integer linear program (MILP) model that can be tackled by general-purpose solvers in order to find the most preferred solution. In the second part we discuss the integration of pumped-storage hydro (PSH) units in the UCP with large wind penetration. Those units can provide extra flexibility by using wind energy to pump and store water in the form of potential energy that can be generated after during peak load periods. PSH units are added to the first model, yielding a MILP model with wind-hydro-thermal coordination. Results showed that the proposed methodology is able to reflect the risk profiles of decision makers for both models. By including PSH units, the results are significantly improved.
Resumo:
This paper presents the proposal of a three phase current source shunt active power filter (CS-SAPF) with photovoltaic grid interface. The proposed system combines the compensation of reactive power and harmonics with the injection of energy from a solar photovoltaic array into the electrical power grid. The proposed equipment presents the advantage of giving good use to the current source inverter, even when the solar photovoltaic array is not producing energy. The paper describes the control system of the CS SAPF, the energy injection control strategy, and the current harmonics and power factor compensation strategy. Simulation results to assess the performance of the proposed system are also presented.
Resumo:
PURPOSE: The aim of this work was to study the central and peripheral thickness of several contact lenses (CL) with different powers and analyze how thickness variation affects CL oxygen transmissibility. METHODS: Four daily disposable and five monthly or biweekly CL were studied. The powers of each CL were: the maximum negative power of each brand; -6.00 D; -3.00 D; zero power (-0.25 D or -0.50 D), +3.00 D and +6.00 D. Central and peripheral thicknesses were measured with an electronic thickness gauge. Each lens was measured five times (central and 3mm paracentral) and the mean value was considered. Using the values of oxygen permeability given by the manufacturers and the measured thicknesses, the variation of oxygen transmissibility with lens power was determined. RESULTS: For monthly or biweekly lenses, central thickness changed between 0.061 ± 0.002 mm and 0.243 ± 0.002 mm, and peripheral thickness varied between 0.084 ± 0.002 mm and 0.231 ± 0.015 mm. Daily disposable lenses showed central values ranging between 0.056 ± 0.0016 mm and 0.205 ± 0.002 mm and peripheral values between 0.108 ± 0.05 and 0.232 ± 0.011 mm. Oxygen transmissibility (in units) of monthly or biweekly CL ranged between 39.4 ± 0.3 and 246.0 ± 14.4 and for daily disposable lenses the values range between 9.5 ± 0.5 and 178.1 ± 5.1. CONCLUSIONS: The central and peripheral thicknesses change significantly when considering the CL power and this has a significant impact on the oxygen transmissibility. Eyecare practitioners must have this fact in account when high power plus or minus lenses are fitted or when continuous wear is considered.
Resumo:
This article examines the extent and limits of non-state forms of authority in international relations. It analyses how the information and communication technology (ICT) infrastructure for the tradability of services in a global knowledge-based economy relies on informal regulatory practices for adjustment of ICT-related skills. Companies and associations provide training and certification programmes as part of a growing market for educational services setting their own standards. The existing literature on non-conventional forms of authority in the global political economy has emphasised that the consent of actors subject to informal rules and explicit or implicit state recognition remains crucial for the effectiveness of those new forms of power. However, analyses based on a limited sample of actors tend toward a narrow understanding of the issues and fail to fully explore the differentiated space in which non-state authority is emerging. This paper examines the form of authority underpinning the global knowledge-based economy within the broader perspective of the issues likely to be standardised by technical ICT specification, the wide range of actors involved, and the highly differentiated space where standards become authoritative. The empirical findings highlight the role of different private actors in establishing international educational norms in this field. They also pinpoint the limits of profit-oriented standard-settings, notably with regard to generic norms.
Resumo:
This study examined the validity and reliability of a sequential "Run-Bike-Run" test (RBR) in age-group triathletes. Eight Olympic distance (OD) specialists (age 30.0 ± 2.0 years, mass 75.6 ± 1.6 kg, run VO2max 63.8 ± 1.9 ml· kg(-1)· min(-1), cycle VO2peak 56.7 ± 5.1 ml· kg(-1)· min(-1)) performed four trials over 10 days. Trial 1 (TRVO2max) was an incremental treadmill running test. Trials 2 and 3 (RBR1 and RBR2) involved: 1) a 7-min run at 15 km· h(-1) (R1) plus a 1-min transition to 2) cycling to fatigue (2 W· kg(-1) body mass then 30 W each 3 min); 3) 10-min cycling at 3 W· kg(-1) (Bsubmax); another 1-min transition and 4) a second 7-min run at 15 km· h(-1) (R2). Trial 4 (TT) was a 30-min cycle - 20-min run time trial. No significant differences in absolute oxygen uptake (VO2), heart rate (HR), or blood lactate concentration ([BLA]) were evidenced between RBR1 and RBR2. For all measured physiological variables, the limits of agreement were similar, and the mean differences were physiologically unimportant, between trials. Low levels of test-retest error (i.e. ICC <0.8, CV<10%) were observed for most (logged) measurements. However [BLA] post R1 (ICC 0.87, CV 25.1%), [BLA] post Bsubmax (ICC 0.99, CV 16.31) and [BLA] post R2 (ICC 0.51, CV 22.9%) were least reliable. These error ranges may help coaches detect real changes in training status over time. Moreover, RBR test variables can be used to predict discipline specific and overall TT performance. Cycle VO2peak, cycle peak power output, and the change between R1 and R2 (deltaR1R2) in [BLA] were most highly related to overall TT distance (r = 0.89, p < 0. 01; r = 0.94, p < 0.02; r = 0.86, p < 0.05, respectively). The percentage of TR VO2max at 15 km· h(-1), and deltaR1R2 HR, were also related to run TT distance (r = -0.83 and 0.86, both p < 0.05).
Resumo:
Over the past two decades, inflammation has emerged as a key pathophysiological process during myocardial infarction. It develops consecutively to the activation of innate immune defense mechanisms, in response to the release of endogenous molecules by necrotic cells and the extracellular matrix. These danger signals are sensed by cellular receptors normally involved in antimicrobial defenses, including toll-like receptors and a subset of NOD-like receptors, which promote intracellular signaling dependent on nuclear factor kappaB and on the formation of the inflammasome. These mechanisms stimulate the expression of multiple inflammatory mediators and growth factors, sequentially inducing the recruitment of inflammatory cells, the clearance of injured tissue, angiogenesis, and the proliferation of fibroblasts, eventually resulting in scar formation and infarct healing. Dysregulation of these responses may result in continued cardiomyocyte loss, fibrosis beyond the limits of the infarcted area, reactive hypertrophy and chamber dilatation, a process termed adverse cardiac remodeling, leading to functional compromise and heart failure. This review presents the current state of knowledge on the process of immune activation within the infarcted myocardium and its consequences.
Resumo:
The male of Mischocyttarus nomurae Richards, 1978 is described for the first time, and relationships between this and other similar species are discussed in a context of redefining the limits of the M. cerberus species group.
Resumo:
A procedure using a chirobiotic V column is presented which allows separation of the enantiomers of citalopram and its two N-demethylated metabolites, and of the internal standard, alprenolol, in human plasma. Citalopram, demethylcitalopram and didemethylcitalopram, as well as the internal standard, were recovered from plasma by liquid-liquid extraction. The limits of quantification were found to be 5 ng/ml for each enantiomer of citalopram and demethylcitalopram, and 7.5 ng/ml for each enantiomer of didemethylcitalopram. Inter- and intra-day coefficients of variation varied from 2.4% to 8.6% for S- and R-citalopram, from 2.9% to 7.4% for S- and R-demethylcitalopram, and from 5.6% to 12.4% for S- and R- didemethylcitalopram. No interference was observed from endogenous compounds following the extraction of plasma samples from 10 different patients treated with citalopram. This method allows accurate quantification for each enantiomer and is, therefore, well suited for pharmacokinetic and drug interaction investigations. The presented method replaces a previously described highly sensitive and selective high-performance liquid chromatography procedure using an acetylated 3-cyclobond column which, because of manufactural problems, is no longer usable for the separation of the enantiomers of citalopram and its demethylated metabolites.
Resumo:
Ground clutter caused by anomalous propagation (anaprop) can affect seriously radar rain rate estimates, particularly in fully automatic radar processing systems, and, if not filtered, can produce frequent false alarms. A statistical study of anomalous propagation detected from two operational C-band radars in the northern Italian region of Emilia Romagna is discussed, paying particular attention to its diurnal and seasonal variability. The analysis shows a high incidence of anaprop in summer, mainly in the morning and evening, due to the humid and hot summer climate of the Po Valley, particularly in the coastal zone. Thereafter, a comparison between different techniques and datasets to retrieve the vertical profile of the refractive index gradient in the boundary layer is also presented. In particular, their capability to detect anomalous propagation conditions is compared. Furthermore, beam path trajectories are simulated using a multilayer ray-tracing model and the influence of the propagation conditions on the beam trajectory and shape is examined. High resolution radiosounding data are identified as the best available dataset to reproduce accurately the local propagation conditions, while lower resolution standard TEMP data suffers from interpolation degradation and Numerical Weather Prediction model data (Lokal Model) are able to retrieve a tendency to superrefraction but not to detect ducting conditions. Observing the ray tracing of the centre, lower and upper limits of the radar antenna 3-dB half-power main beam lobe it is concluded that ducting layers produce a change in the measured volume and in the power distribution that can lead to an additional error in the reflectivity estimate and, subsequently, in the estimated rainfall rate.