438 resultados para betting shops


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aims: We evaluated solvents and total particulates exposures in auto body repair shops together with a search of painter's related complaints. Methods: 26 painters exposures were evaluated by pumped personal sampling; solvents were retained in charcoal sorbent tubes and the particulates in PVC filters. Painter's personal habits and their work characteristics were obtained through a questionnaire, applied in a private interview. For the symptoms the Q16 questionnaire was used, added of questions about complaints during the painting. Results: High exposures were detected during spray painting. For solvents, the TLV-STEL adjusted for the mixtures was surpassed in six evaluations. However, as repaint is a short-term operation, it makes the average concentrations weighed for the work shift lower than the TLV-TWA adjusted for the mixtures. Total particulate concentrations had surpassed the TLV-TWA in four of the evaluations. Symptoms frequency in the Q16 questionnaire was higher for painters than for the controls (Mann-Whitney test U=193; p=0.008), and they showed positive correlations with the age (Spearman r=0.354, t=1.85, p=0.076), the number of years in the profession (Spearman r=0.433, t=2.35, p=0.027) and the alcoholic beverage consumption (Spearman r=0.457, t=2.516, p=0.019). Conclusions: The painting work done at car repair shops can result in high solvent and particulate exposures, although they are short-term operations. Their acute and chronic effects for the painters do not have been clearly evidenced in the present study, continuing deserving multidisciplinary attention.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The integrated production scheduling and lot-sizing problem in a flow shop environment consists of establishing production lot sizes and allocating machines to process them within a planning horizon in a production line with machines arranged in series. The problem considers that demands must be met without backlogging, the capacity of the machines must be respected, and machine setups are sequence-dependent and preserved between periods of the planning horizon. The objective is to determine a production schedule to minimise the setup, production and inventory costs. A mathematical model from the literature is presented, as well as procedures for obtaining feasible solutions. However, some of the procedures have difficulty in obtaining feasible solutions for large-sized problem instances. In addition, we address the problem using different versions of the Asynchronous Team (A-Team) approach. The procedures were compared with literature heuristics based on Mixed Integer Programming. The proposed A-Team procedures outperformed the literature heuristics, especially for large instances. The developed methodologies and the results obtained are presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do grau de Mestre no Instituto Superior de Ciências da Saúde Egas Moniz

Relevância:

20.00% 20.00%

Publicador:

Resumo:

At head of title: U.S. Dept. of Commerce. Jesse H. Jones, Secretary. Bureau of the Census. J.C. Capt, Director ..

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Description based on: 1979.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

"Printed February 1989."

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Provides a general understanding of the statutory and regulatory requirements governing automotive repair and autobody shops.