960 resultados para cost estimation


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Cost estimating has been acknowledged as a crucial component of construction projects. Depending on available information and project requirements, cost estimates evolve in tandem with project lifecycle stages; conceptualisation, design development, execution and facility management. The premium placed on the accuracy of cost estimates is crucial to producing project tenders and eventually in budget management. Notwithstanding the initial slow pace of its adoption, Building Information Modelling (BIM) has successfully addressed a number of challenges previously characteristic of traditional approaches in the AEC, including poor communication, the prevalence of islands of information and frequent reworks. Therefore, it is conceivable that BIM can be leveraged to address specific shortcomings of cost estimation. The impetus for leveraging BIM models for accurate cost estimation is to align budgeted and actual cost. This paper hypothesises that the accuracy of BIM-based estimation, as more efficient, process-mirrors of traditional cost estimation methods, can be enhanced by simulating traditional cost estimation factors variables. Through literature reviews and preliminary expert interviews, this paper explores the factors that could potentially lead to more accurate cost estimates for construction projects. The findings show numerous factors that affect the cost estimates ranging from project information and its characteristic, project team, clients, contractual matters, and other external influences. This paper will make a particular contribution to the early phase of BIM-based project estimation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The need to account for the effect of design decisions on manufacture and the impact of manufacturing cost on the life cycle cost of any product are well established. In this context, digital design and manufacturing solutions have to be further developed to facilitate and automate the integration of cost as one of the major driver in the product life cycle management. This article is to present an integration methodology for implementing cost estimation capability within a digital manufacturing environment. A digital manufacturing structure of knowledge databases are set out and the ontology of assembly and part costing that is consistent with the structure is provided. Although the methodology is currently used for recurring cost prediction, it can be well applied to other functional developments, such as process planning. A prototype tool is developed to integrate both assembly time cost and parts manufacturing costs within the same digital environment. An industrial example is used to validate this approach.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Bridge construction responds to the need for environmentally friendly design of motorways and facilitates the passage through sensitive natural areas and the bypassing of urban areas. However, according to numerous research studies, bridge construction presents substantial budget overruns. Therefore, it is necessary early in the planning process for the decision makers to have reliable estimates of the final cost based on previously constructed projects. At the same time, the current European financial crisis reduces the available capital for investments and financial institutions are even less willing to finance transportation infrastructure. Consequently, it is even more necessary today to estimate the budget of high-cost construction projects -such as road bridges- with reasonable accuracy, in order for the state funds to be invested with lower risk and the projects to be designed with the highest possible efficiency. In this paper, a Bill-of-Quantities (BoQ) estimation tool for road bridges is developed in order to support the decisions made at the preliminary planning and design stages of highways. Specifically, a Feed-Forward Artificial Neural Network (ANN) with a hidden layer of 10 neurons is trained to predict the superstructure material quantities (concrete, pre-stressed steel and reinforcing steel) using the width of the deck, the adjusted length of span or cantilever and the type of the bridge as input variables. The training dataset includes actual data from 68 recently constructed concrete motorway bridges in Greece. According to the relevant metrics, the developed model captures very well the complex interrelations in the dataset and demonstrates strong generalisation capability. Furthermore, it outperforms the linear regression models developed for the same dataset. Therefore, the proposed cost estimation model stands as a useful and reliable tool for the construction industry as it enables planners to reach informed decisions for technical and economic planning of concrete bridge projects from their early implementation stages.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The paper presents the techno-economic modelling of CO2 capture process in coal-fired power plants. An overall model is being developed to compare carbon capture and sequestration options at locations within the UK, and for studies of the sensitivity of the cost of disposal to changes in the major parameters of the most promising solutions identified. Technological options of CO2 capture have been studied and cost estimation relationships (CERs) for the chosen options calculated. Created models are related to the capital, operation and maintenance cost. A total annualised cost of plant electricity output and amount of CO2 avoided have been developed. The influence of interest rates and plant life has been analysed as well. The CERs are included as an integral part of the overall model.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Abstract machines provide a certain separation between platformdependent and platform-independent concerns in compilation. Many of the differences between architectures are encapsulated in the speciflc abstract machine implementation and the bytecode is left largely architecture independent. Taking advantage of this fact, we present a framework for estimating upper and lower bounds on the execution times of logic programs running on a bytecode-based abstract machine. Our approach includes a one-time, programindependent proflling stage which calculates constants or functions bounding the execution time of each abstract machine instruction. Then, a compile-time cost estimation phase, using the instruction timing information, infers expressions giving platform-dependent upper and lower bounds on actual execution time as functions of input data sizes for each program. Working at the abstract machine level makes it possible to take into account low-level issues in new architectures and platforms by just reexecuting the calibration stage instead of having to tailor the analysis for each architecture and platform. Applications of such predicted execution times include debugging/veriflcation of time properties, certiflcation of time properties in mobile code, granularity control in parallel/distributed computing, and resource-oriented specialization.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The construction cost estimation systems in Spain are undeveloped and, hence, infrequently used by technicians and professionals in the building sector. However, estimation of an approximate real cost prior to the execution of the work is compulsory under current legal regulations (Technical Building Code). Therefore, the development of research projects on construction cost estimation models such as the one described and demonstrated in this talk is extremely interesting.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Most parametric software cost estimation models used today evolved in the late 70's and early 80's. At that time, the dominant software development techniques being used were the early 'structured methods'. Since then, several new systems development paradigms and methods have emerged, one being Jackson Systems Development (JSD). As current cost estimating methods do not take account of these developments, their non-universality means they cannot provide adequate estimates of effort and hence cost. In order to address these shortcomings two new estimation methods have been developed for JSD projects. One of these methods JSD-FPA, is a top-down estimating method, based on the existing MKII function point method. The other method, JSD-COCOMO, is a sizing technique which sizes a project, in terms of lines of code, from the process structure diagrams and thus provides an input to the traditional COCOMO method.The JSD-FPA method allows JSD projects in both the real-time and scientific application areas to be costed, as well as the commercial information systems applications to which FPA is usually applied. The method is based upon a three-dimensional view of a system specification as opposed to the largely data-oriented view traditionally used by FPA. The method uses counts of various attributes of a JSD specification to develop a metric which provides an indication of the size of the system to be developed. This size metric is then transformed into an estimate of effort by calculating past project productivity and utilising this figure to predict the effort and hence cost of a future project. The effort estimates produced were validated by comparing them against the effort figures for six actual projects.The JSD-COCOMO method uses counts of the levels in a process structure chart as the input to an empirically derived model which transforms them into an estimate of delivered source code instructions.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Choosing between Light Rail Transit (LRT) and Bus Rapid Transit (BRT) systems is often controversial and not an easy task for transportation planners who are contemplating the upgrade of their public transportation services. These two transit systems provide comparable services for medium-sized cities from the suburban neighborhood to the Central Business District (CBD) and utilize similar right-of-way (ROW) categories. The research is aimed at developing a method to assist transportation planners and decision makers in determining the most feasible system between LRT and BRT. ^ Cost estimation is a major factor when evaluating a transit system. Typically, LRT is more expensive to build and implement than BRT, but has significantly lower Operating and Maintenance (OM) costs than BRT. This dissertation examines the factors impacting capacity and costs, and develops cost models, which are a capacity-based cost estimate for the LRT and BRT systems. Various ROW categories and alignment configurations of the systems are also considered in the developed cost models. Kikuchi's fleet size model (1985) and cost allocation method are used to develop the cost models to estimate the capacity and costs. ^ The comparison between LRT and BRT are complicated due to many possible transportation planning and operation scenarios. In the end, a user-friendly computer interface integrated with the established capacity-based cost models, the LRT and BRT Cost Estimator (LBCostor), was developed by using Microsoft Visual Basic language to facilitate the process and will guide the users throughout the comparison operations. The cost models and the LBCostor can be used to analyze transit volumes, alignments, ROW configurations, number of stops and stations, headway, size of vehicle, and traffic signal timing at the intersections. The planners can make the necessary changes and adjustments depending on their operating practices. ^

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Current technology permits connecting local networks via high-bandwidth telephone lines. Central coordinator nodes may use Intelligent Networks to manage data flow over dialed data lines, e.g. ISDN, and to establish connections between LANs. This dissertation focuses on cost minimization and on establishing operational policies for query distribution over heterogeneous, geographically distributed databases. Based on our study of query distribution strategies, public network tariff policies, and database interface standards we propose methods for communication cost estimation, strategies for the reduction of bandwidth allocation, and guidelines for central to node communication protocols. Our conclusion is that dialed data lines offer a cost effective alternative for the implementation of distributed database query systems, and that existing commercial software may be adapted to support query processing in heterogeneous distributed database systems. ^

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Variations are inherent in all manufacturing processes and can significantly affect the quality of a final assembly, particularly in multistage assembly systems. Existing research in variation management has primarily focused on incorporating GD&T factors into variation propagation models in order to predict product quality and allocate tolerances. However, process induced variation, which has a key influence on process planning, has not been fully studied. Furthermore, the link between variation and cost has not been well established, in particular the effect that assembly process selection has on the final quality and cost of a product. To overcome these barriers, this paper proposes a novel method utilizing process capabilities to establish the relationship between variation and cost. The methodology is discussed using a real industrial case study. The benefits include determining the optimum configuration of an assembly system and facilitating rapid introduction of novel assembly techniques to achieve a competitive edge.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Designing and estimating civil concrete structures is a complex process which to many practitioners is tied to manual or semi-manual processes of 2D design and cannot be further improved by automated, interacting design-estimating processes. This paper presents a feasibility study for the development an automated estimator for concrete bridge design. The study offers a value proposition: an efficient automated model-based estimator can add value to the whole bridge design-estimating process, i.e., reducing estimation errors, shortening the duration of success estimates, and increasing the benefit of doing cost estimation when compared with the current practice. This is then followed by a description of what is in an efficient automated model-based estimator and how it should be used. Finally the process of model-based estimating is compared with the current practice to highlight the values embedded in the automated processes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Tämän pro gradu -tutkielman tarkoituksena on määrittää jätteenkeräyksen ja -siirron yhteiskunnalliset kustannukset valitulla tutkimusalueella Helsingin Punavuoressa. Jätteenkeräyksen ja -siirron kustannukset vastaavat suuruudeltaan merkittävää osaa jätehuollon kokonaiskustannuksista, minkä vuoksi kustannusten tutkimiselle ja tarkastelulle löytyy kysyntää. Lisäksi keräyksen ja siirron kustannukset saattavat vaihdella suuresti johtuen erilaisista kaupunkirakenteista,keräysmenetelmistä ja teknologioista, joten tapaustarkastelun avulla pystytään selvittämään yksityiskohtaisesti alueen jätteenkeräyksen ja -siirron kustannukset. Tutkimusalue Helsingin Punavuoressa on yksi Suomen tiheimmin asutuista alueista, missä jätteidenkeräystä hankaloittaa kapeat kadut, useat sisäpihoille sijoitetut jätehuoneet ja vilkas liikenne. Erityispiirteidensä vuoksi jätteenkeräys- ja siirto aiheuttaa tutkimusalueella yksityisten kustannusten lisäksi myös useita ulkoisvaikutuksia muun muassa ilmansaasteiden ja viihtyvyyshaittojen muodossa. Tässä työssä lasketaan jätteenkeräyksen ja -siirron yhteiskunnalliset kustannukset neljän eri jätelajin osalta huomioimalla sekä yksityiset kustannustekijät että ulkoiskustannuksina syntyvien päästöjen kustannukset. Työn aineistona on käytetty erilaisia kustannuslaskelmien kirjallisuuslähteitä, asiantuntija-arvioita ja tutkimusalueella tehtyjä kellotusmittauksia. Alueen kellotusmittauksiin perustuvalla aikaperusteisella laskentatavalla jätteenkeräyksen ja -siirron jätetonnikohtaisiksi keskimääräisiksi kustannuksiksi saatiin 73 €/t. Kustannuksissa havaittiin kuitenkin suuria jätelajikohtaisia eroja, jolloin keräyksen ja siirron kustannukset heittelivät 49–125 €/t välillä. Suuret jätelajikohtaiset kustannuserot ovat selitettävissä pitkälti jätteiden koostumuksella, koska kevyiden ja paljon tilaa vievien jätelajien jätetonnikohtaiset kustannukset olivat suurimpia. Teoriataustan ja lähdeaineiston perusteella saadut tulokset myös osoittavat, että jätteenkeräyksen ja siirron kustannuksista huomioitujen ulkoiskustannusten osuus on häviävän pieni verrattuna yksityisten kustannusten tasoon.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

软件成本估算从20世纪60年代发展至今,在软件开发过程中一直扮演着重要角色.按照基于算法模型的方法、非基于算法模型的方法以及组合方法的分类方式,全面回顾、分析了软件成本估算的各种代表性方法,也归纳讨论了与成本估算强相关的软件规模度量问题.在此基础上,进一步研究了软件成本估算方法的评价标准,并给出了一个应用实例及其分析.最后,从估算模型、估算演进、估算应用、估算内容、工具支持和人为因素6个方面,指出了软件成本估算方法下一步的主要发展趋势.