871 resultados para Perinatal results in Spain
Resumo:
Questions relating to the transport of radioactive materials are very much an issue of current interest due to the increasing mobility of the materials involved in the nuclear fuel cycle, commitment to the environment, the safety and protection of persons and the corresponding regulatory legal framework. The radiological impact associated with this type of transport was assessed by means of a new data-processing tool that may be of use and serve as complementary documentation to that included in transport regulations. Thus, by determining the level of radiation at a distance of one metre from the transport vehicle and by selecting a route, the associated impacts will be obtained, such as the affected populations, the dose received by the most highly exposed individual, the overall radiological impact, the doses received by the population along the route and the possible detriment to their health. The most important conclusion is that the emissions of ionising radiation from the transport of radioactive material by road in Spain are not significant as regards the generation of adverse effects on human health, and that their radiological impact may be considered negligible.
Resumo:
In the last years, vulnerability assessment has emerged as a need for policy making instead of being a pure academic exercise (Hinkel, 2010). In the current context of changing climate, increasing water scarcity threatens economic activities in many arid or semi-arid regions of the World. Climate change (CC) science and policy debates have traditionally focused on CC mitigation and impact assessment (Krysanova et al., 2010). However, even if mitigation policies are successfully enforced some climate change is still expected. Then, adaptation is strongly necessary and, for that, improved knowledge on vulnerability and adaptive capacity is required.
Resumo:
The main objective of this article is to characterize the reverse logistics system for mobile phones in Spain. The study includes the characterization of the different actors involved in the reverse logistics system and the description of the most common logistics practices in the sector. We will also opose alternative practices for managing this complex reverse logistics system and finally, we analyse the challenges of the current reverse logistics model. Some alternatives for the current model are location of reception points for end-of-use mobiles, the need to legislate the secondhand mobile phone market, and the location of the necessary recycling centres according to current legislation.
Resumo:
The main objective of this paper is to propose a model for helping logistics managers to choose the appropriate location points in order to situate the collection points for used portable batteries. The proposed model has two parts: a static part and a dynamic part. We can conclude that this model helps managers in the decision of locating/modifying collection points in two ways: to add new collection points to a reverse logistics network that needs more points or to delete collection points from a network that has more points than those recommended.
Resumo:
The authors are from UPM and are relatively grouped, and all have intervened in different academic or real cases on the subject, at different times as being of different age. With precedent from E. Torroja and A. Páez in Madrid Spain Safety Probabilistic models for concrete about 1957, now in ICOSSAR conferences, author J.M. Antón involved since autumn 1967 for euro-steel construction in CECM produced a math model for independent load superposition reductions, and using it a load coefficient pattern for codes in Rome Feb. 1969, practically adopted for European constructions, giving in JCSS Lisbon Feb. 1974 suggestion of union for concrete-steel-al.. That model uses model for loads like Gumbel type I, for 50 years for one type of load, reduced to 1 year to be added to other independent loads, the sum set in Gumbel theories to 50 years return period, there are parallel models. A complete reliability system was produced, including non linear effects as from buckling, phenomena considered somehow in actual Construction Eurocodes produced from Model Codes. The system was considered by author in CEB in presence of Hydraulic effects from rivers, floods, sea, in reference with actual practice. When redacting a Road Drainage Norm in MOPU Spain an optimization model was realized by authors giving a way to determine the figure of Return Period, 10 to 50 years, for the cases of hydraulic flows to be considered in road drainage. Satisfactory examples were a stream in SE of Spain with Gumbel Type I model and a paper of Ven Te Chow with Mississippi in Keokuk using Gumbel type II, and the model can be modernized with more varied extreme laws. In fact in the MOPU drainage norm the redacting commission acted also as expert to set a table of return periods for elements of road drainage, in fact as a multi-criteria complex decision system. These precedent ideas were used e.g. in wide Codes, indicated in symposia or meetings, but not published in journals in English, and a condensate of contributions of authors is presented. The authors are somehow involved in optimization for hydraulic and agro planning, and give modest hints of intended applications in presence of agro and environment planning as a selection of the criteria and utility functions involved in bayesian, multi-criteria or mixed decision systems. Modest consideration is made of changing in climate, and on the production and commercial systems, and on others as social and financial.
Resumo:
The relationship between different learning evaluation methods and the academic success in an aeronautical engineering degree in Spain is analysed. The study is based on data about the evolution of academic achievement obtained along the last ten year, along which the evaluation and learning’s methods have suffered huge changes.
Resumo:
El Sistema de Seguros Agrarios con el Seguro de cobertura de los daños por sequía en los pastos aprovechados por el ganado en régimen extensivo (línea de seguro 133) aplica la teledetección mediante un índice de vegetación (NDVI), con el fin de solucionar los problemas de peritación que surgen cuando se tiene que determinar la cantidad y calidad del pasto afectado por la sequía. Por ello el seguro de cobertura de los daños por sequía en pastos es el principal instrumento para hacer frente al gasto que supone la necesidad de suplemento de alimentación del ganado reproductor debido a la sequía. En las comarcas de Vitigudino, Trujillo y Valle de los Pedroches (España) se comparó la evolución del seguro de sequía en pastos desde 2006 a 2010 con un modelo matemático de crecimiento del pasto en función de las variables ecofisiológicas y ambientales. Sumadas las decenas de sequía extrema y sequía leve, el modelo matemático contabilizó un número mayor de decenas que las proporcionadas por Agroseguro. La recomendación es comparar las curvas de crecimiento del pasto con las curvas de evolución del NDVI, para ajustar ambos modelos
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
The art of construction is a risky activity that directly affects the life and physical integrity of persons. Since the approval of Law 31/1995, of November 8, Prevention of Occupational Risks was the first legislation that established the current basis in all sectors and then transposed into Spanish law Directive 92/57/CEE called Royal Decree 1627/1997 of October 24, on minimum safety and health dispositions in construction works, measures have been proposed to develop a mixed body of scientific literature composed of researchers and professionals in the field of occupational safety and health, but even today there is still no clear and firm proposal, showing a lack of awareness in the occupational risk prevention and, therefore, a consolidation of the culture of prevention in society. Therefore, the technicians, who make up the building process, can incur in very high responsibilities, such as: Author of the project, Coordinator of Safety and Health during the preparation of the project and during the execution of works, Site Management: Site Manager. This involves the immediate creation of a general training in prevention for all architects starting when still studying, as well as specific training, appropriate and complementary to all the architects that will be devoted to the specialty of occupational safety and health in construction works. That is, first, we must make the responsible bodies aware of the urgent need to integrate risk prevention in the curricula of architecture and later in the continuing education of the profession. It is necessary that our teaching must conform to the laws on safety and health, due to the fact that the law recognizes our academic degrees and professional qualifications to perform functions in that area
Resumo:
The use of photovoltaic experimental plants in engineering educational buildings contributes to an increase in acceptance of this technology by future engineers. There are some photovoltaic (PV) systems in educational buildings in Spain, but they are usually limited to buildings in relation to electrical technologies or research areas. They are not common in other educational or official buildings. This paper presents the project of a grid-connected solar plant with two main objectives. First, different PV module technologies will be compared. Second, an emphasis on agronomical areas in educational settings will be reviewed in an attempt to facilitate student engagement in the use of the power plant. The system is grid-connected in order to pay-back the investment in the plant. In fact the electricity generated by the plant will be used by the installations of the building, as it is the closest consumer. This work intends to approximate photovoltaic technology to university degrees not directly related with it and at the same time research in comparison of systems with different technologies. This is a good example of an solar plant for both optimum production and educational purposes.
Resumo:
After joining the European Union in 1986, Spain experienced steady economic growth that enabled the country to grow at a greater pace than other European countries. During this period, the government of Spain opted for major investments in public infrastructure by taking advantage both of the funding provided by the European Union and of several types of public-private-partnership (PPP) approaches. Within this framework, the government of Spain between 1996 and 2004 procured a series of toll highway concessions. These concessions entered into operation a few years before the global economic recession made itself felt in Spain. The concession contracts signed between the government and some private consortia allocated most of the risks (expropriation, construction, and traffic) to the private sector. In this paper the impact that the economic recession has had on the business performance of the concessionaires is assessed, and the effectiveness of the measures adopted by the government to help the concessionaire to avoid bankruptcy is analyzed. It was found that some of the guarantees offered by the legal framework to the concessionaires in case of bankruptcy are prompting an outcome that could negatively affect the users. In addition to that, some suggestions as to how to better allocate risk in toll highway concessions in the future are provided.
Resumo:
This study assessed the inaccuracy of the traffic estimates for toll motorway concessions in Spain. It was found that the estimates conducted by both the government and the concessionaire showed a significant bias towards overestimating traffic. The level of overestimation in Spain is even greater than that reported by other studies based on worldwide data. The notorious levels of overestimation entail severe burdens to the economics of the concessionaires that often prompt renegotiations of the contracts, which are often accepted by the government. These renegotiations usually end up with toll changes or extension of the concession terms, which have to be ultimately borne by future motorway users. It is postulated herein that the bias towards overestimating traffic in toll motorways in Spain is mostly caused by strategic issues rather than by modelling errors.
Resumo:
In many cases the only places available for the construction of a new car park are the existing streets or roads. These streets may also have important or historic buildings very close to the structure, which means that they cannot be disturbed in any way during the construction of the parking structure. In many cases the only places available for the construction of a new car park are the existing streets or roads. These streets may also have important or historic buildings very close to the structure, which means that they cannot be disturbed in any way during the construction of the parking structure.
Resumo:
This paper proposes a method for assessing the groundwater renewable reserves of large regions for an average year, based on the integration of the recession curves for their basins springs or the natural base flow of their rivers. In this method, the hydrodynamic volume (or renewable reserves), were estimated from the baseflow equation. It was assumed that the flow was the same as the natural recharge, and that the recession coefficients were derived by the hydrogeological parameters and geometrical characteristics of aquifers, and adjusted to fit the recession curves at gauging stations. The method was applied to all the aquifers of Spain, which have a total groundwater renewable reserve of 86,895 hm3 four times the mean annual recharge. However, the distribution of these reserves is very variable; 18.6% of the country aquifers contain 94.7% of the entire reserve.