862 resultados para Multi-conductor transmission lines
Resumo:
The performance of unrepeatered transmission of a seven Nyquist-spaced 10 GBd PDM-16QAM superchannel using full signal band coherent detection and multi-channel digital back propagation (MC-DBP) to mitigate nonlinear effects is analysed. For the first time in unrepeatered transmission, the performance of two amplification systems is investigated and directly compared in terms of achievable information rates (AIRs): 1) erbium-doped fibre amplifier (EDFA) and 2) second-order bidirectional Raman pumped amplification. The experiment is performed over different span lengths, demonstrating that, for an AIR of 6.8 bit/s/Hz, the Raman system enables an increase of 93 km (36 %) in span length. Further, at these distances, MC-DBP gives an improvement in AIR of 1 bit/s/Hz (to 7.8 bit/s/Hz) for both amplification schemes. The theoretical AIR gains for Raman and MC-DBP are shown to be preserved when considering low-density parity-check codes. Additionally, MC-DBP algorithms for both amplification schemes are compared in terms of performance and computational complexity. It is shown that to achieve the maximum MC-DBP gain, the Raman system requires approximately four times the computational complexity due to the distributed impact of fibre nonlinearity.
Resumo:
Au cours des dernières années, la photonique intégrée sur silicium a progressé rapidement. Les modulateurs issus de cette technologie présentent des caractéristiques potentiellement intéressantes pour les systèmes de communication à courte portée. En effet, il est prévu que ces modulateurs pourront être opérés à des vitesses de transmission élevées, tout en limitant le coût de fabrication et la consommation de puissance. Parallèlement, la modulation d’amplitude multi-niveau (PAM) est prometteuse pour ce type de systèmes. Ainsi, ce travail porte sur le développement de modulateurs de silicium pour la transmission de signaux PAM. Dans le premier chapitre, les concepts théoriques nécessaires à la conception de modulateurs de silicium sont présentés. Les modulateurs Mach-Zehnder et les modulateurs à base de réseau de Bragg sont principalement abordés. De plus, les effets électro-optiques dans le silicium, la modulation PAM, les différents types d’électrodes intégrées et la compensation des distorsions par traitement du signal sont détaillés.Dans le deuxième chapitre, un modulateur Mach-Zehnder aux électrodes segmentées est présenté. La segmentation des électrodes permet la génération de signaux optiques PAM à partir de séquences binaires. Cette approche permet d’éliminer l’utilisation de convertisseur numérique-analogique en intégrant cette fonction dans le domaine optique, ce qui vise à réduire le coût du système de communication. Ce chapitre contient la description détaillée du modulateur, les résultats de caractérisation optique et de la caractérisation électrique, ainsi que les tests systèmes. De plus, les tests systèmes incluent l’utilisation de pré-compensation ou de post-compensation du signal sous la forme d’égalisation de la réponse en fréquence pour les formats de modulation PAM-4 et PAM-8 à différents taux binaires. Une vitesse de transmission de 30 Gb/s est démontrée dans les deux cas et ce malgré une limitation importante de la réponse en fréquence suite à l’ajout d’un assemblage des circuits radiofréquences (largeur de bande 3 dB de 8 GHz). Il s’agit de la première démonstration de modulation PAM-8 à l’aide d’un modulateur Mach-Zehnder aux électrodes segmentées. Finalement, les conclusions tirées de ce travail ont mené à la conception d’un deuxième modulateur Mach-Zehnder aux électrodes segmentées présentement en phase de test, dont les performances montrent un très grand potentiel. Dans le troisième chapitre, un modulateur à réseau de Bragg à deux sauts de phase est présenté. L’utilisation de réseaux de Bragg est une approche encore peu développée pour la modulation. En effet, la réponse spectrale de ces structures peut être contrôlée précisément, une caractéristique intéressante pour la conception de modulateurs. Dans ces travaux, nous proposons l’ajout de deux sauts de phase à un réseau de Bragg uniforme pour obtenir un pic de transmission dans la bande de réflexion de celui-ci. Ainsi, il est possible d’altérer l’amplitude du pic de transmission à l’aide d’une jonction pn. Comme pour le deuxième chapitre, ce chapitre inclut la description détaillée du modulateur, les résultats des caractérisations optique et électrique, ainsi que les tests systèmes. De plus, la caractérisation de jonctions pn à l’aide du modulateur à réseau de Bragg est expliquée. Des vitesses de transmission PAM-4 de 60 Gb/s et OOK de 55 Gb/s sont démontrées après la compensation des distorsions des signaux. À notre connaissance, il s’agit du modulateur à réseau de Bragg le plus rapide à ce jour. De plus, pour la première fois, les performances d’un tel modulateur s’approchent de celles des modulateurs de silicium les plus rapides utilisant des microrésonateurs en anneau ou des interféromètres Mach-Zehnder.
Resumo:
The load–frequency control (LFC) problem has been one of the major subjects in a power system. In practice, LFC systems use proportional–integral (PI) controllers. However since these controllers are designed using a linear model, the non-linearities of the system are not accounted for and they are incapable of gaining good dynamical performance for a wide range of operating conditions in a multi-area power system. A strategy for solving this problem because of the distributed nature of a multi-area power system is presented by using a multi-agent reinforcement learning (MARL) approach. It consists of two agents in each power area; the estimator agent provides the area control error (ACE) signal based on the frequency bias estimation and the controller agent uses reinforcement learning to control the power system in which genetic algorithm optimisation is used to tune its parameters. This method does not depend on any knowledge of the system and it admits considerable flexibility in defining the control objective. Also, by finding the ACE signal based on the frequency bias estimation the LFC performance is improved and by using the MARL parallel, computation is realised, leading to a high degree of scalability. Here, to illustrate the accuracy of the proposed approach, a three-area power system example is given with two scenarios.
Resumo:
IEC Technical Committee 57 (TC57) published a series of standards and technical reports for “Communication networks and systems for power utility automation” as the IEC 61850 series. Sampled value (SV) process buses allow for the removal of potentially lethal voltages and damaging currents inside substation control rooms and marshalling kiosks, reduce the amount of cabling required in substations, and facilitate the adoption of non-conventional instrument transformers. IEC 61850-9-2 provides an inter-operable solution to support multi-vendor process bus solutions. A time synchronisation system is required for a SV process bus, however the details are not defined in IEC 61850-9-2. IEEE Std 1588-2008, Precision Time Protocol version 2 (PTPv2), provides the greatest accuracy of network based time transfer systems, with timing errors of less than 100 ns achievable. PTPv2 is proposed by the IEC Smart Grid Strategy Group to synchronise IEC 61850 based substation automation systems. IEC 61850-9-2, PTPv2 and Ethernet are three complementary protocols that together define the future of sampled value digital process connections in substations. The suitability of PTPv2 for use with SV is evaluated, with preliminary results indicating that steady state performance is acceptable (jitter < 300 ns), and that extremely stable grandmaster oscillators are required to ensure SV timing requirements are met when recovering from loss of external synchronisation (such as GPS).
Resumo:
Proposed transmission smart grids will use a digital platform for the automation of substations operating at voltage levels of 110 kV and above. The IEC 61850 series of standards, released in parts over the last ten years, provide a specification for substation communications networks and systems. These standards, along with IEEE Std 1588-2008 Precision Time Protocol version 2 (PTPv2) for precision timing, are recommended by the both IEC Smart Grid Strategy Group and the NIST Framework and Roadmap for Smart Grid Interoperability Standards for substation automation. IEC 61850-8-1 and IEC 61850-9-2 provide an inter-operable solution to support multi-vendor digital process bus solutions, allowing for the removal of potentially lethal voltages and damaging currents from substation control rooms, a reduction in the amount of cabling required in substations, and facilitates the adoption of non-conventional instrument transformers (NCITs). IEC 61850, PTPv2 and Ethernet are three complementary protocol families that together define the future of sampled value digital process connections for smart substation automation. This paper describes a specific test and evaluation system that uses real time simulation, protection relays, PTPv2 time clocks and artificial network impairment that is being used to investigate technical impediments to the adoption of SV process bus systems by transmission utilities. Knowing the limits of a digital process bus, especially when sampled values and NCITs are included, will enable utilities to make informed decisions regarding the adoption of this technology.
Resumo:
Deterministic transit capacity analysis applies to planning, design and operational management of urban transit systems. The Transit Capacity and Quality of Service Manual (1) and Vuchic (2, 3) enable transit performance to be quantified and assessed using transit capacity and productive capacity. This paper further defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures the transit task performed over distance. Passenger transmission (p-km/h) captures the passenger task delivered by service at speed. Transit productiveness (p-km/h) captures transit work performed over time. These measures are useful to operators in understanding their services’ or systems’ capabilities and passenger quality of service. This paper accounts for variability in utilized demand by passengers along a line and high passenger load conditions where passenger pass-up delay occurs. A hypothetical case study of an individual bus service’s operation demonstrates the usefulness of passenger transmission in comparing existing and growth scenarios. A hypothetical case study of a bus line’s operation during a peak hour window demonstrates the theory’s usefulness in examining the contribution of individual services to line productive performance. Scenarios may be assessed using this theory to benchmark or compare lines and segments, conditions, or consider improvements.
Resumo:
Performance of urban transit systems may be quantified and assessed using transit capacity and productive capacity in planning, design and operational management activities. Bunker (4) defines important productive performance measures of an individual transit service and transit line, which are extended in this paper to quantify efficiency and operating fashion of transit services and lines. Comparison of a hypothetical bus line’s operation during a morning peak hour and daytime hour demonstrates the usefulness of productiveness efficiency and passenger transmission efficiency, passenger churn and average proportion line length traveled to the operator in understanding their services’ and lines’ productive performance, operating characteristics, and quality of service. Productiveness efficiency can flag potential pass-up activity under high load conditions, as well as ineffective resource deployment. Proportion line length traveled can directly measure operating fashion. These measures can be used to compare between lines/routes and, within a given line, various operating scenarios and time horizons to target improvements. The next research stage is investigating within-line variation using smart card passenger data and field observation of pass-ups. Insights will be used to further develop practical guidance to operators.
Resumo:
Performance of urban transit systems may be quantified and assessed using transit capacity and productive capacity in planning, design and operational management activities. Bunker (4) defines important productive performance measures of an individual transit service and transit line, which are extended in this paper to quantify efficiency and operating fashion of transit services and lines. Comparison of a hypothetical bus line’s operation during a morning peak hour and daytime hour demonstrates the usefulness of productiveness efficiency and passenger transmission efficiency, passenger churn and average proportion line length traveled to the operator in understanding their services’ and lines’ productive performance, operating characteristics, and quality of service. Productiveness efficiency can flag potential pass-up activity under high load conditions, as well as ineffective resource deployment. Proportion line length traveled can directly measure operating fashion. These measures can be used to compare between lines/routes and, within a given line, various operating scenarios and time horizons to target improvements. The next research stage is investigating within-line variation using smart card passenger data and field observation of pass-ups. Insights will be used to further develop practical guidance to operators.
Resumo:
A novel intelligent online demand side management system is proposed for peak load management in low-voltage distribution networks. This method uses low-cost controllers with low-bandwidth two-way communication installed in custumers’ premises and at distribution transformers to manage the peak load while maximising customer satisfaction. A multi-objective decision making process is proposed to select the load(s) to be delayed or controlled. The efficacy of the proposed control system is verified by simulation of three different feeder types.
Resumo:
In the decision-making of multi-area ATC (Available Transfer Capacity) in electricity market environment, the existing resources of transmission network should be optimally dispatched and coordinately employed on the premise that the secure system operation is maintained and risk associated is controllable. The non-sequential Monte Carlo simulation is used to determine the ATC probability density distribution of specified areas under the influence of several uncertainty factors, based on which, a coordinated probabilistic optimal decision-making model with the maximal risk benefit as its objective is developed for multi-area ATC. The NSGA-II is applied to calculate the ATC of each area, which considers the risk cost caused by relevant uncertainty factors and the synchronous coordination among areas. The essential characteristics of the developed model and the employed algorithm are illustrated by the example of IEEE 118-bus test system. Simulative result shows that, the risk of multi-area ATC decision-making is influenced by the uncertainties in power system operation and the relative importance degrees of different areas.
Resumo:
Performance of urban transit systems may be quantified and assessed using transit capacity and productive capacity in planning, design and operational management activities. Bunker (4) defines important productive performance measures of an individual transit service and transit line, which are extended in this paper to quantify efficiency and operating fashion of transit services and lines. Comparison of a hypothetical bus line’s operation during a morning peak hour and daytime hour demonstrates the usefulness of productiveness efficiency and passenger transmission efficiency, passenger churn and average proportion line length traveled to the operator in understanding their services’ and lines’ productive performance, operating characteristics, and quality of service. Productiveness efficiency can flag potential pass-up activity under high load conditions, as well as ineffective resource deployment. Proportion line length traveled can directly measure operating fashion. These measures can be used to compare between lines/routes and, within a given line, various operating scenarios and time horizons to target improvements. The next research stage is investigating within-line variation using smart card passenger data and field observation of pass-ups. Insights will be used to further develop practical guidance to operators.
Resumo:
This paper describes the results of experiments made in the vicinity of EHV overhead lines to investigate sources of clouds of charged particles using simultaneously-recording arrays of electric field meters to measure direct electric fields produced under ion clouds. E-field measurements, made at one metre above ground level, are correlated with wind speed and direction, and with measurements from ionisation counters and audible corona effects to identify possible positions of sources of corona on adjacent power lines. Measurements made in dry conditions on EHV lines in flat remote locations with no adjacent buildings or large vegetation indicate the presence of discrete ion sources associated with high stress points on some types of line hardware such as connectors and conductor spacers. Faulty line components such as insulators and line fittings are also found to be a possible source of ion clouds.
Resumo:
An electromagnetically coupled feed arrangement is proposed for simultaneously exciting multiple concentric ring antennas for multi-frequency operation. This has a multi-layer dielectric configuration in which a transmission line is embedded below the layer containing radiating rings. Energy coupled to these rings from the line beneath is optimised by suitably adjusting the location and dimensions of stubs on the line. It has been shown that the resonant frequencies of these rings do not change as several of these single-frequency antennas are combined to form a multi-resonant antenna. Furthermore, all radiators are forced to operate at their primary mode and some harmonics of the lower resonant frequency rings appearing within the frequency range are suppressed when combined. The experimental prototype antenna has three resonant frequencies at which it has good radiation characteristics.
Resumo:
Banana bunchy top virus (BBTV) was readily transmitted through tissue culture in banana (Mum sp.) cv. Lady finger (AAB) and Cavendish cv. Williams (AAA). Lines derived from infected and healthy field plants had similar in vitro multiplication rates. BBTV infected in vitro cultures displayed symptoms of stunting, leaf curling, chlorotic and green flecks, and poor root growth. Symptoms became milder with time, and were often difficult to discern in older, rapidly multiplying cultures. A triple antibody sandwich ELISA using polyclonal and monoclonal antibodies was very efficient for detecting BBTV in vitro. Symptomless, ELISA-negative plants arose in 10 out of 11 lines derived from BBTV-infected field plants and first appeared after 9 months continuous in vitro culture at a constant 28OC. Meristem tip culture or heat therapy was not used. These plants remained symptomless and ELISA-negative after planting out in the glasshouse (individual plants checked for up to 16 months). The implications of this inconsistent transmission of BBTV for germplasm indexing and exchange are discussed.