996 resultados para Neutrinos Supernova Antarktis Eis Photonpropagation AMANDA Neutrinoteleskop Echtzeit
Resumo:
Relatório de estágio de mestrado em Educação Pré-Escolar e Ensino do 1.º Ciclo do Ensino Básico
Resumo:
A search for heavy Majorana neutrinos in events containing a pair of high-pT leptons of the same charge and high-pT jets is presented. The search uses 20.3fb−1 of pp collision data collected with the ATLAS detector at the CERN Large Hadron Collider with a centre-of-mass energy of s√=8 TeV. The data are found to be consistent with the background-only hypothesis based on the Standard Model expectation. In the context of a Type-I seesaw mechanism, limits are set on the production cross-section times branching ratio for production of heavy Majorana neutrinos in the mass range between 100 and 500 GeV. The limits are subsequently interpreted as limits on the mixing between the heavy Majorana neutrinos and the Standard Model neutrinos. In the context of a left-right symmetric model, limits on the production cross-section times branching ratio are set with respect to the masses of heavy Majorana neutrinos and heavy gauge bosons WR and Z′.
Resumo:
Roboter, direkte Kinematik, inverse Kinematik, Trajektoriengenerierung, optische Sensoren, Kameramodell, Objektverfolgung
Resumo:
Magdeburg, Univ., Fak. für Elektrotechnik und Informationstechnik, Diss., 2009
Resumo:
Magdeburg, Univ., Fak. für Informatik, Diss., 2009
Resumo:
Es comença parlant dels sistemes d'informació per a anar a parar al món dels ERP i, especialment, a un dels més importants a escala mundial, el SAP R/3. Després s'explica què són els DataWarehouses o magatzems de dades, com es creen i quines aplicacions tenen. Finalment, s'analitza i es planifica un cas pràctic: una empresa canvia d'ERP corporatiu per passar a SAP R/3 i, per tant, ha de canviar i adaptar el seu sistema EIS.
Resumo:
Descriptors based on Molecular Interaction Fields (MIF) are highly suitable for drug discovery, but their size (thousands of variables) often limits their application in practice. Here we describe a simple and fast computational method that extracts from a MIF a handful of highly informative points (hot spots) which summarize the most relevant information. The method was specifically developed for drug discovery, is fast, and does not require human supervision, being suitable for its application on very large series of compounds. The quality of the results has been tested by running the method on the ligand structure of a large number of ligand-receptor complexes and then comparing the position of the selected hot spots with actual atoms of the receptor. As an additional test, the hot spots obtained with the novel method were used to obtain GRIND-like molecular descriptors which were compared with the original GRIND. In both cases the results show that the novel method is highly suitable for describing ligand-receptor interactions and compares favorably with other state-of-the-art methods.
Resumo:
This brochure includes colorful pictures of fall colors in Iowa. Also has information on why trees change colors and how to identify the species of tree through its leaves. Informs you on where and when to find the best viewing sites of fall foliage in Iowa.
Resumo:
The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.
Resumo:
The Federal Highway Administration (FHWA) and the Iowa and Illinois Departments of Transportation (Iowa DOT and IDOT) have identified the Selected Alternative for improving Interstate 74 (I-74) from its southern terminus at Avenue of the Cities (23rd Avenue) in Moline, Illinois to its northern terminus one mile north of the I-74 interchange with 53rd Street in Davenport, Iowa. The Selected Alternative identified and discussed in this Record of Decision is the preferred alternative identified in the Final Environmental Impact Statement (FEIS). The purpose of the proposed improvements is to improve capacity, travel reliability, and safety along I-74 between its termini, and provide consistency with local land use planning goals. The need for the proposed improvements to the I-74 corridor is based on a combination of factors related to providing better transportation service and sustaining economic development.