970 resultados para risk allocation
Resumo:
Many countries over the last decade, have used performance-based contracting (PBC) to manage and maintain roads. The implementation of PBC provides additional benefits for the government/public such as cost savings and improved conditions of contracted road assets. In Australia, PBC is already being implemented on all categories of roads: national, state, urban and rural. Australian PBC arrangement is designed to turn over control and responsibility for roadway system maintenance, rehabilitation, and capital improvement projects to private contractors. Contractors’ responsibilities include determination of treatment types, the design, programming and the undertaking of works needed to maintain road networks at predetermined performance levels. Indonesia initiated two PBC pilot projects in 2011, the Pantura Section Demak-Trengguli (7.68 kilometers) in Central Java Province and Section Ciasem-Pamanukan (18.5 kilometers) in West Java Province. Both sections are categorized as national roads. The contract duration for both of these projects is four years. To facilitate a possible way forward, it is proposed to conduct a study to understand Australia's experiences of advancing from pilot projects to nation-wide programs using PBC. The study focuses on the scope of contracts, bidding processes, risk allocation, and key drivers, using relevant PBC case studies from Australia. Recommendations for future PBC deployment nation-wide should be based on more research associated with risk allocation. This will include investigation of standard conditions of contract. Implications of the contract clauses for the risk management strategy to be adopted by contractors. Based on the nature of risks, some are best managed by the project owner. It is very important that all parties involved to be open to the new rules of contract and to convince themselves about the potential increased benefits of the use of PBC. The most recent states of challenging issues were explored and described.
Resumo:
Over the years, build-operate-transfer (BOT) has continuously attracted research interests. Many studies on BOT have been carried out. Variations of BOT such as build-own-operate-transfer and build-own-operate have also been reported in some relevant publications. However, few investigations thus far have been conducted for transfer-operate-transfer (TOT). Therefore, there is a knowledge gap in this particular field. TOT is a new model that is suitable for existing infrastructure and public utility projects formerly funded by the governments and currently operated by state-owned enterprises. It refers to the transfer of a running public project to a foreign business or domestic private entity. Based on four case studies carried out in the Chinese water supply industry, this paper examines why there is an increasing need for TOT projects and identifies the distinctive features of TOT practice in China. This is followed by an introduction of a framework of critical success factors (CSFs) for TOT projects. The most important factors include project profitability, asset quality, fair risk allocation, competitive tendering, internal coordination within government, employment of professional advisors, corporate governance, and government supervision. The identification of CSFs provides a useful guidance to project parties planning to participate in TOT practice.
Resumo:
Birds frequently interact with people when they occur in coupled human-ecological or anthropogenic environments, which makes the protection of legally protected species a challenge. Flight initiation distances (FIDs) are often used to inform development of appropriate buffer distances required for human exclusion zones used to protect birds nesting in anthropogenic landscapes. Piping Plovers (Charadrius melodus) are protected by the Endangered Species Act in the United States and often nest in areas used by humans. Studies evaluating Piping Plover FIDs are limited and implementation of exclusion zones has been inconsistent across the species’ range. We measured Piping Plover response and FIDs to naturally occurring stimuli on public beaches at Lake McConaughy, Nebraska, USA. Piping Plover FIDs differed most by stimulus class (vehicle, human, dog, human with dog), Julian day, and hour of day. Piping Plover FIDs were greatest for dog and human with dog compared to humans and vehicles. For all types of stimuli, Piping Plover FIDs decreased over time during the nesting season and increased slightly during each day. In the majority of instances in which Piping Plovers left their nests, return times to the nest were relatively short (less than three minutes). These results suggest Piping Plovers become habituated to the presence of human-related stimuli over the course of a nesting season, but other explanations such as parental investment and risk allocation cannot be excluded. Additional research and improved guidance regarding the implementation of exclusion zones is needed so managers can implement effective protection programs in anthropogenic landscapes.
Resumo:
O estudo discute a repartição de riscos entre o setor público e o setor privado em contratos administrativos regidos pela Lei nº 8.666/93. Na primeira parte, ressaltam-se os novos paradigmas do Estado e as evoluções do direito administrativo no Brasil. Na segunda parte, descreve-se o modelo tradicional de contratação pública no Brasil. Na terceira parte, discute-se a constitucionalidade da repartição objetiva de riscos em contratos administrativos. Na quarta parte, delineiam-se as diretrizes a serem seguidas pelo administrador público na repartição de riscos, segundo ditames de eficiência.
Resumo:
Este trabalho analisa a sistemática de contratações inerentes à atividade de construção civil, inserida num ambiente de liberdade de contratação e levando em consideração a criação de modelos atípicos e, portanto, híbridos. Para tal, faz-se necessária uma gama de subsídios: aplicação de argumentos econômicos; capacidade de operacionalizar objetivamente as demandas oriundas de tais modalidades de contratos, que sempre visa maximizar seus resultados; necessidade de velocidade e economia de tempo nas construções. Há de se destacar que os referidos modelos de contrato são híbridos, sim, mas nem por isso ilícitos, posto que, no direito brasileiro, vigora o princípio de liberdade de contratar, desde que tais contratações estejam assentadas em princípios básicos estabelecidos por lei, quais sejam: objeto lícito, agentes capazes e atendimento à forma prescrita ou não defesa em lei. Esse ambiente de liberdade de contratação propiciou a criação de modelos atípicos e moventes de contratos de construção, que variam e se mesclam entre si sob os mais diversos aspectos, com destaque para: alocação de riscos; forma de remuneração e aplicação de penalidades, o que impacta diretamente na forma, conteúdo e valor do orçamento a ser apresentado. Desse modo, é imperioso que as rédeas desses diversos modelos de contratação estejam direcionadas pelo racional econômico, não só em grandes obras de infraestrutura, mas também em outros empreendimentos, fazendo emergir uma cultura de participação entre os contratantes, de forma a propiciar obras mais rápidas e com um menor custo, que seria de fundamental importância para o desenvolvimento do país.
Resumo:
As parcerias entre o governo e instituições da sociedade civil têm se mostrado um instrumento fundamental para a consecução das políticas públicas. O “Programa Nacional de Publicização”, focalizando os serviços públicos não-exclusivos, trouxe maior possibilidade de flexibilização da gestão dessas atividades, chamando as organizações do terceiro setor a um papel de protagonismo na oferta de serviços públicos no Brasil. A nova interação entre esses agentes cria a necessidade de melhor entendimento de suas relações jurídicas e de realinhamento de expectativas e incentivos, bem como melhor definição da alocação de riscos entre os parceiros. Este trabalho analisa as parcerias com as Organizações Sociais na área da Cultura no Estado de São Paulo. Mais especificamente, o contrato de gestão da Fundação Osesp no período de 2005 a 2015. A partir desse caso, analisamos as oportunidades e dificuldades encontradas na contratualização dos resultados, os impactos na governança corporativa da instituição, as condições de alocação dos riscos, suas formas de mitigação e as necessidades de reequilíbrio econômico-financeiro.
Resumo:
QUESTION UNDER STUDY: To assess which high-risk acute coronary syndrome (ACS) patient characteristics played a role in prioritising access to intensive care unit (ICU), and whether introducing clinical practice guidelines (CPG) explicitly stating ICU admission criteria altered this practice. PATIENTS AND METHODS: All consecutive patients with ACS admitted to our medical emergency centre over 3 months before and after CPG implementation were prospectively assessed. The impact of demographic and clinical characteristics (age, gender, cardiovascular risk factors, and clinical parameters upon admission) on ICU hospitalisation of high-risk patients (defined as retrosternal pain of prolonged duration with ECG changes and/or positive troponin blood level) was studied by logistic regression. RESULTS: Before and after CPG implementation, 328 and 364 patients, respectively, were assessed for suspicion of ACS. Before CPG implementation, 36 of the 81 high-risk patients (44.4%) were admitted to ICU. After CPG implementation, 35 of the 90 high-risk patients (38.9%) were admitted to ICU. Male patients were more frequently admitted to ICU before CPG implementation (OR=7.45, 95% CI 2.10-26.44), but not after (OR=0.73, 95% CI 0.20-2.66). Age played a significant role in both periods (OR=1.57, 95% CI 1.24-1.99), both young and advanced ages significantly reducing ICU admission, but to a lesser extent after CPG implementation. CONCLUSION: Prioritisation of access to ICU for high-risk ACS patients was age-dependent, but focused on the cardiovascular risk factor profile. CPG implementation explicitly stating ICU admission criteria decreased discrimination against women, but other factors are likely to play a role in bed allocation.
Resumo:
Dans cette thèse, nous étudions quelques problèmes fondamentaux en mathématiques financières et actuarielles, ainsi que leurs applications. Cette thèse est constituée de trois contributions portant principalement sur la théorie de la mesure de risques, le problème de l’allocation du capital et la théorie des fluctuations. Dans le chapitre 2, nous construisons de nouvelles mesures de risque cohérentes et étudions l’allocation de capital dans le cadre de la théorie des risques collectifs. Pour ce faire, nous introduisons la famille des "mesures de risque entropique cumulatifs" (Cumulative Entropic Risk Measures). Le chapitre 3 étudie le problème du portefeuille optimal pour le Entropic Value at Risk dans le cas où les rendements sont modélisés par un processus de diffusion à sauts (Jump-Diffusion). Dans le chapitre 4, nous généralisons la notion de "statistiques naturelles de risque" (natural risk statistics) au cadre multivarié. Cette extension non-triviale produit des mesures de risque multivariées construites à partir des données financiéres et de données d’assurance. Le chapitre 5 introduit les concepts de "drawdown" et de la "vitesse d’épuisement" (speed of depletion) dans la théorie de la ruine. Nous étudions ces concepts pour des modeles de risque décrits par une famille de processus de Lévy spectrallement négatifs.
Resumo:
Analysis of the equity premium puzzle has focused on private sector capital markets. The object of this paper is to consider the welfare and policy implications of each of the broad classes of explanations of the equity premium puzzle. As would be expected, the greater the deviation from the first-best outcome implied by a given explanation of the equity premium puzzle, the more interventionist are the implied policy conclusions. Nevertheless, even explanations of the equity premium puzzle consistent with a general consumption-based asset pricing model have important welfare and policy implications.
Resumo:
Bármennyire szeretne is egy bank (vállalat, biztosító) csak az üzletre koncentrálni, nem térhet ki a pénzügyi (hitel-, piaci, operációs, egyéb) kockázatok elől, amelyeket mérnie és fedeznie kell. A teljes fedezés vagy nagyon költséges, vagy nem is lehetséges, így a csőd elkerülésre minden gazdálkodó egységnek tartania kell valamennyi kockázatmentes, likvid tőkét. Koherens kockázatmérésre van szükség: az allokált tőkének tükröznie kell a kockázatokat - azonban még akkor is felmerül elosztási probléma, ha jól tudjuk mérni azokat. A diverzifikációs hatásoknak köszönhetően egy portfólió teljes kockázata általában kisebb, mint a portfóliót alkotó alportfóliók kockázatának összege. A koherens tőkeallokáció során azzal a kérdéssel kell foglalkoznunk, hogy mennyi tőkét osszunk az alportfóliókra, vagyis hogyan osszuk el „korrekt” módon a diverzifikáció előnyeit. Így megkapjuk az eszközök kockázathoz való hozzájárulását. A tanulmányban játékelmélet alkalmazásával, összetett opciós példákon keresztül bemutatjuk a kockázatok következetes mérését és felosztását, felhívjuk a figyelmet a következetlenségek veszélyeire, valamint megvizsgáljuk, hogy a gyakorlatban alkalmazott kockázatmérési módszerek [különösen a kockáztatott érték (VaR)] mennyire felelnek meg az elmélet által szabott követelményeknek. ____________________ However much a bank (or company or insurance provider) concentrates only on business, it cannot avoid financial (credit, market, operational or other) risks that need to be measured and covered. Total cover is either very expensive or not even possible, so that every business unit has to hold some risk-free liquid capital to avoid insolvency. What it needs is coherent risk measurement: the capital allocated has to match the risks, but even if the risks are measured well, distribution problems can still arise. Thanks to diversification effects, the total risk of a portfolio is less than the sum of the risks of its sub-portfolios. Coherent capital allocation entails addressing the question of how much capital to divide among the sub-portfolios, or how to distribute ‘correctly’ the advantages of diversification. This yields the contribution of the assets to the risk. The study employs game theory and examples of compound options to demonstrate coherent measurement and distribution of risks. Attention is drawn to the dangers of inconsistencies. The authors examine how far the methods of risk measurement applied in practice (notably VaR—value at risk) meet the requirements set in theory.
Resumo:
In finance risk capital allocation raises important questions both from theoretical and practical points of view. How to share risk of a portfolio among its subportfolios? How to reserve capital in order to hedge existing risk and how to assign this to different business units? We use an axiomatic approach to examine risk capital allocation, that is we call for fundamental properties of the methods. Our starting point is Csóka and Pintér (2011) who show by generalizing Young (1985)'s axiomatization of the Shapley value that the requirements of Core Compatibility, Equal Treatment Property and Strong Monotonicity are irreconcilable given that risk is quantified by a coherent measure of risk. In this paper we look at these requirements using analytic and simulations tools. We examine allocation methods used in practice and also ones which are theoretically interesting. Our main result is that the problem raised by Csóka and Pintér (2011) is indeed relevant in practical applications, that is it is not only a theoretical problem. We also believe that through the characterizations of the examined methods our paper can serve as a useful guide for practitioners.
Resumo:
Mestrado em Economia Monetária e Financeira
Resumo:
In this paper, the placement of sectionalizers, as well as, a cross-connection is optimally determined so that the objective function is minimized. The objective function employed in this paper consists of two main parts, the switch cost and the reliability cost. The switch cost is composed of the cost of sectionalizers and cross-connection and the reliability cost is assumed to be proportional to a reliability index, SAIDI. To optimize the allocation of sectionalizers and cross-connection problem realistically, the cost related to each element is considered as discrete. In consequence of binary variables for the availability of sectionalizers, the problem is extremely discrete. Therefore, the probability of local minimum risk is high and a heuristic-based optimization method is needed. A Discrete Particle Swarm Optimization (DPSO) is employed in this paper to deal with this discrete problem. Finally, a testing distribution system is used to validate the proposed method.