823 resultados para planning and preparation


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The value of driving We as Americans - and especially as Iowans - value the independence of getting around in our own vehicles and staying connected with our families and communities. The majority of older Iowans enjoy a more active, healthy and longer life than previous generations. Freedom of mobility shapes our quality of life. With aging, driving becomes an increasing concern for older Iowans and their families. How we deal with changes in our driving ability and, eventually, choose when and how to retire from driving, will affect our safety and our quality of life.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a review of selected application controls over the Iowa State University of Science and Technology Facilities Planning and Management - Facilities Administrative Management Information System for the period of April 18, 2011 through May 16, 2011

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 4 - Transportation Planning and Traffic Monitoring. Hands on examples of applications of metric measurements in the development of planning reports and traffic data collection are included in this module.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

La planification scanographique (3D) a démontré son utilité pour une reconstruction anatomique plus précise de la hanche (longueur du fémur, centre de rotation, offset, antéversion et rétroversion). Des études ont montré que lors de la planification 2D 50% seulement correspondaient à l'implant définitif du fémur alors que dans une autre étude ce taux s'élevait à 94% pour une planification 3D. Les erreurs étaient liées à l'agrandissement des radiographies. L'erreur sur la taille de la tige est liée à l'estimation inadéquate de la morphologie osseuse ainsi qu'à la densité osseuse. L'erreur de l'antéversion, augmentée par l'inclinaison du bassin, a pu être éliminée par la planification 3D et l'offset restauré dans 98%. Cette étude est basée sur une nouvelle technique de planification scanographique en trois dimensions pour une meilleure précision de la reconstruction de la hanche. Le but de cette étude est de comparer l'anatomie post-opératoire à celle préopératoire en comparant les tailles d'implant prévu lors de la planification 3D à celle réellement utilisée lors de l'opération afin de déterminer l'exactitude de la restauration anatomique avec étude des différents paramètres (centre de rotation, densité osseuse, L'offset fémoral, rotations des implants, longueur du membre) à l'aide du Logiciel HIP-PLAN (Symbios) avec évaluation de la reproductibilité de notre planification 3D dans une série prospective de 50 patients subissant une prothèse totale de hanche non cimentée primaire par voie antérieure. La planification pré-opératoire a été comparée à un CTscan postopératoire par fusion d'images. CONCLUSION ET PRESPECTIVE Les résultats obtenus sont les suivants : La taille de l'implant a été prédit correctement dans 100% des tiges, 94% des cupules et 88% des têtes (longueur). La différence entre le prévu et la longueur de la jambe postopératoire était de 0,3+2,3 mm. Les valeurs de décalage global, antéversion fémorale, inclinaison et antéversion de la cupule étaient 1,4 mm ± 3,1, 0,6 ± 3,3 0 -0,4 0 ± 5 et 6,9 ° ± 11,4, respectivement. Cette planification permet de prévoir la taille de l'implant précis. Position de la tige et de l'inclinaison de la cupule sont exactement reproductible. La planification scanographique préopératoire 3D permet une évaluation précise de l'anatomie individuelle des patients subissant une prothèse totale de hanche. La prédiction de la taille de l'implant est fiable et la précision du positionnement de la tige est excellente. Toutefois, aucun avantage n'est observée en termes d'orientation de la cupule par rapport aux études impliquant une planification 2D ou la navigation. De plus amples recherches comparant les différentes techniques de planification pré-opératoire à la navigation sont nécessaire.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tutkimuksen tarkoituksena on kuvata ja ymmärtää kuinka sisäisiä kehityshankkeita voidaan hallita onnistuneesti kun toimitaan nopeasti muuttuvassa ympäristössä. Tutkimus kuvailee etenkin projekteille tärkeitä menestymistekijöitä, kuten suunnittelu, kontrollointi ja päätöksenteko. Tutkimus selvittää yleisimmät ongelma-alueet case-organisaation sisäisten kehityshankkeiden hallinnassa. Tutkimus on luonteeltaan laadullinen tutkimus, jossa tutkimusmenetelmänä on käytetty tapaustutkimusta. Empiirisessa osassa käsittellään case-organisaation sisäisiä informaatioteknologia-hankkeita (IT) ja uusien konseptien kehityshankkeita (NCD). iSisäisten kehityshankkeiden erilaisuuden ymmärtäminen oli tutkimuksen tärkein tulos. Tutkimuksen empiirinen osio osoitti sen, että epävarmuudella on erittäin suuri vaikutus projektihallintaan sekä projektin kontrollointiin. Case-organisaation IT-projektien onnistuminen riippuu organisaatiomuu-toksen onnistumisesta. Asiakkaisiin ja markkinoihin liittyvät epävarmuudet ovat vaikuttavimmat NCD projektien epävarmuuksista. Näillä epävarmuuk-sil­la on vaikutusta projektihallintaan jonka myötä NCD projektit juuttuvat useim­mi­ten noidankehiin tai ne lopetetaan jo aikaisessa vaiheessa.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Arkitus on kartongin jatkojalostusmuoto, jonka tehokkuus muodostuu monen tekijän vaikutuksesta. Tämän työn tavoitteena oli parantaa arkitustehokkuutta tutkitussa kahden folioleikkurin arkittamossa tuotannonsuunnittelun ja tuotannonohjauksen kehittämisellä. Kartonkitehtaan sisäisessä jalostusketjussa arkitus on viimeinen vaihe, mikä tekee siitä pitkälti riippuvaisen edeltävistä konevaiheista, eli kartonkikoneista ja PE-päällystyskoneista. Pelkkä arkituksen tuotannonsuunnittelun huomiointi ei siis vielä takaa hyvää lopputulosta arkitustehokkuuden kannalta. Folioarkitustoiminta on hyvin asiakassuuntautunutta. Arkkikoot määräytyvät asiakkaiden omien tarpeiden perusteella, jolloin eri arkkikokojen kokonaismäärä kasvaa huomattavan suureksi. Viime vuosien trendinä on ollut tilauseräkokojen pieneneminen. Näiden tekijöiden yhteisvaikutuksena arkituksen tuotantoprosessille on ominaista erilaisten asetusten aiheuttama katkonaisuus. Lisäksi pelkästään yhden millimetrin muutos arkin leveydessä voi usein vaikuttaa arkitustehokkuuteen hyvinkin merkittävästi. Näistä syistä arkituksen tuotannonsuunnittelun apuvälineeksi tarvitaan tarkkuuteen ja joustavuuteen kykenevää tietojärjestelmää. Tehokkaan tuotannonohjauksen tueksi tarvitaan lisäksi erilaisia leikkuri- ja kartonkilaatukohtaisia raportteja. Työn teoriaosassa käsitellään tarkemmin arkitustoiminnan ominaisuuksia ja sen tehokkuuteen vaikuttavia tekijöitä. Lisäksi käsitellään tuotannonsuunnittelun ja tuotannonohjauksen periaatteita ja toimintoja.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In modem hitec industry Advanced Planning and Scheduling (APS) systems provide the basis for e-business solutions towards the suppliers and the customers. One objective of this thesis was to clarify the modem supply chain management with the APS systems and especially concentrate on the area of Collaborative Planning. In order Advanced Planning and Scheduling systems to be complete and usable, user interfaces are needed. Current Visual Basic user interfaces have faced many complaints and arguments from the users as well as from the development team. This thesis is trying to analyze the reasons and causes for the encountered problems and also provide ways to overcome them. The decision has been made to build the new user interfaces to be Web-enabled. Therefore another objective of this thesis was to research and find suitable technologies for building the Web-based user interfaces for Advanced Planning and Scheduling Systems in Nokia Demand/Supply Planning business area. Comparison between the most suitable technologies is made. Usability issues of Web-enabled user interfaces are also covered. The empirical part of the thesis includes design and implementation of a Web-based user interface with the chosen technology for a particular APS module that enables Collaborative Planning with suppliers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Almost thirty years ago, as the social sciences underwent their 'discursive turn', Bernardo Secchi (1984) drew, in what he called the 'urban planning narrative', the attention of planners to the production of myths, turning an activity often seen as primarily technical into one centred around the production of images and ideas. This conception of planning practice gave rise to a powerful current of research in English-speaking countries. Efforts were made to both combine the urban planning narrative with storytelling and to establish storytelling as a prescriptive or descriptive model for planning practice. Thus, just as storytelling is supposed to have led democratic communication off track through a pronounced concern for a good story, storytelling applied to the field of urban production may have led to an increasing preoccupation with staging and showmanship for projects to the detriment of their real inclusion in political debate. It is this possible transformation of the territorial action that will be the focus of the articles collected in this special issue of Articulo - Journal of urban research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tutkielman tavoitteena on selvittää kuinka suunnitella ja hallita tehokasta verkkoviestintää, joka vastaa kohdeyleisön ja palvelun ylläpitäjien kasvaviin vaatimuksiin. Tutkielma on normatiivinen tapaustutkimus, jonka tuloksena syntyy konstruktiivinen askelmalli kokonaisvaltaisen verkkoviestintäprojektin toteuttamiseen. Tutkimus esittää myös teoreettisesti merkittävän näkökulman verkkopalvelujen sisällön hallintaongelmien ratkaisemiseen. Tosielämän verkkoviestintäprojektin toteutusta seurataan TietoEnator Forestissa, jossa tutkielman kirjoittaja työskentelee. Tutkimusmateriaalina käytetään 11 TietoEnator Forestissa toteutettua haastattelua, TietoEnator konsernin dokumentaatiota ja osallistuvaa havainnointia. Haastattelulomake sisältää 13 avointa kysymystä, jotka käsittelevät verkkoviestintästrategian perusasioita. Tunnistetut verkkoviestinnän avainmenestystekijät ovat vahva sisäinen sitoutuminen hajautettuihin ylläpitorooleihin ja perinpohjainen asiakastarpeiden tunnistaminen. Teknisesti on tärkeää, että eritason verkkoympäristöt, Internet, Intranet ja Extranet, hallitaan samoilla sisällönhallinta työkaluilla. Näin pystytään rationalisoimaan ylläpitotoiminnot.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tutkielman tavoitteena on tarkastella uuden yritysidentiteetin suunnittelua ja käyttöönottoa maailmanlaajuisessa palveluyrityksessä. Tutkielma jakaantuu teoreettiseen ja empiiriseen osaan. Teoreettisessa osassa käsitellään yritysidentiteetin käsitettä sekä tarkastellaan uuden yritysidenteetin suunnittelua ja käyttöönottoa. Teoriaa tarkastellaan keskeisten kirjallisten lähteiden perusteella, jotka käsittelevät markkinoinnin johtamista, palveluyritystä, yritysidentiteettiä, imagoa ja brändiä. Empiirinen tarkastelu pohjautuu yritysesimerkkiin. Yritysesimerkkinä on maailmanlaajuinen palveluyritys, ja sen uuden yritysidentiteetin suunnittelu- ja lanseeraustoimenpiteet. Empiirinen aineisto perustuu markkinointipäälliköiden haastatteluihin Australiassa ja Suomessa sekä yrityksen sisäiseen suunnittelu- ja lanseerausmateriaaliin. Tutkielmassa tulee esille yritysidentiteettikäsitteen monimuotoisuus. Yritysidentiteetin rakentaminen lähtee visiosta, missiosta ja yrityksen tavoitteista, jotka pitää olla selkeät ja johdonmukaiset. Yritysidentiteetti käsittää visuaalisen ilmeen lisäksi kaikki ne prosessit, joissa ollaan tekemisissä sidosryhmien kanssa. Yritysidentiteetin rakentaminen ja ylläpitäminen vaatii, että jokainen liiketoimintafunktio ymmärtää yritysidenteetin sisällön ja toimii sen mukaisesti kaikissa tilanteissa. Yrityksen on viestittävä henkilöstölle ja ulkoisille sidosryhmilleen, miksi se on olemassa. Henkilöstön tulee ymmärtää yrityksen tapa toimia, jotta he pystyvät vastaamaan yrityksen asettamiin haasteisiin kohdatessaan asiakkaan. Uuden yritysidentiteetin suunnitteluun on panostettava. Onnistumisen edellytykseksi osoittautui, että suunnitellaan tarkasti toimenpiteet ennen käyttöönottoa, käyttöönoton aikana sekä käyttöönoton jälkeen.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUND: Information about the impact of cancer treatments on patients' quality of life (QoL) is of paramount importance to patients and treating oncologists. Cancer trials that do not specify QoL as an outcome or fail to report collected QoL data, omit crucial information for decision making. To estimate the magnitude of these problems, we investigated how frequently QoL outcomes were specified in protocols of cancer trials and subsequently reported. DESIGN: Retrospective cohort study of RCT protocols approved by six research ethics committees in Switzerland, Germany, and Canada between 2000 and 2003. We compared protocols to corresponding publications, which were identified through literature searches and investigator surveys. RESULTS: Of the 173 cancer trials, 90 (52%) specified QoL outcomes in their protocol, 2 (1%) as primary and 88 (51%) as secondary outcome. Of the 173 trials, 35 (20%) reported QoL outcomes in a corresponding publication (4 modified from the protocol), 18 (10%) were published but failed to report QoL outcomes in the primary or a secondary publication, and 37 (21%) were not published at all. Of the 83 (48%) trials that did not specify QoL outcomes in their protocol, none subsequently reported QoL outcomes. Failure to report pre-specified QoL outcomes was not associated with industry sponsorship (versus non-industry), sample size, and multicentre (versus single centre) status but possibly with trial discontinuation. CONCLUSIONS: About half of cancer trials specified QoL outcomes in their protocols. However, only 20% reported any QoL data in associated publications. Highly relevant information for decision making is often unavailable to patients, oncologists, and health policymakers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The government of Catalonia has developed a planning framework that seeks to establish the provision of cultural facilities throughout the country. The Cultural Facilities Plan of Catalonia (PECCAT) is based on an analysis of historical gaps and establishes a minimum spatial scheme. The plan responds to problems associated with the absence of a former similar instrument, which has led to an inconsistent and inappropriate cultural infrastructure that fails to fulfill its fundamental mission of securing the cultural rights of the population. The paper sets forth the aims of this policy and describes the objectives and basic characteristics of the plan and the expected outcomes. With the plan, the government of Catalonia seeks to rebalance the infrastructure within the territory and to ensure universal access to basic cultural services, while avoiding a logic of standardization and taking local communities into account. With the development of local plans in the municipalities, local governments encourage community participation processes to adapt and decide on priorities for action based on needs assessments and cultural opportunities for local sustainable development. The local plans focus on local cultural strengths, take advantage of opportunities, and aim to realize the cultural dynamics of a place through establishing an infrastructure that can best respond to the needs and cultural demands of the local communities, taking into account economic, social, and environmental sustainability.