889 resultados para Lease Contract
Resumo:
The Reference Schedule to the REIQ houses and land contract and the lots in a Community Titles Scheme (“CTS”) contract has been amended to contain provision for disclosure concerning the installation of an approved safety switch. This section will not be required to be completed if the land is vacant (in the case of the houses and land contract) or if the present use is a commercial use (in the case of the lots in a CTS contract).
Resumo:
The psychological contract is a key analytical device utilised by both academics and practitioners to conceptualise and explore the dynamics of the employment relationship. However, despite the recognised import of the construct, some authors suggest that its empirical investigation has fallen into a 'methodological rut' [Conway & Briner, 2005, p. 89] and is neglecting to assess key tenets of the concept, such as its temporal and dynamic nature. This paper describes the research design of a longitudinal, mixed methods study which draws upon the strengths of both qualitative and quantitative modes of inquiry in order to explore the development of, and changes in, the psychological contract. Underpinned by a critical realist philosophy, the paper seeks to offer a research design suitable for exploring the process of change not only within the psychological contract domain, but also for similar constructs in the human resource management and broader organisational behaviour fields.
Resumo:
The overall objective of this thesis is to explore how and why the content of individuals' psychological contracts changes over time. The contract is generally understood as "individual beliefs, shaped by the organisation, regarding the terms of an exchange agreement between individuals and their organisation" (Rousseau, 1995, p. 9). With an overall study sampling frame of 320 graduate organisational newcomers, a mixed method longitudinal research design comprised of three sequential, inter-related studies is employed in order to capture the change process. From the 15 semi-structured interviews conducted in Study 1, the key findings included identifying a relatively high degree of mutuality between employees' and their managers' reciprocal contract beliefs around the time of organisational entry. Also, at this time, individuals had developed specific components of their contract content through a mix of social network information (regarding broader employment expectations) and perceptions of various elements of their particular organisation's reputation (for more firm-specific expectations). Study 2 utilised a four-wave survey approach (available to the full sampling frame) over the 14 months following organisational entry to explore the 'shape' of individuals' contract change trajectories and the role of four theorised change predictors in driving these trajectories. The predictors represented an organisational-level informational cue (perceptions of corporate reputation), a dyadic-level informational cue (perceptions of manager-employee relationship quality) and two individual difference variables (affect and hardiness). Through the use of individual growth modelling, the findings showed differences in the general change patterns across contract content components of perceived employer (exhibiting generally quadratic change patterns) and employee (exhibiting generally no-change patterns) obligations. Further, individuals differentially used the predictor variables to construct beliefs about specific contract content. While both organisational- and dyadic-level cues were focused upon to construct employer obligation beliefs, organisational-level cues and individual difference variables were focused upon to construct employee obligation beliefs. Through undertaking 26 semi-structured interviews, Study 3 focused upon gaining a richer understanding of why participants' contracts changed, or otherwise, over the study period, with a particular focus upon the roles of breach and violation. Breach refers to an employee's perception that an employer obligation has not been met and violation refers to the negative and affective employee reactions which may ensue following a breach. The main contribution of these findings was identifying that subsequent to a breach or violation event a range of 'remediation effects' could be activated by employees which, depending upon their effectiveness, served to instigate either breach or contract repair or both. These effects mostly instigated broader contract repair and were generally cognitive strategies enacted by an individual to re-evaluate the breach situation and re-focus upon other positive aspects of the employment relationship. As such, the findings offered new evidence for a clear distinction between remedial effects which serve to only repair the breach (and thus the contract) and effects which only repair the contract more broadly; however, when effective, both resulted in individuals again viewing their employment relationships positively. Overall, in response to the overarching research question of this thesis, how and why individuals' psychological contract beliefs change, individuals do indeed draw upon various information sources, particularly at the organisational-level, as cues or guides in shaping their contract content. Further, the 'shapes' of the changes in beliefs about employer and employee obligations generally follow different, and not necessarily linear, trajectories over time. Finally, both breach and violation and also remedial actions, which address these occurrences either by remedying the breach itself (and thus the contract) or the contract only, play central roles in guiding individuals' contract changes to greater or lesser degrees. The findings from the thesis provide both academics and practitioners with greater insights into how employees construct their contract beliefs over time, the salient informational cues used to do this and how the effects of breach and violation can be mitigated through creating an environment which facilitates the use of effective remediation strategies.
Resumo:
LexisNexis Questions & Answers - Contract Law provides an understanding of contract law and gives a clear and systematic approach to analysing and answering problem and exam questions. Each chapter commences with a summary of the relevant cases and identification of the key issues. Each question is followed by a suggested answer plan, a sample answer and comments on how the answer might be assessed by an examiner. The author also offers advice on common errors to avoid and practical hints and tips on how to achieve higher marks.
Resumo:
The fourth edition of Contract Law provides a comprehensive review of the principles of contract law. Complex topics are explained in a clear and accessible style that and illustrated by succinct cases. This text is also available with a casebook which gives students access to an expanded selection of primary and secondary materials.
Resumo:
This case book contains the essential sections of the most significant cases in Australian contract law. Ready access to this collection of cases enables students to experience the law through the judges’ own words, and to develop the skills of interpreting and analysing cases in order to refine their understanding of the law. Excerpts from important statutes and writings are also included.
Resumo:
The greater volume of businesses sold in Australia each year are small to medium enterprises. The administration of business contracts presents far different challenges than, for example, contracts for the sale of goods alone or contracts for the sale of land. The subject matter comprises both real and personal, and tangible and intangible property. Other considerations that do not affect those other commonplace contracts include dealing with employees who are both remaining and departing, taking account of restraints of trade, and the phenomena of the passing of property being different in respect of different forms of property being transferred in the same contract. In keeping with the format of the previous edition, the book is written with the busy practitioner in mind. It deals with the formation of business contracts, all aspects of disclosure both contractual and statutory, the role of agents, and detailed consideration of the different types of subject matter of small business contracts including, the lease of the premises, intellectual property, goodwill, licences, book debts and plant and equipment. It has up to date treatment of income tax implications of the sale and the impact of the latest Commonwealth legislation on dealing with employees of a business on sale. Consistent with the last edition, the book has chapters on time of the essence and completion, personal securities, restraint of trade clauses, special conditions and remedies for breach by both parties and misleading or deceptive conduct by the seller. In relation to personal securities, whilst the current State and Territory based law on Bills of Sale and other Chattel Securities has been the subject of commentary, the proposed national reform agenda has also been commented upon although that legislation is not due until May 2010 at the earliest
Resumo:
Over the past 30 years the nature of airport precincts has changed significantly from purely aviation services to a full range of retail, commercial, industrial and other non aviation uses. Most major airports in Australia are owned and operated by the private sector but are subject to long term head leases to the Federal Government, with subsequent sub leases in place to users of the land. The lease term available for both aviation and non aviation tenants is subject to the head lease term and in a number of Australian airport locations, these head leases are now two-thirds through their initial 50 year lease term and this is raising a number of issues from a valuation and ongoing development perspective. . For our airport precincts to continue to offer levels of infrastructure and services that are comparable or better than many commercial centres in the same location, policy makers need to understand the impact the uncertainty that exists when the current lease term is nearing expiration, especially in relation to the renewed lease term and rental payments. This paper reviews the changes in airport precinct ownership, management and development in Australia and highlights the valuation and rental assessment issues that are currently facing this property sector.
Resumo:
The decision of Lockrey v Historic Houses Trust of New South Wales [2012] NSWSC 654 raises an interesting issue about the necessity of seeking the consent of the lessor where there is an assignment of a lease between joint tenants who already hold the lease when one joint tenant sells the business operated on the leased premises to the other joint tenant. A secondary issue raised by the proceedings concerns whether the lessor’s consent was unreasonably withheld under the processes under Retail Leases Act 1994 (NSW) (“the Act”) upon the grounds of lack of provision of information as to the remaining lessee’s financial standing.
Resumo:
The significance of the proposed name of a building to buyers of units off the plan has received recent attention in Queensland and the ACT with differing results. In Gough v South Sky Investments Pty Ltd the Queensland Court of Appeal concluded that the name of the building was not an essential term of the contract and rejected a claim by a number of buyers to terminate their contracts because of the change of name from Oracle to Peppers. In contrast, Rares J in the Federal Court decision of Madison Constructions Pty Ltd v Empire Building Group (ACT) Pty Ltd considered that the name of the building in a proposed development could potentially form the basis of misleading conduct about the association of the seller with a particular development corporation.
Resumo:
The aftermath of the Queensland floods of January 2011 continues to be played out in the courts. The effect of the floods on such a large scale has awakened the use of some statutory provisions that have not previously been litigated .Section 64 of the Property Law Act 1974 (Qld) is such a section. A version of this provision appears as s 34 of the Sale of Land Act 1982 (Vic). Broadly speaking, these sections permit a buyer of a dwelling house which has been damaged or destroyed between contract and completion to rescind the contract and recover their deposit provided that the rescission notice is given prior to "the date of completion or possession". The Court of Appeal decision of Dunworth v Mirvac Queensland Pty Ltd [2011] QCA 200 appears to be the first litigation upon the application of the section since it came into force in 1975.
Resumo:
Feedback, both formative and summative, enables students to reflect on their understandings and to restructure their thinking to develop their capabilities. It can also encourage positive motivation and help boost self-esteem. Online multiple choice questions can be an efficient and effective means of providing timely formative feedback. At the same time, locating learning in a narrative environment can facilitate engaging and effective learning experiences. Narratives can help learners to navigate through information and support cognitive and imaginative engagement. This article will discuss The 00 Files, an online suite of modules containing multiple choice questions situated in the narrative of a fictional law firm. It notes student responses to the program and discusses lessons that may be learnt from its development which may be of assistance to academics considering the development of similar programs for their courses.
Resumo:
This paper describes an empirical study to test the proposition that all construction contract bidders are homogeneous ie. they can be treated as behaving collectively in an identical (statistical) manner. Examination of previous analyses of bidding data reveals a flaw in the method of standardising bids across different size contracts and a new procedure is proposed which involves the estimation of a contract datum. Three independent sets of bidding data were then subjected to this procedure and estimates of the necessary distributional parameters obtained. These were then tested against the bidder homogeneity assumption resulting in the conclusion that the assumption may be appropriate for a three parameter log-normal shape, but not for scale and location.
Resumo:
Reports of immoral marketing practices i n the construction industry attract political, media and public but not much academic interest. This paper adopts a behavioural perspective and proposes a model for applying marketing ethics concepts and methods in the study of collusion in the construction contract market. An extensive multidisciplinary review of existing literature identified a lack of adequate conceptualisation of the mechanisms and decision making factors of collusive tendering. The process of developing the model is detailed in this paper. The objectives and methodology of the research project that tested the model are also outlined. The paper concludes with a brief note on the contributions and application of the proposed model.