891 resultados para Hazardous waste treatment facilities


Relevância:

100.00% 100.00%

Publicador:

Resumo:

"HWIRC AD87-0-11." "HWRIC 87-009."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"HWRIC project number 92-107."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Contract no. CR-815829."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Response Action Program cleans up hazardous substances at sites that present an imminent and substantial endangerment to human health and the environment but may not be addressed by another federal or state cleanup program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Description based on: 1997 ; caption title.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In a 2002 Record of decision, the Illinois Environmental Protection Agency (IEPA) outlined remedies for four major sources of groundwater contamination found in the Southeast Rockford Groundwater Contamination Superfund Site. This fact sheet updates information on further investigations at the Area 4, Area 7, Area 9/10 and Area 11 locations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"ENR contract no. HW85-01."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"HWRIC Project 88-045."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Spanish.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Printed January 1992."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"February 1997."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"HWRIC RR-057."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.