990 resultados para Edison Electric Light Company
Resumo:
Jornadas "Ciência nos Açores- que futuro?", Biblioteca Pública e Arquivo Regional de Ponta Delgada, Largo do Colégio, Ponta Delgada, 7-8 de junho de 2013.
Resumo:
A start-up circuit, used in a micro-power indoor light energy harvesting system, is described. This start-up circuit achieves two goals: first, to produce a reset signal, power-on-reset (POR), for the energy harvesting system, and secondly, to temporarily shunt the output of the photovoltaic (PV) cells, to the output node of the system, which is connected to a capacitor. This capacitor is charged to a suitable value, so that a voltage step-up converter starts operating, thus increasing the output voltage to a larger value than the one provided by the PV cells. A prototype of the circuit was manufactured in a 130 nm CMOS technology, occupying an area of only 0.019 mm(2). Experimental results demonstrate the correct operation of the circuit, being able to correctly start-up the system, even when having an input as low as 390 mV using, in this case, an estimated energy of only 5.3 pJ to produce the start-up.
Resumo:
ECER 2014 "The Past, the Present and Future of Educational Research in Europe" will take place at the University of Porto from 1 - 5 September 2014.
Resumo:
Este trabalho na área dos processos físicos de separação por membranas, nomeadamente, a nanofiltração (NF), tem como objectivo principal a recuperação dos efluentes resultantes das águas da 3ª lavagem utilizadas na operação de tingimento de fibras de algodão, com corantes reactivos. Estão inerentes as problemáticas: da escassez da água como matéria-prima na vertente de água potável; da diminuição de efluentes que necessitam de tratamentos devido à sua carga poluente; da recuperação sempre que seja viável dos produtos químicos adicionados nesta fase de tratamento das fibras de algodão e por último e não menos importante, da energia contida nestes efluentes que vão para o esgoto a temperaturas na ordem dos 50 ºC. A metodologia adoptada na realização deste trabalho consistiu, inicialmente num estudo sobre os trabalhos realizados até hoje nesta área, seguindo-se a recolha dos efluentes na empresa ―Estamparia Têxtil Adalberto Pinto da Silva, S.A.‖ (ETAPS) e posterior estudo da recuperação dos efluentes em causa pelo processo de NF utilizando a membrana NF270-2540 da empresa FILMTEC. Os efluentes estudados no presente trabalho continham corantes reactivos sendo um corante azul-claro (CAC) de composição (Amarelo Bril Remazol GL 150% + Azul Brilhante Remazol BB 133% + Azul Turqueza Remazol G) e o outro corante azul-marinho (CAM) de composição (Preto Remazol B 133% + Vermelho Remazol RGB + Amarelo Ouro Remazol RGB). Estes estudos de recuperação compreenderam basicamente 3 fases: caracterização do efluente recolhido na empresa; tratamento desse efluente utilizando uma instalação piloto de NF de fluxo cruzado ou também conhecido por membrana de fluxo tangencial instalado no Laboratório de Tecnologia (LT) do Instituto Superior de Engenharia do Porto (ISEP), e caracterização dos permeados e dos rejeitados obtidos. A análise de resultados do presente trabalho permitiu concluir ser possível a recuperação e reutilização das 3ª águas de lavagem do processo de tingimento quando tratadas pelo processo de NF a pressões de operação de 6 bar. Nestas circunstâncias os permeados obtidos (tanto no efluente com corante azul-claro como no efluente com corante azul-marinho) apresentam valores, em todos os parâmetros estudados, significativamente abaixo dos valores limites recomendáveis para uma água de abastecimento na Industria Têxtil (IT). Salienta-se reduções mais expressivas nos permeados do corante CAM, com vários parâmetros a sofrerem reduções no intervalo de 98 a 100%, nomeadamente, na cor, turvação, CQO, dureza total, alumínio e manganês. Os resultados obtidos para as pressões de operação de 4 e 8 bar mostram alguns parâmetros com valores acima dos recomendados para uma água de abastecimento na Indústria Têxtil, nomeadamente a cor no corante CAC quando se opera a 4 bar e no corante CAM quando se opera a 8 bar e os sulfatos e ferro no CAM à pressão de 4 bar. Estes resultados mostram ser possível a reutilização da água na própria instalação industrial, trazendo um benefício económico e ambiental, pela redução no consumo de água fresca e energia, além da redução do volume de efluentes que necessitam ser tratados, estando na mesma linha de pensamento de Gross et al (1999), que refere que o uso de membranas para o tratamento de efluentes do processo de tingimento tem como principal objectivo a viabilidade económica, a redução no consumo de água, de sais, de corantes e energia, bem como, a redução do volume de efluentes a ser tratado.
Resumo:
The introduction of electricity markets and integration of Distributed Generation (DG) have been influencing the power system’s structure change. Recently, the smart grid concept has been introduced, to guarantee a more efficient operation of the power system using the advantages of this new paradigm. Basically, a smart grid is a structure that integrates different players, considering constant communication between them to improve power system operation and management. One of the players revealing a big importance in this context is the Virtual Power Player (VPP). In the transportation sector the Electric Vehicle (EV) is arising as an alternative to conventional vehicles propel by fossil fuels. The power system can benefit from this massive introduction of EVs, taking advantage on EVs’ ability to connect to the electric network to charge, and on the future expectation of EVs ability to discharge to the network using the Vehicle-to-Grid (V2G) capacity. This thesis proposes alternative strategies to control these two EV modes with the objective of enhancing the management of the power system. Moreover, power system must ensure the trips of EVs that will be connected to the electric network. The EV user specifies a certain amount of energy that will be necessary to charge, in order to ensure the distance to travel. The introduction of EVs in the power system turns the Energy Resource Management (ERM) under a smart grid environment, into a complex problem that can take several minutes or hours to reach the optimal solution. Adequate optimization techniques are required to accommodate this kind of complexity while solving the ERM problem in a reasonable execution time. This thesis presents a tool that solves the ERM considering the intensive use of EVs in the smart grid context. The objective is to obtain the minimum cost of ERM considering: the operation cost of DG, the cost of the energy acquired to external suppliers, the EV users payments and remuneration and penalty costs. This tool is directed to VPPs that manage specific network areas, where a high penetration level of EVs is expected to be connected in these areas. The ERM is solved using two methodologies: the adaptation of a deterministic technique proposed in a previous work, and the adaptation of the Simulated Annealing (SA) technique. With the purpose of improving the SA performance for this case, three heuristics are additionally proposed, taking advantage on the particularities and specificities of an ERM with these characteristics. A set of case studies are presented in this thesis, considering a 32 bus distribution network and up to 3000 EVs. The first case study solves the scheduling without considering EVs, to be used as a reference case for comparisons with the proposed approaches. The second case study evaluates the complexity of the ERM with the integration of EVs. The third case study evaluates the performance of scheduling with different control modes for EVs. These control modes, combined with the proposed SA approach and with the developed heuristics, aim at improving the quality of the ERM, while reducing drastically its execution time. The proposed control modes are: uncoordinated charging, smart charging and V2G capability. The fourth and final case study presents the ERM approach applied to consecutive days.
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica
Resumo:
The possibility of creating baryon asymmetry at the electroweak phase transition in the minimal supersymmetric standard model is considered for the case when right-handed squarks are much lighter than left-handed ones. It is shown that the usual requirement upsilon(T-c)/T-c greater than or similar to 1 for baryogenesis can be satisfied in a range of the parameters of the model, consistent with present experimental bounds.
Resumo:
To determine self-consistently the time evolution of particle size and their number density in situ multi-angle polarization-sensitive laser light scattering was used. Cross-polarization intensities (incident and scattered light intensities with opposite polarization) measured at 135 degrees and ex situ transmission electronic microscopy analysis demonstrate the existence of nonspherical agglomerates during the early phase of agglomeration. Later in the particle time development both techniques reveal spherical particles again. The presence of strong cross-polarization intensities is accompanied by low-frequency instabilities detected on the scattered light intensities and plasma emission. It is found that the particle radius and particle number density during the agglomeration phase can be well described by the Brownian free molecule coagulation model. Application of this neutral particle coagulation model is justified by calculation of the particle charge whereby it is shown that particles of a few tens of nanometer can be considered as neutral under our experimental conditions. The measured particle dispersion can be well described by a Brownian free molecule coagulation model including a log-normal particle size distribution. (C) 1996 American Institute of Physics.
Resumo:
Com o aumento da população mundial registado nos últimos anos surgiu também uma maior procura energética. Esse aumento foi inicialmente colmatado recorrendo essencialmente a fontes de origem fóssil, pelo facto destas serem mais baratas. No entanto, essa tendência de preços baixos sofreu o primeiro abalo nos anos 70 do século passado, altura em que o preço do petróleo disparou, devido a questões políticas. Nessa altura ficou visível para os países ocidentais o quanto estes eram dependentes dos países produtores de petróleo que, em geral, são instáveis politicamente. Começou então a procura de fontes energéticas alternativas. Além da questão económica do aumento do preço dos combustíveis, existe também o problema ambiental. Os maiores responsáveis pela emissão de gases efeito estufa (GEE) são os combustíveis fósseis. Os GEE contribuem para o aquecimento global, o que origina fenómenos ambientais severos que poderão levar a mudanças climáticas significativas. As energias renováveis apresentam-se como a solução mais viável ao problema energético e ambiental que se verifica actualmente, porque permitem colmatar o aumento da procura energética de uma forma limpa e sustentável. Na sequência destes problemas surgiram nos últimos anos veículos que permitem reduzir ou mesmo eliminar o consumo de combustíveis fósseis, como os veículos híbridos eléctricos, eléctricos e a hidrogénio. Nesta dissertação analisa-se um sistema que foi pensado para ser implementado em áreas de serviço, que permite efectuar o carregamento de electric vehicles (EV) utilizando energia eléctrica de origem fotovoltaica e a produção de hidrogénio para os fuels cell electric vehicles (FCEV). É efectuada uma análise económica do sistema, uma análise ambiental e analisou-se também o impacto na redução da dependência do país em relação ao exterior, sendo ainda efectuada uma pequena análise ao sistema MOBIE. No caso dos veículos a hidrogénio, foi determinada qual seria a melhor opção em termos económicos, para a produção de hidrogénio considerando três regimes de produção: recorrendo apenas à energia eléctrica proveniente do sistema fotovoltaico, apenas à energia eléctrica da rede, ou uma combinação dos dois regimes. O sistema estudado nesta dissertação apresenta um enorme potencial a nível energético e ambiental, surgindo como alternativa para abastecer os veículos que irão permitir, no futuro, eliminar a dependência energética em relação às fontes fósseis e ao mesmo tempo diminuir a quantidade de gases efeito estufa emitidos para a atmosfera.
Resumo:
Agências financiadoras: National Natural Science Foundation of China - 61204077; Shenzhen Science and Technology Innovation Commission - JCYJ20120614150521967
Resumo:
Trabalho de Projeto para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização em Vias de Comunicação e Transportes
Resumo:
Com o presente trabalho é pretendido demonstrar a possibilidade de alimentação de um sistema de iluminação decorativa com recurso a soluções alternativas renováveis. O estudo é focado essencialmente na produção local de energia solar fotovoltaica e eólica. Inicialmente é efetuado o estudo técnico-económico da implementação de um sistema fotovoltaico. Posteriormente é efetuado o estudo da viabilidade técnico-económica da implementação do sistema hibrido, composto por um sistema fotovoltaico e um sistema eólico, optando pelo que mais se adequa à alimentação do sistema de iluminação decorativa exterior. Esta dissertação descreve a metodologia que procura melhorar a eficiência do sistema de led com o auxílio de ensaios em laboratório e simulação em software, com o objetivo de adaptar os sistemas de led instalados pela empresa ao sistema hibrido dimensionado. Finalmente, é efetuada a análise comparativa entre o atual sistema de iluminação decorativa e o sistema renovável dimensionado mais favorável para alimentar sistemas de iluminação decorativa. Procura-se assim com este projeto para além de apresentar um estudo teórico, proporcionar uma orientação à implementação de sistemas de microprodução destinados a alimentar sistemas de iluminação decorativa exterior.
Resumo:
Trabalho Final de Mestrado para obtenção de grau de Mestre em Engenharia Mecânica
Resumo:
Devido ao acréscimo significativo de viaturas e peões nas grandes cidades foi necessário recorrer aos mecanismos existentes para coordenar o tráfego. Nesta perspectiva surge a implementação de semáforos com o objectivo de ordenar o tráfego nas vias rodoviárias. A gestão de tráfego, tem sido sujeita a inovações tanto ao nível dos equipamentos, do software usado, gestão centralizada, monitorização das vias e na sincronização semafórica, sendo possível a criação de programas ajustados às diferentes exigências de tráfego verificadas durante as vinte e quatro horas para pontos distintos da cidade. Conceptualmente foram elaborados estudos, com o objectivo de identificar a relação entre a velocidade o fluxo e o intervalo num determinado intervalo de tempo, bem como a relação entre a velocidade e a sinistralidade. Até 1995 Portugal era um dos países com maior número de sinistros rodoviários Na sequência desta evolução foram instalados radares de controlo de velocidade no final de 2006 com o objectivo de obrigar ao cumprimento dos limites de velocidade impostos pelo código da estrada e reduzir a sinistralidade automóvel na cidade de Lisboa. Passados alguns anos sobre o investimento realizadoanteriormente, constatamos que existe a necessidade de implementar novas tecnologias na detecção das infracções, sejam estas de excesso de velocidade ou violação do semáforo vermelho (VSV), optimizar a informação disponibilizada aos automobilistas e aos peões, coordenar a interacção entre os veículos prioritários e os restantes presentes na via, dinamizar a gestão interna das contra ordenações, agilizar os procedimentos informatizar a recolha deinformação de modo a tornar os processos mais céleres.
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Energia