961 resultados para complexity management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many of the most common human functions such as temporal and non-monotonic reasoning have not yet been fully mapped in developed systems, even though some theoretical breakthroughs have already been accomplished. This is mainly due to the inherent computational complexity of the theoretical approaches. In the particular area of fault diagnosis in power systems however, some systems which tried to solve the problem, have been deployed using methodologies such as production rule based expert systems, neural networks, recognition of chronicles, fuzzy expert systems, etc. SPARSE (from the Portuguese acronym, which means expert system for incident analysis and restoration support) was one of the developed systems and, in the sequence of its development, came the need to cope with incomplete and/or incorrect information as well as the traditional problems for power systems fault diagnosis based on SCADA (supervisory control and data acquisition) information retrieval, namely real-time operation, huge amounts of information, etc. This paper presents an architecture for a decision support system, which can solve the presented problems, using a symbiosis of the event calculus and the default reasoning rule based system paradigms, insuring soft real-time operation with incomplete, incorrect or domain incoherent information handling ability. A prototype implementation of this system is already at work in the control centre of the Portuguese Transmission Network.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Short-term risk management is highly dependent on long-term contractual decisions previously established; risk aversion factor of the agent and short-term price forecast accuracy. Trying to give answers to that problem, this paper provides a different approach for short-term risk management on electricity markets. Based on long-term contractual decisions and making use of a price range forecast method developed by the authors, the short-term risk management tool presented here has as main concern to find the optimal spot market strategies that a producer should have for a specific day in function of his risk aversion factor, with the objective to maximize the profits and simultaneously to practice the hedge against price market volatility. Due to the complexity of the optimization problem, the authors make use of Particle Swarm Optimization (PSO) to find the optimal solution. Results from realistic data, namely from OMEL electricity market, are presented and discussed in detail.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: The aim of this paper is to highlight the importance of qualitative research within the scope of management scientific studies, referring to its philosophy, nature and instruments. It also confronts it with quantitative methodology, approaching its differences as well as its complementariness and synergies, with the purpose of explaining, from a more analytic point of view, the relevance of qualitative methodology in the course of an authentic and real research despite its complexity. Design/methodology/approach: Regardless of its broad application, one may attest the scarcity literature that focuses on qualitative research applied to the management scientific area, as opposed to the large amount that refers to quantitative research. Findings: The paper shows the influence that qualitative research has on management scientific research. Originality/value:. Qualitative research assumes an important role within qualitative research by allowing for the study and analysis of certain types of phenomena that occur inside organisations, and in respect of which quantitative studies cannot provide an answer.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The introduction of electricity markets and integration of Distributed Generation (DG) have been influencing the power system’s structure change. Recently, the smart grid concept has been introduced, to guarantee a more efficient operation of the power system using the advantages of this new paradigm. Basically, a smart grid is a structure that integrates different players, considering constant communication between them to improve power system operation and management. One of the players revealing a big importance in this context is the Virtual Power Player (VPP). In the transportation sector the Electric Vehicle (EV) is arising as an alternative to conventional vehicles propel by fossil fuels. The power system can benefit from this massive introduction of EVs, taking advantage on EVs’ ability to connect to the electric network to charge, and on the future expectation of EVs ability to discharge to the network using the Vehicle-to-Grid (V2G) capacity. This thesis proposes alternative strategies to control these two EV modes with the objective of enhancing the management of the power system. Moreover, power system must ensure the trips of EVs that will be connected to the electric network. The EV user specifies a certain amount of energy that will be necessary to charge, in order to ensure the distance to travel. The introduction of EVs in the power system turns the Energy Resource Management (ERM) under a smart grid environment, into a complex problem that can take several minutes or hours to reach the optimal solution. Adequate optimization techniques are required to accommodate this kind of complexity while solving the ERM problem in a reasonable execution time. This thesis presents a tool that solves the ERM considering the intensive use of EVs in the smart grid context. The objective is to obtain the minimum cost of ERM considering: the operation cost of DG, the cost of the energy acquired to external suppliers, the EV users payments and remuneration and penalty costs. This tool is directed to VPPs that manage specific network areas, where a high penetration level of EVs is expected to be connected in these areas. The ERM is solved using two methodologies: the adaptation of a deterministic technique proposed in a previous work, and the adaptation of the Simulated Annealing (SA) technique. With the purpose of improving the SA performance for this case, three heuristics are additionally proposed, taking advantage on the particularities and specificities of an ERM with these characteristics. A set of case studies are presented in this thesis, considering a 32 bus distribution network and up to 3000 EVs. The first case study solves the scheduling without considering EVs, to be used as a reference case for comparisons with the proposed approaches. The second case study evaluates the complexity of the ERM with the integration of EVs. The third case study evaluates the performance of scheduling with different control modes for EVs. These control modes, combined with the proposed SA approach and with the developed heuristics, aim at improving the quality of the ERM, while reducing drastically its execution time. The proposed control modes are: uncoordinated charging, smart charging and V2G capability. The fourth and final case study presents the ERM approach applied to consecutive days.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building reliable real-time applications on top of commercial off-the-shelf (COTS) components is not a straightforward task. Thus, it is essential to provide a simple and transparent programming model, in order to abstract programmers from the low-level implementation details of distribution and replication. However, the recent trend for incorporating pre-emptive multitasking applications in reliable real-time systems inherently increases its complexity. It is therefore important to provide a transparent programming model, enabling pre-emptive multitasking applications to be implemented without resorting to simultaneously dealing with both system requirements and distribution and replication issues. The distributed embedded architecture using COTS components (DEAR-COTS) architecture has been previously proposed as an architecture to support real-time and reliable distributed computer-controlled systems (DCCS) using COTS components. Within the DEAR-COTS architecture, the hard real-time subsystem provides a framework for the development of reliable real-time applications, which are the core of DCCS applications. This paper presents the proposed framework, and demonstrates how it can be used to support the transparent replication of software components.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper addresses a gap in the literature concerning the management of Intellectual Capital (IC) in a port, which is a network of independent organizations that act together in the provision of a set of services. As far as the authors are aware, this type of empirical context has been unexplored when regarding knowledge management or IC creation/destruction. Indeed, most research in IC still focus on individual firms, despite the more recent interest placed on the analysis of macro-level units such as regions or nations. In this study, we conceptualise the port as meta-organisation, which has the generic goal of economic development, both for itself and for the region where it is located. It provides us with a unique environment due to its complexity as an “organisation” composed by several organisations, connected by interdependency relationships and, typically, with no formal hierarchy. Accordingly, actors’ interests are not always aligned and in some situations their individual interests can be misaligned with the collective goals of the port. Moreover, besides having their own interests, port actors also have different sources of influence and different levels of power, which can impact on the port’s Collective Intellectual Capital (CIC). Consequently, the management of the port’s CIC can be crucial in order for its goals to be met. With this paper we intend to discuss how the network coordinator (the port authority) manages those complex relations of interest and power in order to develop collaboration and mitigate conflict, thus creating collective intellectual assets or avoiding intellectual liabilities that may emerge for the whole port. The fact that we are studying complex and dynamic processes, about which there is a lack of understanding, in a complex and atypical organisation, leads us to consider the case study as an appropriate method of research. Evidence presented in this study results from preliminary interviews and also from document analysis. Findings suggest that alignment of interests and actions, at both dyadic and networking levels, is critical to develop a context of collaboration/cooperation within the port community and, accordingly, the port coordinator should make use of different types of power in order to ensure that port’s goals are achieved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The massification of electric vehicles (EVs) can have a significant impact on the power system, requiring a new approach for the energy resource management. The energy resource management has the objective to obtain the optimal scheduling of the available resources considering distributed generators, storage units, demand response and EVs. The large number of resources causes more complexity in the energy resource management, taking several hours to reach the optimal solution which requires a quick solution for the next day. Therefore, it is necessary to use adequate optimization techniques to determine the best solution in a reasonable amount of time. This paper presents a hybrid artificial intelligence technique to solve a complex energy resource management problem with a large number of resources, including EVs, connected to the electric network. The hybrid approach combines simulated annealing (SA) and ant colony optimization (ACO) techniques. The case study concerns different EVs penetration levels. Comparisons with a previous SA approach and a deterministic technique are also presented. For 2000 EVs scenario, the proposed hybrid approach found a solution better than the previous SA version, resulting in a cost reduction of 1.94%. For this scenario, the proposed approach is approximately 94 times faster than the deterministic approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil Especialização em Edificações

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The complexity associated with fast growing of B2B and the lack of a (complete) suite of open standards makes difficulty to maintain the underlying collaborative processes. Aligned to this challenge, this paper aims to be a contribution to an open architecture of logistics and transport processes management system. A model of an open integrated system is being defined as an open computational responsibility from the embedded systems (on-board) as well as a reference implementation (prototype) of a host system to validate the proposed open interfaces. Embedded subsystem can, natively, be prepared to cooperate with other on-board units and with IT-systems in an infrastructure commonly referred to as a center information system or back-office. In interaction with a central system the proposal is to adopt an open framework for cooperation where the embedded unit or the unit placed somewhere (land/sea) interacts in response to a set of implemented capabilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The intensive use of distributed generation based on renewable resources increases the complexity of power systems management, particularly the short-term scheduling. Demand response, storage units and electric and plug-in hybrid vehicles also pose new challenges to the short-term scheduling. However, these distributed energy resources can contribute significantly to turn the shortterm scheduling more efficient and effective improving the power system reliability. This paper proposes a short-term scheduling methodology based on two distinct time horizons: hour-ahead scheduling, and real-time scheduling considering the point of view of one aggregator agent. In each scheduling process, it is necessary to update the generation and consumption operation, and the storage and electric vehicles status. Besides the new operation condition, more accurate forecast values of wind generation and consumption are available, for the resulting of short-term and very short-term methods. In this paper, the aggregator has the main goal of maximizing his profits while, fulfilling the established contracts with the aggregated and external players.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent changes in electricity markets (EMs) have been potentiating the globalization of distributed generation. With distributed generation the number of players acting in the EMs and connected to the main grid has grown, increasing the market complexity. Multi-agent simulation arises as an interesting way of analysing players’ behaviour and interactions, namely coalitions of players, as well as their effects on the market. MASCEM was developed to allow studying the market operation of several different players and MASGriP is being developed to allow the simulation of the micro and smart grid concepts in very different scenarios This paper presents a methodology based on artificial intelligence techniques (AI) for the management of a micro grid. The use of fuzzy logic is proposed for the analysis of the agent consumption elasticity, while a case based reasoning, used to predict agents’ reaction to price changes, is an interesting tool for the micro grid operator.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent and future changes in power systems, mainly in the smart grid operation context, are related to a high complexity of power networks operation. This leads to more complex communications and to higher network elements monitoring and control levels, both from network’s and consumers’ standpoint. The present work focuses on a real scenario of the LASIE laboratory, located at the Polytechnic of Porto. Laboratory systems are managed by the SCADA House Intelligent Management (SHIM), already developed by the authors based on a SCADA system. The SHIM capacities have been recently improved by including real-time simulation from Opal RT. This makes possible the integration of Matlab®/Simulink® real-time simulation models. The main goal of the present paper is to compare the advantages of the resulting improved system, while managing the energy consumption of a domestic consumer.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is imperative to accept that failures can and will occur, even in meticulously designed distributed systems, and design proper measures to counter those failures. Passive replication minimises resource consumption by only activating redundant replicas in case of failures, as typically providing and applying state updates is less resource demanding than requesting execution. However, most existing solutions for passive fault tolerance are usually designed and configured at design time, explicitly and statically identifying the most critical components and their number of replicas, lacking the needed flexibility to handle the runtime dynamics of distributed component-based embedded systems. This paper proposes a cost-effective adaptive fault tolerance solution with a significant lower overhead compared to a strict active redundancy-based approach, achieving a high error coverage with the minimum amount of redundancy. The activation of passive replicas is coordinated through a feedback-based coordination model that reduces the complexity of the needed interactions among components until a new collective global service solution is determined, improving the overall maintainability and robustness of the system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação para obtenção de grau de Mestre em Engenharia e Gestão Industrial (MEGI)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims at building a theoretical framework to examine the impact of development pressure on private owner’s forest management practices, namely, on regeneration and conversion cut dates. As the rent for developed land is rising over time, our model creates the possibility of switching from forestry to residential use at some point in the future, thus departing from the Faustmann’s traditional setup. Comparative statics results with respect to stumpage prices, regeneration costs and urban growth parameters are provided. The results obtained depend on the impact on the opportunity cost of holding the stand and the impact on the opportunity cost of holding the land, generalizing Faustmann’s unambiguous results.