980 resultados para Maintenance strategies


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Distraction in the workplace is increasingly more common in the information age. Several tasks and sources of information compete for a worker's limited cognitive capacities in human-computer interaction (HCI). In some situations even very brief interruptions can have detrimental effects on memory. Nevertheless, in other situations where persons are continuously interrupted, virtually no interruption costs emerge. This dissertation attempts to reveal the mental conditions and causalities differentiating the two outcomes. The explanation, building on the theory of long-term working memory (LTWM; Ericsson and Kintsch, 1995), focuses on the active, skillful aspects of human cognition that enable the storage of task information beyond the temporary and unstable storage provided by short-term working memory (STWM). Its key postulate is called a retrieval structure an abstract, hierarchical knowledge representation built into long-term memory that can be utilized to encode, update, and retrieve products of cognitive processes carried out during skilled task performance. If certain criteria of practice and task processing are met, LTWM allows for the storage of large representations for long time periods, yet these representations can be accessed with the accuracy, reliability, and speed typical of STWM. The main thesis of the dissertation is that the ability to endure interruptions depends on the efficiency in which LTWM can be recruited for maintaing information. An observational study and a field experiment provide ecological evidence for this thesis. Mobile users were found to be able to carry out heavy interleaving and sequencing of tasks while interacting, and they exhibited several intricate time-sharing strategies to orchestrate interruptions in a way sensitive to both external and internal demands. Interruptions are inevitable, because they arise as natural consequences of the top-down and bottom-up control of multitasking. In this process the function of LTWM is to keep some representations ready for reactivation and others in a more passive state to prevent interference. The psychological reality of the main thesis received confirmatory evidence in a series of laboratory experiments. They indicate that after encoding into LTWM, task representations are safeguarded from interruptions, regardless of their intensity, complexity, or pacing. However, when LTWM cannot be deployed, the problems posed by interference in long-term memory and the limited capacity of the STWM surface. A major contribution of the dissertation is the analysis of when users must resort to poorer maintenance strategies, like temporal cues and STWM-based rehearsal. First, one experiment showed that task orientations can be associated with radically different patterns of retrieval cue encodings. Thus the nature of the processing of the interface determines which features will be available as retrieval cues and which must be maintained by other means. In another study it was demonstrated that if the speed of encoding into LTWM, a skill-dependent parameter, is slower than the processing speed allowed for by the task, interruption costs emerge. Contrary to the predictions of competing theories, these costs turned out to involve intrusions in addition to omissions. Finally, it was learned that in rapid visually oriented interaction, perceptual-procedural expectations guide task resumption, and neither STWM nor LTWM are utilized due to the fact that access is too slow. These findings imply a change in thinking about the design of interfaces. Several novel principles of design are presented, basing on the idea of supporting the deployment of LTWM in the main task.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This study assessed the sustained effect of a physical activity (PA) counseling intervention on PA one year after intervention, predictors of sustained PA participation, and three classes of post-intervention PA trajectories (improvers, maintainers, and decliners) in 238 older Veterans. Declines in minutes of PA from 12 to 24 months were observed for both the treatment and control arms of the study. PA at 12 months was the strongest predictor of post-intervention changes in PA. To our surprise, those who took up the intervention and increased PA levels the most, had significant declines in post-intervention PA. Analysis of the three post-intervention PA trajectories demonstrated that the maintenance group actually reflected a group of nonresponders to the intervention who had more comorbidities, lower self-efficacy, and worse physical function than the improvers or decliners. Results suggest that behavioral counseling/support must be ongoing to promote maintenance. Strategies to promote PA appropriately to subgroups of individuals are needed.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Many parts of the UK’s rail network were constructed in the mid-19th century long before the advent of modern construction standards. Historic levels of low investment, poor maintenance strategies and the deleterious effects of climate change have resulted in critical elements of the rail network being at significant risk of failure. The majority of failures which have occurred over recent years have been triggered by extreme weather events. Advance assessment and remediation of earthworks is, however, significantly less costly than dealing with failures reactively. It is therefore crucial that appropriate approaches for assessment of the stability of earthworks are developed, so that repair work can be better targeted and failures avoided wherever possible. This extended abstract briefly discusses some preliminary results from an ongoing geophysical research project being carried out in order to study the impact of climate or seasonal weather variations on the stability of a century old railway embankment on the Gloucestershire Warwickshire steam railway line in Southern England.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Electric vehicles (EVs) and hybrid electric vehicles (HEVs) are rapidly gaining popularity as a means of de-carbonization in the transport sector in tackling sustainable energy supply and environment pollution problems. To build a proper battery model is essential in predicting battery behaviour under various operating conditions for avoiding unsafe battery operations and developing proper controlling algorithms and maintenance strategies. This paper presents a comprehensive review of battery modelling methods. In particular, the mechanism and characteristics of Li-ion batteries are presented, and different modelling methods are discussed. Considering that equivalent electric circuit models (EECMs) are the most widely used, a detailed analysis of the modelling procedure is presented.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O atual ambiente competitivo, onde baixo custo, alta qualidade e um grau crescente de customização são exigências para a sobrevivência das empresas, tem influenciado as ações dos profissionais de manutenção com vistas ao aprimoramento das políticas de manutenção. Como resultado, tem-se na área de manutenção industrial, uma grande quantidade de métodos, software, modelos e ferramentas de gestão disponíveis. Dentre eles, dois métodos se destacam: o RCM (Reliability Centered Maintenance ou Manutenção Centrada em Confiabilidade), de origem norte-americana, e a TPM (Total Productive Maintenance ou Manutenção Produtiva Total), de origem japonesa. A TPM promove a integração total entre homem, máquina e empresa, onde a manutenção dos meios de produção passa a constituir uma responsabilidade de todos. A utilização da TPM contempla a implementação de pilares de sustentação, sendo um deles, a manutenção planejada. Entretanto, a TPM não especifica a estratégia a ser adotada pela manutenção planejada. O RCM é uma metodologia lógica de procedimentos que objetiva estabelecer uma manutenção preditiva e preventiva para alcançar, de maneira efetiva e eficiente, os níveis de segurança e confiabilidade requeridas para cada equipamento. Considerando um ambiente com a TPM já implementada, o objetivo deste trabalho é a melhoria do pilar Manutenção Planejada da TPM através da utilização do RCM para nortear as estratégias de manutenção em empresas industriais. A sistemática proposta é ilustrada através de um estudo de caso na indústria de conformação de metais.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Some Arachis species are widely used as commercial plants, e.g. the groundnut A. hypogaea, an important source of good quality protein and oil, and A. pintoi and A. glabrata, that are utilized as forage species. Germplasm of most Arachis species is available in germplasm banks. However, little it is known about the genetic attributes of this germplasm, and mainly about its genetic variability, which is very important for its maintenance. In the present study RAPDs were used to assay the genetic variation within and among 48 accessions of five sections of the genus Arachis and to establish the genetic relationships among these accessions. Ten of 34 primers tested were selected for DNA amplification reactions since they yielded the largest numbers of polymorphic loci. A dendrogram was constructed based on data from the 10 primers selected. Eighty RAPD polymorphic bands were analyzed among the accessions studied. The relationships among species based on RAPDs were similar to those previously reported based on morphological, cytological and crossability data; demonstrating that RAPDs can be used to determine the genetic relationships among species of the different sections of the genus Arachis. In general, wide variation was found among accessions and low variation was found within the accessions that had two or more plants analyzed. However, higher polymorphism was found in the section Trierectoides and in one accession of A. major, indicating that generalizations should be avoided and each species should be analyzed in order to establish collection and maintenance strategies.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Axle bearing damage with possible catastrophic failures can cause severe disruptions or even dangerous derailments, potentially causing loss of human life and leading to significant costs for railway infrastructure managers and rolling stock operators. Consequently the axle bearing damage process has safety and economic implications on the exploitation of railways systems. Therefore it has been the object of intense attention by railway authorities as proved by the selection of this topic by the European Commission in calls for research proposals. The MAXBE Project (http://www.maxbeproject.eu/), an EU-funded project, appears in this context and its main goal is to develop and to demonstrate innovative and efficient technologies which can be used for the onboard and wayside condition monitoring of axle bearings. The MAXBE (interoperable monitoring, diagnosis and maintenance strategies for axle bearings) project focuses on detecting axle bearing failure modes at an early stage by combining new and existing monitoring techniques and on characterizing the axle bearing degradation process. The consortium for the MAXBE project comprises 18 partners from 8 member states, representing operators, railway administrations, axle bearing manufactures, key players in the railway community and experts in the field of monitoring, maintenance and rolling stock. The University of Porto is coordinating this research project that kicked-off in November 2012 and it is completed on October 2015. Both on-board and wayside systems are explored in the project since there is a need for defining the requirement for the onboard equipment and the range of working temperatures of the axle bearing for the wayside systems. The developed monitoring systems consider strain gauges, high frequency accelerometers, temperature sensors and acoustic emission. To get a robust technology to support the decision making of the responsible stakeholders synchronized measurements from onboard and wayside monitoring systems are integrated into a platform. Also extensive laboratory tests were performed to correlate the in situ measurements to the status of the axle bearing life. With the MAXBE project concept it will be possible: to contribute to detect at an early stage axle bearing failures; to create conditions for the operational and technical integration of axle bearing monitoring and maintenance in different European railway networks; to contribute to the standardization of the requirements for the axle bearing monitoring, diagnosis and maintenance. Demonstration of the developed condition monitoring systems was performed in Portugal in the Northern Railway Line with freight and passenger traffic with a maximum speed of 220 km/h, in Belgium in a tram line and in the UK. Still within the project, a tool for optimal maintenance scheduling and a smart diagnostic tool were developed. This paper presents a synthesis of the most relevant results attained in the project. The successful of the project and the developed solutions have positive impact on the reliability, availability, maintainability and safety of rolling stock and infrastructure with main focus on the axle bearing health.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose Managing and maintaining infrastructure assets are one of the indispensible tasks for many government agencies to preserve the nations' economic viability and social welfare. To reduce the expenditures over the life-cycle of an infrastructure asset and extend the period for which the asset performs effectively, proper repair and maintenance are essential. While repair, maintenance, minor alteration and addition (RMAA) sector is expanding in many developed cities, occurrences of fatalities and injuries in this sector are also soaring. The purposes of this paper are to identify and then evaluate the various strategies for improving the safety performance of RMAA works. Design/methodology/approach Semi-structured interviews and two rounds of Delphi survey were conducted for data collection. Findings Raising safety awareness of RMAA workers and selecting contractors with a good record of safety performance are the two most important strategies to improve the safety performance in this sector. Technology innovations and a pay-for-safety scheme are regarded as the two least important strategies. Originality/value The paper highlights possible ways to enhance safety of the rather under-explored RMAA sector in the construction industry.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This article proposes an interactional approach to the question of Russian language maintenance through the activity of bedtime story-reading in Russian-French bilingual families in French speaking Switzerland. Reading stories appears to be a language maintenance strategy commonly employed by the Russian speaking parent. The ritual and recreational moment of story-reading therefore becomes an opportunity for language learning. Drawing upon a language socialization perspective, this paper proposes an interactional analysis of the language use in the activity of story-reading. It shows how the language choice of the participants may be requested, negotiated and challenged during the interaction. The analysis further informs us about the language choice pattern and the bilingual competences in these families. We will gain insight into (Russian) language maintenance as a daily social and linguistic practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives The procurement research of Sydney Opera House FM Exemplar Project aims to develop innovative methods and guidelines for the procurement of FM services, applicable to iconic and / or performing arts centre facilities, or facilities with similar FM functions. The initial procurement report in June 2005 analysed the strategic objectives and operational requirements that provide ‘demand statements’ as evaluation criteria in the service procurement process. The subsequent interim procurement report in September 2005 discussed the elements contributing to the criteria for decision-making in the service procurement process. This procurement report concentrates on the research on procurement strategies and innovative methods using a case study approach. The objectives of this report are: • to investigate service procurement methods and process in iconic and/or performing arts centre facilities; • to showcase FM innovation in Sydney Opera House through a case study; • to establish a preliminary decision-making framework and guidelines for selection of appropriate FM procurement routes to provide a useful model for FM community. Findings Findings from this procurement research are presented as follows. • FM innovation and experience of Sydney Opera House • Innovative procurement methods and processes, drawn from a case study of Sydney Opera House as exemplar • An integrated performance framework to link maintenance service functions to high level organisational objective and strategies • Procurement methods and contract outcomes, focusing on building maintenance and cleaning services of Sydney Opera House • Multi-dimensional assessment of Service Providers • General decision-making strategies and guidelines for selection of appropriate FM procurement routes Further Research Whilst the Sydney Opera House case study emphasises the experience of Sydney Opera House, a study of procurement strategies and methods from published research and FM good practice will supply facilities managers with alternative procurement routes. Further research on the procurement theme will develop a final decision-making model for the procurement of FM services, drawn from the evaluation of the case study outcomes, as well as FM good practice and findings from current published research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Overloading truck traffic is an untenable problem around the world. The occurrence of overloaded truck traffic can be evidence of rapid development of an economy. Most of the developing countries emphasize the development of economy, thus supporting reform of infrastructure is limited. This research investigates the relationship between truck overloading and the condition of road damage. The objective of this research is to determine the amount of economic loss due to overloaded truck traffic is. Axle load will be used to calculate the total ESAL to pavement. This study intends to provide perspective on the relationship between change in axle load due to overloading and the resultant service life of pavement. It can then be used in the estimation of pavement damage in other developing countries facing the problem of truck overloading. In conclusion, economical loss was found, which include reduction of pavement life and increase in maintenance and rehabilitation (M&R) cost. As a result, net present value (NPV) of pavement investment with overloading truck traffic is higher than normal truck traffic.