927 resultados para Railway scheduling
Resumo:
This paper presents a control strategy for blood glucose(BG) level regulation in type 1 diabetic patients. To design the controller, model-based predictive control scheme has been applied to a newly developed diabetic patient model. The controller is provided with a feedforward loop to improve meal compensation, a gain-scheduling scheme to account for different BG levels, and an asymmetric cost function to reduce hypoglycemic risk. A simulation environment that has been approved for testing of artificial pancreas control algorithms has been used to test the controller. The simulation results show a good controller performance in fasting conditions and meal disturbance rejection, and robustness against model–patient mismatch and errors in meal estimation
Resumo:
La construcción es una de las industrias que mayores accidentes laborales genera, en esta investigación se realizó un análisis retrospectivo para determinar si existe alguna relación entre la ocurrencia de accidentes y la fecha de entrega de una meta, debido al incremento en la cantidad de trabajo expresado por la cantidad de días y horas extras trabajados, se cuenta con información de la accidentalidad de cinco empresas constructoras de un gran proyecto vial en Colombia en los años de 2012 y 2013. Se analizó la información correspondiente a la nómina de las mismas empresas, con el valor de la nómina mensual, el valor de las incapacidades mensuales y la cantidad de trabajadores por cada empresa en cada periodo. El manejo de los datos se hizo con EXCEL y el análisis estadístico con STATA 11.1, se usó la correlación de Spearman para encontrar la relación entre la cantidad de accidentes acumulados y: la cantidad acumulada de días trabajados en cada mes, la cantidad acumulada de horas extras trabajadas mensualmente y el costo acumulado en porcentaje de la nómina mensual, encontrándose en todos los casos una relación lineal. Por otra parte, se realizó una prueba binomial para establecer la relación de la fecha de entrega de la meta con la accidentalidad 30 días antes y después, encontrando que la accidentalidad aumenta en la proximidad previa a la entrega de la meta
Resumo:
In multi-tasking systems when it is not possible to guarantee completion of all activities by specified times, the scheduling problem is not straightforward. Examples of this situation in real-time programming include the occurrence of alarm conditions and the buffering of output to peripherals in on-line facilities. The latter case is studied here with the hope of indicating one solution to the general problem.
Resumo:
Graphical tracking is a technique for crop scheduling where the actual plant state is plotted against an ideal target curve which encapsulates all crop and environmental characteristics. Management decisions are made on the basis of the position of the actual crop against the ideal position. Due to the simplicity of the approach it is possible for graphical tracks to be developed on site without the requirement for controlled experimentation. Growth models and graphical tracks are discussed, and an implementation of the Richards curve for graphical tracking described. In many cases, the more intuitively desirable growth models perform sub-optimally due to problems with the specification of starting conditions, environmental factors outside the scope of the original model and the introduction of new cultivars. Accurate specification for a biological model requires detailed and usually costly study, and as such is not adaptable to a changing cultivar range and changing cultivation techniques. Fitting of a new graphical track for a new cultivar can be conducted on site and improved over subsequent seasons. Graphical tracking emphasises the current position relative to the objective, and as such does not require the time consuming or system specific input of an environmental history, although it does require detailed crop measurement. The approach is flexible and could be applied to a variety of specification metrics, with digital imaging providing a route for added value. For decision making regarding crop manipulation from the observed current state, there is a role for simple predictive modelling over the short term to indicate the short term consequences of crop manipulation.
Resumo:
Most existing crop scheduling models are cultivar specific and are developed using academic resources. As such they rarely meet the particular needs of a grower. A series of protocols have been created to generate effective schedules for a changing product range using data generated on site at a commercial nursery. A screening programme has been developed to help determine a cultivar's photoperiod sensitivity and vernalisation requirement. Experimental conditions were obtained using a cold store facility set to 5degreesC and photoperiod cloches. Eight and 16 hour photoperiod treatments were achieved at low cost by growing plants in cloches of opaque plastic with a motorised rolling screen. Natural light conditions were extended where necessary using a high pressure sodium lamp. Batches of plants were grown according to different schedules based on these treatments. The screening programme found Coreopsis grandiflora 'Flying Saucers' to be a long day plant. Data to form the basis of graphical tracks was taken using variations on commercial schedules. The work provides a nursery based approach to the continuous improvement of crop scheduling practises.
Resumo:
Rolling Contact Fatigue (RCF) is one of the main issues that concern, at least initially, the head of the railway; progressively they can be of very high importance as they can propagate inside the material with the risk of damaging the railway. In this work, two different non-destructive techniques, infrared thermography (IRT) and fibre optics microscopy (FOM), were used in the inspection of railways for the tracing of defects and deterioration signs. In the first instance, two different approaches (dynamic and pulsed thermography) were used, whilst in the case of FOM, microscopic characterisation of the railway heads and classification of the deterioration -- damage on the railways according to the UIC (International Union of Railways) code, took place. Results from both techniques are presented and discussed.
Resumo:
Satellite-based Synthetic Aperture Radar (SAR) has proved useful for obtaining information on flood extent, which, when intersected with a Digital Elevation Model (DEM) of the floodplain, provides water level observations that can be assimilated into a hydrodynamic model to decrease forecast uncertainty. With an increasing number of operational satellites with SAR capability, information on the relationship between satellite first visit and revisit times and forecast performance is required to optimise the operational scheduling of satellite imagery. By using an Ensemble Transform Kalman Filter (ETKF) and a synthetic analysis with the 2D hydrodynamic model LISFLOOD-FP based on a real flooding case affecting an urban area (summer 2007,Tewkesbury, Southwest UK), we evaluate the sensitivity of the forecast performance to visit parameters. We emulate a generic hydrologic-hydrodynamic modelling cascade by imposing a bias and spatiotemporal correlations to the inflow error ensemble into the hydrodynamic domain. First, in agreement with previous research, estimation and correction for this bias leads to a clear improvement in keeping the forecast on track. Second, imagery obtained early in the flood is shown to have a large influence on forecast statistics. Revisit interval is most influential for early observations. The results are promising for the future of remote sensing-based water level observations for real-time flood forecasting in complex scenarios.