820 resultados para time delay in teleoperation
Resumo:
First, the non-linear response of a gyrostabilized platform to a small constant input torque is analyzed in respect to the effect of the time delay (inherent or deliberately introduced) in the correction torque supplied by the servomotor, which itself may be non-linear to a certain extent. The equation of motion of the platform system is a third order nonlinear non-homogeneous differential equation. An approximate analytical method of solution of this equation is utilized. The value of the delay at which the platform response becomes unstable has been calculated by using this approximate analytical method. The procedure is illustrated by means of a numerical example. Second, the non-linear response of the platform to a random input has been obtained. The effects of several types of non-linearity on reducing the level of the mean square response have been investigated, by applying the technique of equivalent linearization and solving the resulting integral equations by using laguerre or Gaussian integration techniques. The mean square responses to white noise and band limited white noise, for various values of the non-linear parameter and for different types of non-linearity function, have been obtained. For positive values of the non-linear parameter the levels of the non-linear mean square responses to both white noise and band-limited white noise are low as compared to the linear mean square response. For negative values of the non-linear parameter the level of the non-linear mean square response at first increases slowly with increasing values of the non-linear parameter and then suddenly jumps to a high level, at a certain value of the non-linearity parameter.
Resumo:
A framework based on the notion of "conflict-tolerance" was proposed in as a compositional methodology for developing and reasoning about systems that comprise multiple independent controllers. A central notion in this framework is that of a "conflict-tolerant" specification for a controller. In this work we propose a way of defining conflict-tolerant real-time specifications in Metric Interval Temporal Logic (MITL). We call our logic CT-MITL for Conflict-Tolerant MITL. We then give a clock optimal "delay-then-extend" construction for building a timed transition system for monitoring past-MITL formulas. We show how this monitoring transition system can be used to solve the associated verification and synthesis problems for CT-MITL.
Resumo:
We consider the classical problem of sequential detection of change in a distribution (from hypothesis 0 to hypothesis 1), where the fusion centre receives vectors of periodic measurements, with the measurements being i.i.d. over time and across the vector components, under each of the two hypotheses. In our problem, the sensor devices ("motes") that generate the measurements constitute an ad hoc wireless network. The motes contend using a random access protocol (such as CSMA/CA) to transmit their measurement packets to the fusion centre. The fusion centre waits for vectors of measurements to accumulate before taking decisions. We formulate the optimal detection problem, taking into account the network delay experienced by the vectors of measurements, and find that, under periodic sampling, the detection delay decouples into network delay and decision delay. We obtain a lower bound on the network delay, and propose a censoring scheme, where lagging sensors drop their delayed observations in order to mitigate network delay. We show that this scheme can achieve the lower bound. This approach is explored via simulation. We also use numerical evaluation and simulation to study issues such as: the optimal sampling rate for a given number of sensors, and the optimal number of sensors for a given measurement rate
Resumo:
With consideration of the modulation frequency of the input lightwave itself, we present a new model to calculate the quantum efficiency of RCE p-i-n photodetectors (PD) by superimposition of multiple reflected lightwaves. For the first time, the optical delay, another important factor limiting the electrical bandwidth of RCE p-i-n PD excluding the transit time of the carriers and RCd response of the photodetector, is analyzed and discussed in detail. The optical delay dominates the bandwidth of RCE p-i-n PD when its active layer is thinner than several 10 nm. These three limiting factors must be considered exactly for design of ultra-high-speed RCE p-i-n PD.
Resumo:
The main aim of this paper is to investigate the effects of the impulse and time delay on a type of parabolic equations. In view of the characteristics of the equation, a particular iteration scheme is adopted. The results show that Under certain conditions on the coefficients of the equation and the impulse, the solution oscillates in a particular manner-called "asymptotic weighted-periodicity".
Resumo:
In this paper, a Lyapunov function candidate is introduced for multivariable systems with inner delays, without assuming a priori stability for the nondelayed subsystem. By using this Lyapunov function, a controller is deduced. Such a controller utilizes an input-output description of the original system, a circumstance that facilitates practical applications of the proposed approach.
Resumo:
In a recent paper (Automatica 49 (2013) 2860–2866), the Wirtinger-based inequality has been introduced to derive tractable stability conditions for time-delay or sampled-data systems. We point out that there exist two errors in Theorem 8 for the stability analysis of sampled-data systems, and the correct theorem is presented.
Resumo:
Real-time monitoring applications may be used in a wireless sensor network (WSN) and may generate packet flows with strict quality of service requirements in terms of delay, jitter, or packet loss. When strict delays are imposed from source to destination, the packets must be delivered at the destination within an end-to-end delay (EED) hard limit in order to be considered useful. Since the WSN nodes are scarce both in processing and energy resources, it is desirable that they only transport useful data, as this contributes to enhance the overall network performance and to improve energy efficiency. In this paper, we propose a novel cross-layer admission control (CLAC) mechanism to enhance the network performance and increase energy efficiency of a WSN, by avoiding the transmission of potentially useless packets. The CLAC mechanism uses an estimation technique to preview packets EED, and decides to forward a packet only if it is expected to meet the EED deadline defined by the application, dropping it otherwise. The results obtained show that CLAC enhances the network performance by increasing the useful packet delivery ratio in high network loads and improves the energy efficiency in every network load.
Resumo:
The diagnosis of inflammatory bowel disease (IBD), comprising Crohn's disease (CD) and ulcerative colitis (UC), continues to present difficulties due to unspecific symptoms and limited test accuracies. We aimed to determine the diagnostic delay (time from first symptoms to IBD diagnosis) and to identify associated risk factors. A total of 1591 IBD patients (932 CD, 625 UC, 34 indeterminate colitis) from the Swiss IBD cohort study (SIBDCS) were evaluated. The SIBDCS collects data on a large sample of IBD patients from hospitals and private practice across Switzerland through physician and patient questionnaires. The primary outcome measure was diagnostic delay. Diagnostic delay in CD patients was significantly longer compared to UC patients (median 9 versus 4 months, P < 0.001). Seventy-five percent of CD patients were diagnosed within 24 months compared to 12 months for UC and 6 months for IC patients. Multivariate logistic regression identified age <40 years at diagnosis (odds ratio [OR] 2.15, P = 0.010) and ileal disease (OR 1.69, P = 0.025) as independent risk factors for long diagnostic delay in CD (>24 months). In UC patients, nonsteroidal antiinflammatory drug (NSAID intake (OR 1.75, P = 0.093) and male gender (OR 0.59, P = 0.079) were associated with long diagnostic delay (>12 months). Whereas the median delay for diagnosing CD, UC, and IC seems to be acceptable, there exists a long delay in a considerable proportion of CD patients. More public awareness work needs to be done in order to reduce patient and doctor delays in this target population.
Resumo:
Synchronization in an array of mutually coupled systems with a finite time delay in coupling is studied using the Josephson junction as a model system. The sum of the transverse Lyapunov exponents is evaluated as a function of the parameters by linearizing the equation about the synchronization manifold. The dependence of synchronization on damping parameter, coupling constant, and time delay is studied numerically. The change in the dynamics of the system due to time delay and phase difference between the applied fields is studied. The case where a small frequency detuning between the applied fields is also discussed.
Resumo:
In the present paper we use a time delay epsilon > 0 for an energy conserving approximation of the nonlinear term of the non-stationary Navier-Stokes equations. We prove that the corresponding initial value problem (N_epsilon)in smoothly bounded domains G \subseteq R^3 is well-posed. Passing to the limit epsilon \rightarrow 0 we show that the sequence of stabilized solutions has an accumulation point such that it solves the Navier-Stokes problem (N_0) in a weak sense (Hopf).
Resumo:
In 1967 a novel scheme was proposed for controlling processes with large pure time delay (Fellgett et al, 1967) and some of the constituent parts of the scheme were investigated (Swann, 1970; Atkinson et al, 1973). At that time the available computational facilities were inadequate for the scheme to be implemented practically, but with the advent of modern microcomputers the scheme becomes feasible. This paper describes recent work (Mitchell, 1987) in implementing the scheme in a new multi-microprocessor configuration and shows the improved performance it provides compared with conventional three-term controllers.
Resumo:
The British system of development control is time-consuming and uncertain in outcome. Moreover, it is becoming increasingly overloaded as it has gradually switched away from being centred on a traditional ‘is it an appropriate land-use?’ type approach to one based on multi-faceted inspections of projects and negotiations over the distribution of the potential financial gains arising from them. Recent policy developments have centred on improving the operation of development control. This paper argues that more fundamental issues may be a stake as well. Important market changes have increased workloads. Furthermore, the UK planning system's institutional framework encourages change to move in specific directions, which is not always helpful. If expectations of increased long-term housing supply are to be met more substantial changes to development control may be essential but hard to achieve.
Resumo:
There is growing international interest in the impact of regulatory controls on the supply of housing The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects from a sample of local authorities in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. If these results are representative of the country as a whole, they indicate that planning delay could be a major cause of the slow responsiveness of British housing supply.